甘特圖表 的英文怎麼說

中文拼音 [gānbiǎo]
甘特圖表 英文
gantt chart
  • : Ⅰ形容詞(使人滿意的; 甜) pleasant; sweet Ⅱ動詞(自願; 樂意) be willing to; be contented or sati...
  • : Ⅰ形容詞(特殊; 超出一般) particular; special; exceptional; unusual Ⅱ副詞1 (特別) especially; v...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
  • 甘特 : gandt
  1. The calendar view, for example, displays tasks as bars that stretch across days, weeks, and months. the gantt chart view is the most commonly used chart view

    譬如, 「日歷」視將任務顯示為跨越天、周和月的條形; 「」是最常用的
  2. The author expatiated on the basic structure, coding manners, decoding rules, fitness function selection, self - adapted mutation and crossover operator, the judging flow of chromosome feasibility of the algorithm, finally, put forward the computing result with pattern of data table and gantt graph

    詳細地闡述了演算法的基本結構、編碼方式、解碼規則、適值函數的選取、自適應變異和交叉運算元的設計、染色體可行性的判斷流程,最後以數據的方式給出了計算結果。
  3. For sheet views, such as the gantt chart view and the resource usage view, microsoft project supplies default names for column headings, such as task name and resource name

    Microsoftproject自動為工作(如「」視和「資源使用狀況」視)提供默認的列標題名稱,如「任務名稱」和「資源名稱」 。
  4. If you want to create a visual representation of the progress of your project, you can display progress lines on your gantt chart

    如果要直觀地示項目進度,則可以在「」上顯示進度線。
  5. The chart portion of a gantt chart view

    」視中的部分。
  6. When you split a task, you divide it into portions, each portion represented by a separate bar in the gantt chart view

    拆分任務時,將任務拆分為任務塊,在「」視中,每一任務塊用獨立的條形示。
  7. On the basis of the loess distribution, engineering geology and specific properties of road use in gansu province, this paper divides traffic volume grade according to the conditions of transportation of all high - grade highways which are being built and have already finished. besides, it analyses the relativity of three different test methods, establishes the related relations, and divides their strength grade after measuring rebound module of subgrade of the representative high - grade highways in gansu loess area. furthermore, it recommends the common semi - rigid and asphalt concrete design parameters by comparing the experiment in doors to outdoors, and draws up the optimized design program aga - lq based on advanced genetic algorithm and solves the non - liner optimization design model of asphalt pavement construction by computer

    本文基於肅黃土分佈、工程地質及路用性研究,對該黃土地區在建和已建的全部高等級公路交通狀況進行了詳細調查和分析,劃分了交通量等級;對肅黃土地區代性的高等級公路,利用三種不同方法實測了土基回彈模量,分析了各測試方法的相關性,建立了相關關系,對土基回彈模量進行了強度等級劃分;通過室內外試驗比較,推薦了常用的半剛性材料和瀝青混凝土設計參數值;利用計算機編制了基於改進遺傳演算法的優化設計程序aga ? lq ,並成功求解了瀝青路面結構非線性優化設計模型;最後經計算提出了肅黃土地區高等級公路瀝青路面典型結構,並編制了查詢庫軟體cx ? lq ,供設計單位直接選用,科學簡便地解決了肅黃土地區的路面設計問題。
  8. Displays task details, the timesheet, and the gantt chart

    Pjgrid11 . ocx顯示任務詳細信息時間
  9. In the gantt chart view, you not only see your tasks as you enter them, but you also see additional task information that microsoft project provides in the view fields ( which are represented by columns )

    在「」視中,不僅可以在輸入過程隨時看到任務本身,還可以看到microsoftproject在視的域(以列的形式示)中提供的附加任務信息。
  10. 2. in the views list, click detail gantt or tracking gantt, and then click apply.

    2 .選擇「視」列中的「詳細」或「跟蹤」 ,然後單擊「應用」按鈕。
  11. Task and duration list with gantt chart showing tasks, durations, task dependencies, and assigned resources

    任務和工期的列,顯示任務工期、任務相關性及所分配的資源的「
  12. Gantt chart view, with tracking table and all tasks filter

    」視,使用「跟蹤」和「全部任務」篩選器
  13. On gantt charts, to display symbols on a summary task bar that represent dates from subtasks

    」中,在摘要任務條形上顯示示子任務日期的符號。
  14. A graphic element on a gantt chart representing the duration of a task

    中代任務工期的形元素。
  15. Gantt chart view, with entry table and summary tasks filter

    」 ,使用「項」和「摘要任務」篩選器
  16. Project phase list ( all summary tasks ) with durations and the chart portion of the gantt chart view

    項目階段列(所有摘要任務) ,包括工期和「」的部分