監測高溫計 的英文怎麼說

中文拼音 [jiāngāowēn]
監測高溫計 英文
sentinel pyrometer
  • : 監名詞1. (古代官府名) an imperial office 2. (姓氏) a surname
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 監測 : monitor; survey監測車 monitoring car; 監測船 monitoring ship; 監測電臺 [訊] monitoring station; ...
  • 高溫 : high temperature; elevated temperature; hyperthermia; megatemperature; inferno
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋控細則、組織機構及控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與工作的前期實驗工作和施工各工況標、各節段支模標、澆注混凝土后的標的結構算和其理論算結果之後,詳細論述了主梁的標線形控制方法和內容,實際支模標的提出,結構應力控的方法、布點、讀及其對讀數據的合理分析方法,索力檢和結構的方法。
  2. Besides, the growth of gasb expitaxy film was monitored by reflection high energy electron diffraction ( rheed ). the rheed images and intesity oscillation are collected by computer system. it showed that the gasb film prepared in 400 was amorphous and it became monocrystalline when the temperature rose to 500. atomic force microscope ( afm ) was applied to analyse the surface morphology of the films which were grown in diffrent growth rates or substrate temperature. the analysis were compared to simulation results. the experiment results indicated it was easy to form clusters when the rate of growth is high or

    此外,本文通過反射式能電子衍射( rheed )了gasb外延薄膜的生長,利用rheed強度振蕩的算機採集系統實現了rheed圖像和rheed強度振蕩的實時。實驗發現在400生長的gasb薄膜為非晶態,度升到500薄膜轉變為單晶。利用原子力顯微鏡對不同生長速率和襯底度生長的gasb薄膜的表面形貌進行觀察分析,並與模擬結果進行比較。
  3. Users can set parameters of the transfer facility conveniently by keyset and lcd. the power monitoring, alarm system and hint functions enhance the reliability and security of the system. the function of temperature compensation eases the discomfort of patients brought by too low temperature of liquid

    通過控制鍵盤和lcd ,使用者可以方便地對輸液器進行參數設置;電源和報警提示功能提了系統的可靠性和安全性;度補償功能減輕了藥液度過低時給輸液者帶來的不適;參數設置記憶功能顯示了系統設的人性化特點。
  4. Aimed at the present status of detecting oil storage fluid, the article advances a method which utilizes the dramatic feature of optical fiber sensor to develop the optical fiber liquid height meter, and to substitute the manual examination means, and supplements the optical fiber liquid overhead alarm equipment, the optical fiber grating temperature sensor, and uses the network technique to build the optical fiber sensing safety supervisory system to realize the intelligent examination of oil - tank area, thereby avoids or decreases occurrence and the risk of accident, and supplies the reliable guarantee for the big - and - middle - sized tank farm safe production

    本文針對儲油液位的檢現狀,提出利用光纖傳感器的特點研製光纖液位,取代手工檢的方法,輔以光纖液位位報警器,光纖度傳感器,並應用網路技術構建光纖傳感安全系統,實現石油罐區的智能,從而避免或減少事故的發生,降低風險,為大中型油庫的安全生產管理提供可靠的保障。本文首先對安全系統中的核心硬體? ?光纖液位的工作原理及特點進行了介紹。
  5. And the choice range of hydration coefficient is determined on calculating mass concrete of foundation in high - rise building. at last, combining the test data with the ansys result, some measures about crack - control in construction are summarized. it can be referred to the study on mass concrete of foundation in high - rise building for interaction between concrete temperature field and soil temperature field considered, choice range of hydration coefficient determined, and measures about crack - control in construction summarized in this paper

    最後,結合現場的數據和ansys算的理論值,對層建築基礎大體積混凝土的度裂縫的控制提出了有效的控制措施本文提出考慮混凝土與土壤相互作用的度場,確定的層建築基礎大體積混凝土度場算時的水化系數的取值范圍以及建議的現場度裂縫的控制措施,對今後建築工程大體積混凝土的研究具有一定的參考價值。
  6. There are several important issues to that attention should be paid in the design of test bed, such as the measurement of the temperature difference between the inlet and outlet of test section and the temperature of cooling water in the inlet and outlet of condensing tubes, filled volume of the steam boiler and its level control, the determination of the natural acting head of high temperature tank and design of the cooling water flow of measuring tank

    試驗臺由工質自然循環子系統、冷卻水機械循環子系統和算機控制子系統構成,試驗段進出口差及冷凝管進出口度的試、蒸汽鍋爐充注量及液位控制、水箱自然作用水頭的設、冷卻水流量量水箱的設等是試驗臺設中值得重視的問題。
  7. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據層建築超厚底板大體積混凝土承受的差主要是均勻差和均勻收縮的特點,闡述了大體積混凝土度應力理論算的簡化方法和最大整澆長度的算方法,同時根據大體積混凝土度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土度裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚底板施工為實例,從大體積混凝土度應力算、混凝土保材料厚度算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和澆築以及大體積混凝土內部度的和後期養護等方面進行了理論應用。
  8. The paper studies the mechanism of the monitoring system and gives it ' s structure. considering the practice, the software is compiled which is based on win98 dll and used to control the sample and disposing data

    提出了微水含量在線系統的工作原理及實施方案,設了系統的整體硬體結構以提量的準確度和穩定度並降低度的影響和雜散干擾。
  9. On hardware and soft ware, good anti - disturbances measures has been adapted considering environmental factors such as high altitude, temperature difference. the anti - disturbances ability was enhanced. cooperation of hardware and software make hardware circuit simple and little effect of zero point shifting, and easy for software system to be modified. after the hardware component and the software component of on - line

    在硬體和軟體的設上,採取了較好的抗干擾措施,充分考慮大海拔等各種環境因數,提系統的整體抗干擾能力,採取軟體和硬體相互配合的方法,使硬體電路相對簡單,系統受零漂移的影響較小,同時對軟體系統的改進較為容易。
  10. In this paper, an oil tank monitoring system that consists of the optical fiber liquid level meter, optical fiber grating temperature sensor and optical fiber overhead alarm equipment is formed through the optical fiber technology

    本文利用光纖傳感技術研製的光纖液位,光纖光柵度傳感器,光纖液位位報警器組成油罐區系統,使得現場完全避免電信號,安全得到可靠保障。
  11. Then this article analyzes the way to obtain the power of measuring device. also it recommends two kinds of feasible schemes of mutual inductance power and solar power, and proposes a power supply scheme that is called " the optic fiber supplying power " in the paper. the feasibility of this scheme is also analyzed here

    文章接著對量裝置的電源獲取途徑進行分析,介紹了互感供電和太陽能供電兩種可行的方案,並提出了本文稱之為「光纖傳光供電」的供電方案,具體分析該方案的可行性,並設了該方案的主要組成部分解決了中壓系統參數量中的兩個共同問題以後,文章設了中壓系統度在線裝置。
  12. At the same time, this subject perfectly expatiated on the developing course of this on - line monitoring system and the design of the function module and parameter configuration

    同時還完整地介紹了基於虛擬技術的風機在線系統的研製過程,講述了各種功能模塊的設及參數配置。
  13. This paper mostly is consisted of three parts, which is vibration of rotating machinery and vibration failure analyzes, the collectivity design project and the realization of software

    本論文主要分三部分:旋轉機械振動機理及振動故障分析、燒結廠風機在線系統的總體設方案和網路通訊模塊及上位機系統的實現。
  14. The whole design of on - line monitoring system is built in this subject, which system is based on data stream status, running characters, the requirements for in - situ monitor, communication technology and database knowledge. this system used graphic programming language labview for software developing tool and the production of rockwell for hardware

    根據風機系統數據流量狀況、機組運行特點及現場要求,結合網路通訊技術和數據庫知識,以圖形化設語言labview為開發平臺,以美國羅克韋爾自動化公司的硬體模塊為基礎,構建了在線系統的總體設方案。
  15. In this paper we establish math modal of transient temperature and stress fields of the turbine " rotor with finite element method, develop rotor ' s thermal status online monitor system by distribute computer and visual software, realize online show and analyst of temperature and stress fields when all kinds of transient condition, and finally provide reasonable and optimized operation suggestions, improve safety and economic level of unit sets " operation

    本文採用有限元建立汽輪機轉子的暫態度場、應力場的數學模型,藉助算機分散式算、可視化等技術開發轉子的熱狀態在線系統,實現汽輪機在各種過渡工況下轉子度場、應力場的在線顯示與分析,提供合理的操作建議,提機組運行的安全性與經濟性。
  16. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要剖析了各種開采方式及其對地震特性的影響;利用理論算、巖心分析、油藏數值模擬三種方法確定了流體替代對縱波速度的影響;通過對長期水驅造成的物性參數、井曲線以及油藏度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究中存在的盲區?沒有充分考慮長期注水造成的物性、度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,29斷塊水驅四維地震可行性研究結果表明:四維地震注水前沿可能要比油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
  17. Aiming at mulongtan hydropower station, this paper introduces the meaning of and protection about the temperature of hydro - generating units, the system composition, the configuration and work elements of sensors anti instrument, the means of realization with plc for temperature protection, and puts forward several measure of enhancing the temperature control system

    摘要水輪發電機組度的是機組安全運行的重要保證,是水電站算機控系統的重要參數,介紹了木龍灘水電站水輪發電機組量和度保護系統的一般組成模式,傳感器、儀表的配置與工作原理,及採用plc實現度保護的方法,並提出了提控系統可靠性幾點措施。
  18. On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully

    壓斷路器所造成的事故無論是在次數,還是在事故所造成的停電時間上都占據總量60以上。因此,及時了解斷路器的工作狀態對提供電可靠性有決定性意義;並可以大大減少盲目定期檢修帶來的資金浪費。本文論述了斷路器機械特性參數方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性視和二次迴路保護結合起來,給出具有完整性視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器額定短路電流分斷次數,算每次分閘對應的觸頭電壽命損耗,預觸頭電壽命;提出根據斷路器殼體度和斷路器周圍空氣度結合斷路器熱阻來算斷路器主觸頭穩態升的方法,並根據此時的負荷電流間接算主觸頭迴路的電阻;在硬體電路設上,採用美國ti公司最新推出的一種功能強大的單片機msp430 ,並充分考慮該晶元的適用電壓范圍給設帶來的特殊問題;在通信模塊的設中,解決了不同工作電壓晶元之間的介面問題,並給出了直接聯接的接線方案。
  19. On the base of the research, the function and principle of the superficial temperature on - line inspection of the many paralleled rotating kiln is designed, and the software and hardware of the intelligent control of the scanner is researched, and the change rule fuzzy control theory and technique is brought forward and put in practice. in order to improve the inspecting precision and reliability of the system, many ways to dispose the temperature data are researched

    在對多平行回轉窯表面度紅外在線功能及原理的分析、設的基礎上,著重對紅外掃描智能控制軟硬體進行了研究,提出、實施了紅外掃描儀跟蹤、定位的變規則模糊控制理論與技術;探討了度數據的多種預處理方法,提了系統精度、可靠性。
  20. Study on stress variation around deep outlet for danjiangkou dam heightening

    大壩加試驗度應力模擬算與原型對比分析
分享友人