監控通道 的英文怎麼說

中文拼音 [jiānkòngtōngdào]
監控通道 英文
supervision channel
  • : 監名詞1. (古代官府名) an imperial office 2. (姓氏) a surname
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : 通量詞(用於動作)
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 監控 : supervisory control; monitor; control監控程序 monitor routine; 監控器 monitor unit; 監控室 [工業]...
  • 通道 : thoroughfare; passageway; pass; enterclose; gallery; drong; tunnel; avenue; alure; way; row; key ...
  1. This paper describes the components and structure of advanced signaling system : automatic train control system ( atc ), analyzes the function and classification of its three subsystems : ats, atp and ato, with emphasis on currently widely adopted atc system - quasi - moving - block signaling system, which works on coded digit track circuit, and discusses the operating principles of coded digit track circuit and the features of train control of quasi - moving - block signaling system

    信號系統是確保城市軌列車運行安全及提高運營效率的關鍵設備。本文詳細討論了應用於城市軌的先進的信號系統? ?列車運行自動制系統( atc )的組成和結構,對其三個子系統:列車自動系統ats 、列車自動保護系統atp 、列車自動運行系統ato的功能和分類進行了詳細分析和比較。
  2. Information on the enterprise cosacom gmbh kommunikationsanlagen erfurt and their services, like alarm installations and radio technology on one hand and danger reporting systems and reporting systems on the other, is available in the firm profile

    是一家工業型企業,該企業製造高精度的信系統,管傳送設備,視頻技術,其它機械和設備,其它機械製造產品。
  3. The water - depth computer monitoring system collects data from gps, multi - frequency fathometer ( 16 frequencies ) and plc network. based on the analysis of these data, a three - dimensional underwater ground profile is presented for the scheduled area of geotextiles - laying, the development tool of the three - dimensional underwater ground profile is opengl. this thesis is organized into five chapters

    水深計算機系統採集來自gps 、多測深儀( 16)以及plc網路的數據,將這些數據進行處理后,顯示待鋪設軟體排的小區域內的三維水下地形,三維地形的開發採用目前國際上流行的三維圖形介面opengl 。
  4. Aiming at the present design fashion of domestic bigger tunnel, simulating a bigger tunnel with catholic characteristic, confirming the parameters of traffic inducement and controlling ( tunnel length, traffic, the selection and location of detection equipments, amount of roadway indicative lamp, etc ) on the base of the analog tunnel, discussing the controlling and revulsive mode of tunnel. briefly discussing the constitution of tunnel surveillance and controlling system and the executive means of traffic controlling and inducement subsystem and network structure of tunnel controlling system. finally discussing the conformation of emulational tunnel ' s database and detailed executive program by programming the computer emulation of controlling induce subsystem

    論文圍繞「交誘導與制」這一中心展開,探討長大隧誘導與制設備及其制誘導方式;結合國內外對交流模型研究的成果,提出一套適合長大隧流特點的交流模型;並針對目前國內長大隧的普遍設計方式,模擬一個帶有普遍性特徵的長大隧,確定了關于交誘導與制方面的參數(隧長度、交量、檢測設備的選取和位置、車指示燈的數目等) ;以此模擬隧為基礎,進一步探討隧的具體制與誘導方式;簡要探討隧系統的構成、交制與誘導子系統的實現方式,隧制系統的網路架構;最後過編程實現制與誘導子系統的計算機模擬,討論關于模擬隧數據庫的構建,具體編程實現等。
  5. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    過地質分析、類比分析、量測、數值模擬、神經網路等方法,對鷓鴣山隧潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  6. 4. the order - driven information sharing and tracking mechanism is introduced based on a new transparent information channel through which users can rapidly and facilely get related - information to examining production process, and finally a calculating method of order rate of process is designed

    過建立一種新的透明信息,用戶可以在自己的權限內方便、快速地查詢和獲取自己想要的相關信息,對訂單執行進度、執行過程進行實時,以保證訂單的完成。
  7. The ina128 is used by left leg ' s driver circle and the aims are to enhance the cmrr and reduce the disturbance of 50hz. the part of a / d transmitting chip is the adc0809 which have a eight - channel transmitter, a eight - bit a / d transmitter and the logical control by microprocessor

    考慮到家庭護的實際應用,精度的要求不是很高, a / d轉換器採用的是adc0809 ,它有8多路轉換器、 8位模/數轉換器和與微處理器兼容的制邏輯電路。
  8. " highway facilities " mean drainage facilities ; protection installations ; crossroads ; boundary markers ; survey stakes ; safety, communications, checking, supervision, control, maintenance, and service facilities ; flower beds ; lawns ; trees ; and special - purpose buildings

    「公路設施」是指公路的排水設備、防護構造物、交叉口、界碑、測樁、安全設施、訊設施、檢測及設施、養護設施、渡口碼頭、花草林木、專用房屋等。
  9. The difficulty and focus of long tunnel tsc system are ventilation control subsystem and fire detection subsystem

    長大隧系統中隧制和隧火災檢測報警系統是系統的難點和焦點。
  10. The underwater - radio buoy for use as obtaining the ocean " s acoustical parameters is a underwater acoustic signals record system which has long distance radio remote control and data transmit function. the technology key of the dissertation study is that under the requirements of the system the monitor and record equipment on the acoustic source vessel, the monitor and record equipment on control vessel command and control the work slate of the buoy system by radio data transmitting mode of short wave transmitter - receiver

    海洋環境參數獲取浮標測系統屬于具有長距離無線電遙?數傳功能的水下聲信號接收記錄系統,本論文研究目標的技術關鍵在於根據系統要求,指揮船和發射船記錄設備過短波電臺以無線數傳方式,對浮標系統的工作狀態進行指揮和制,浮標則過同一短波向指揮船上報浮標方位、工作狀態、關鍵數據及非常狀態下的報警信號等。
  11. The article consists of three parts mainly : the first part has described the method of detecting the faint signal, mainly include : detection technique of faint signal, principle of the optical fibre sensor, the little lose effects when optic fibre little curved, and the research of the stress sensor of optical fibre. the second part emphasizes on the design of the intelligent photoelectricity system, mainly tells the design of the circuit to process the faint photoelectricity signal, details the software and hardware design of intelligent photoelectricity system made of single chip microcontroller, led, man - machine interface, communication interface, etc. the third part is the network communication of the detection system, details the technology of single chip microcontroller how to group the network, and the communication between single the chip microcontroller system and the modem, and how to realize the data between the field and computer central exchanged through the existing public phone network

    文章主要分為三部分:第一部分論述了微小信號的檢測方法,主要包括微小信號的檢測技術、光纖傳感器的原理、光纖微彎損耗效應及光纖應力傳感器的研製;第二部分重點講述了智能光電檢測系統的研製,主要講述了微弱光電信號調理電路的設計及由前(后)向、單片機、 led 、人機介面、信介面等組成的智能光電系統的軟硬體的具體設計;第三部分為檢測系統的網路信部分,具體闡述了單片機系統間的組網技術、單片機和modem之間的信及過現有的公用電話網路實現遠程的技術,實現現場檢測系統與橋梁測中心的數據交換。
  12. Applications of wireless sensor network in road traffic monitoring are rapidly expanded

    摘要無線傳感器網路在路交中的應用日益廣泛。
  13. Then one remote supervision system based on virtual instrument technology is studied and realized. the system can measure parameters such as signal level, carrier frequency and snr of remote channel, and can estimate the state of remote channel based on this parameters, and can display the time - domain and frequency - domain wave real time of remote channel, too

    針對目前遠動方案的不足,研究並實現了基於虛擬儀器技術的電力遠動系統,該系統可以對遠動收發信電平、載波頻率和信噪比三個參數進行測量,具有實時時域波形和功率譜波形顯示功能,並能根據參數對狀態進行綜合判斷。
  14. Based on yulingguan twin - arch tunnel, the author regards the structural design of tunnel as relatively reasonable by virtue of analyzing the results of tunnel field monitoring measurement, while some aspects of tunnel construction still remain to be improved

    本文以昱嶺關連拱隧為研究背景,過對隧現場量測結果分析,認為隧結構設計較為合理,而隧施工中存在一些需要改進的方面。
  15. However the data transferred from the jk2000 system must be deal with. thus the realization of management information system in locomotive depot and so on must be completed as soon as possible. there are lots of work which are being done in handwork fashion still in more than 100 locomotive depots, such as drawing locomotive turnover picture and managing the dispatching of stewards and the reporting of data to leadership units and so on

    然而,裝置中的數據要求轉移到地面進行相關的處理,因此鐵部機務局、鐵路局、鐵路分局、機務段實現信息化管理迫在眉睫;全國100多個機務段運用室的管理有的目前還是停留在原始的手工作業方式上,例如:機車周轉圖的繪制,乘務員派班管理,定期過人工傳遞報表數據上報到上級單位等等。
  16. On the basis of the practice on work of extra - insufficient control and the subsidence of vault and the earth ' s surface, cases of engineering surveying techniques applied in the construction supervision in tunnels are discussed

    摘要過超欠挖制、拱頂下沉、地表下沉的工程實踐,討論在隧施工量測中工程測量技術的應用情況。
  17. Through on site test, it is proved that the system is valid and reliable

    實驗和現場測試表明,本系統是一種比較完善的遠動方案。
  18. In addition, for its application in unattended substation, important traffic crosses, hydrological observation and the monitor of frontiers and coastal fronts and so on, remote video monitoring system plays a key role in motoring system

    另外,一些特殊的應用如無人值守變電站、交管理、河水文測、邊海防等,遠程視頻系統不可缺少的最主要的功能。
  19. At the same time, the assay analyzes and illustrates on ochsp and omsp at detail. based on the design of wdm optical net scheme, this assay write o - apsp, which utilizes k1, k2 that come from osc to sending failure messages of nodes. it also built aps model which grounded on oms

    在對wdm光網路結構實現方式詳細研究的基礎之上,本文編寫了光網路自動保護倒換協議( o - apsp ) ,利用來自光監控通道( osc )的k1 、 k2aps倒換位元組來傳送節點故障信息,建立了基於光復用段自動保護倒換模塊。
  20. The upside host computer fasten on controlling each downside i / o interface crate on the communication chain, and downside i / o interface crates directly connect with control panel or other hardware devices and dispersedly control each input and output channels of the interface system

    上位主機集中信鏈路中各個下位i o介面機箱,下位i o介面機箱直接連接制盤臺或其它硬體設備,分散制介面系統的各個輸入輸出
分享友人