瓦時容量 的英文怎麼說

中文拼音 [shíróngliáng]
瓦時容量 英文
watt hour capacity
  • : 瓦動詞(蓋瓦) tile; put tiles on a roof; cover (a roof) with tiles
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. The annual productive capacity of the major products are : 13. 8 thousand tons of melamine, 400 thousand tons of urea, 100 thousand tons of calcium carbide, 4000 tons of dicyanamide, 11 thousand tons of white carbon black, 10 thousand tons of edible liquid co2, 20 thousand tons of calcium cyanamide, 30 thousand tons of methanol, 10 thousand tons of formaldehyde, 50 thousand tons of n. p. k. compound fertilizer, 200 tons of guanidine nitrate and 500 tons dissolved acetylene. the calcium carbide is the fine quality product awarded by the state

    主要產品生產裝置能力為:年產總氨28萬噸,實物尿素45萬噸三聚氰胺1 . 35萬噸精甲醇3萬噸食品二氧化碳1萬噸電石10萬噸石灰氮2萬噸雙氰胺4000噸溶解乙炔500噸甲醛5萬噸白炭黑1 . 2萬噸熱電廠裝機3 . 6萬千,年發電3億千,供熱450萬吉焦耳機械廠年機加工2000噸綜合廠復混肥5萬噸。
  2. Shaoguan is an important power - generating center in guangdong, being capable of an installed capacity of nearly 2. 4 million kilowatts and an annual generation capacity of 10 billion kilowatt - hours

    韶關是廣東重要的電力基地,發電裝機近240萬千,年發電100億千
  3. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期3000千的火力發電廠,總供電能力超過7500萬千,日負荷達1 . 5萬千。區內代電網路齊全,供民線路覆蓋城鄉。
  4. The lfg collection and utilization is company know how that is demonstrated at a site in meizhou, guangdong province that currently collects 2000 m3 hr of gas and treats all the leachate from the site, 2 mw electrical power plant will be installed on the site to utilize the collected gas soon

    該技術在中國梅州市進行了試點,現回收沼氣能力為2000立方米小,同循環處理該填埋場的全部滲濾液,並計劃近期在該填埋場建設裝機2兆的發電廠,使用回收的沼氣發電。
  5. Hebi hasreliable power grids with over 2000 mva substation capacity and 5. 5 billion kw of annual power supply

    城區內供電能力充足,電網結構合理,自動化水平高,供電可靠性強,年供電55億千,變電2000多兆伏安。
  6. The installed capacity is 1. 85 million kw, with a generation capacity of 7 billion kwhs annually, and transmitted power of over 2 billion kwhs

    全市發電裝機達185萬千,年發電近70億千,外輸電力20多億千
  7. Comparing with the current observations, which include the number density distribution in space, mass function, etc., the so - called standard modes for both the power law and gaussian cluster initial mass functions are selected among many runs of simulations. the deviation from the standard modes, which is resulted from the change of the parameter for the initial conditions, is discussed in detail. the discussion of the model parameters is also presented although they are adopted as the typical values based on previous work

    對應一定的初始分佈我們發現無論是冪律的還是對數高斯的球狀星團初始質譜經過長間的動力學演化都會得到和現在銀河系觀測到的球狀星團系統相符的對數高斯的質分佈;動力學演化會明顯地改變球狀星團系統的空間密度分佈,靠近銀心區域的球狀星團解得更多;經過動力學演化后的球狀星團速度分佈函數在靠近銀心的區域明顯得不同於初始分佈,初始擁有較大軌道偏心率的球狀星團更解。
  8. Establishing 3 - d terrain models with vector contour lines and elevation terrain models with the help of the determination of space corresponding relations between contour lines, tile operation and branch operation. explanation of real - time reflection of terrain models, including three algorithms in lod technology, compared with quadtree algorithm, roam algorithm and the algorithm based on the intermediate belt, to show the advantages and disadvantages of the different situations of the terrains, so as to find out the right algorithm, the quadtree algorithm. developing and implementing the fast demonstration on the vc platform with three - dimentional visualization techniques, such as vrml and opengl, providing a persuasive argument for the research

    論文首先概括介紹了用等高線快速建立3d地面模型和顯示的相關技術,並論述了課題研究的背景和選題依據;其次,論文闡述了如何對等高線數據進行預處理,提出了有效的得到矢化等高線的方法;再次用矢化的等高線數據建立三維地面模型,通過等高線間的對應關系的確定、片操作、分支操作建立地面的高程模型;然後論文對地面模型的實渲染問題進行了深入闡述,主要是從lod技術的三種演算法著手進行研究,通過對比四叉樹演算法、 roam演算法和基於過渡帶演算法對不同種情況的地面數據顯示的優缺點,再結合本系統的地形數據的特點選擇了適合的演算法:四叉樹演算法;最後,用vrml和基於opengl的三維可視化技術在vc平臺上開發並實現了地形的三維快速顯示系統,為論文的研究內提供了有力的論證。
  9. The state ’ s total installed electric capacity reaches 385 gw, electricity generation is 1908 billion kwh and electricity consumption grows to 1891 billion kwh in 2003. however, it faces a severe situation that electric power is in short supply as a whole

    2003年全國的發電裝機達到3 . 85億千,全國發電達到19080億千,用電達到18910億千,電力供需形勢總體緊張,缺電較為嚴峻。
  10. Hebi power plant 2 x 600, 000 kwh of power plant construction started construction phase, 2 x 13. 5 kwh cogeneration project is to be completed, and at that time the generating capacity will reach 260 million kilowatts

    鶴壁電廠2 60萬千的三期工程已開工建設, 2 13 . 5千熱電聯產項目即將完工,屆全市發電裝機將達到260萬千
  11. It was no easy matter that day to penetrate into the great hall, then reputed the largest roofed - in space in the world. ( it is true that, at that time, sauval had not yet measured the great hall of the castle of montargis

    司法宮大廳在當被譽為舉世無雙的大廳(誠然,索爾那還沒有丈過孟塔吉城堡的大廳) ,這一天要擠進去卻不是易的事。
  12. Water power resource is the most in the coastal area of fujian province, theory contain is 260, 000 kw, 174, 000 kw of which is available for development, among them 155, 700 kw are able to set up single hydropower station with 100 kw or more, the annual amount of generate electric power is 0. 652 billion kwh

    水力資源居福建省沿海縣區之最,理論蘊藏達26萬千,可開發的裝機17 . 4萬千,其中單站裝機100千以上約15 . 57萬千,年均發電6 . 52億千
  13. The district has a total length of 850 - kilometer electricity - supply aerial cable, and 1, 700 transformers for 10kv with a capacity of 1, 700, 000kva. the annual electricity consumption of the district is 1. 6 billion kwh

    全區10千伏架空配電線路全長850公里, 10千伏配電變壓器1700餘臺,170萬千伏安,年用電16億千
分享友人