用鉤做成的 的英文怎麼說

中文拼音 [yònggōuzuòchéngde]
用鉤做成的 英文
hooked
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : Ⅰ名詞1 (鉤子) hook 2 (漢字的筆畫) hook stroke in chinese characters3 (鉤形符號) hook like m...
  • : 動詞1 (製造) make; manufacture; produce 2 (寫作) write; compose 3 (從事某種工作或活動) do; ...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : 4次方是 The fourth power of 2 is direction
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同托換方案和節點及構造設計,提出了「通筋穿柱法」承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」地基梁鋼筋連接點等多項技術;在施工方案研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性施工技術措施,人工挖孔樁施工採鋼筋砼護壁確保挖孔樁安全型,使柔性連接進行鋼筋籠吊裝簡化施工工序;承臺梁施工採梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採土方分層對稱平衡開挖,分段挖土筏基結構自穩等;最後對于該工程實施后效果分析,說明該項綜合施工技術可行性。
  2. Secondly, we implement a bpf model called mybpf on linux as a kernel module. it can collect packets within the netfilter frame, provide the applications with an interface in char device file manner and be attached to the nf _ ip _ pre _ routing hook defined by netfilter frame for ipv4 as a hook function. finally, we evaluate the performance between mybpf and other bpf on sock _ packet socket

    該模塊以字元設備文件形式為應程序提供介面,並在netfilter框架為ipv4定義nf _ ip _ pre _ routing子上掛接了一個子函數,該子函數實現bpf虛擬機,完對數據包捕獲;最後,本文對mybpf模塊作了相應測試並與在sock _ packet套介面上實現bpf了性能比較。
分享友人