直立墻 的英文怎麼說

中文拼音 [zhí]
直立墻 英文
upright wall
  • : Ⅰ形容詞1 (成直線的; 硬挺的) straight; stiff 2 (跟地面垂直的; 從上到下的; 從前到后的) erect; v...
  • : 動1 (站) stand; remain in an erect position 2 (使豎立; 使物件的上端向上) erect; stand; set up...
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • 直立 : up-right; stato-直立莖 [植物學] erect stem
  1. Step irons with upstand for staggered manhole steps - part 1 : step irons to be fitted in masonry or set into concrete

    人孔錯列階梯腳扣.第1部分:砌或澆灌混凝土階梯
  2. The r esults of calculation and analysis indicate : the bracing effect from wallboard increases the load capacity of wall stud by 1. 6 - 1. 8 times ; the reasonable distance between fasteners of wall stud is l / 8, l is the length of wall stud ; there is no necessity to considering bracing effect from wallboard in the direction of perpendicular to wallboard

    分析結果表明:考慮支承效應后,柱的承載能力比原來提高了1 . 6 1 . 8倍:板連接件間距取s = l / 8較為合理, l為柱的長度;可不考慮板對柱沿垂面方向提供的支承效應。
  3. Until 1940 english was standing alone against germany while america sat on the fence, refusing to show its colours

    到1940年,英國一單獨對抗德國,而美國則抱騎態度,不肯表明自己的場。
  4. Technological innovation is the development of enterprises in the last word, i have always maintained the secretary rise in special wallssevered the forefront of the core system, in 2000, the high - intensity of my invention cesium potassium glass chip. test success has been on the market seven years, 2007 to special ( fire ) glass wallsindoor fire glass partition, fire glass window design, construction and 10 years of deep - processing glass curtain wall designconstruction and constantly sum up experience and experiment, glass walls severed system to fire. high temperature must be within the framework of anti - bomb material support fixed glass in the event of fire. at the time of the explosion have enough time to ensure the integrity of the entire system. bullet - proof glass or glass does not fire in a short period of time due to damage fixed framework, a glass panel fell off, lost the fire or bomb - functional

    企業不斷的技術創新是我們發展的硬道理,也是我司一保持林於特種幕、隔斷系統前沿的核心, 2000年,我司發明的高強度單片銫鉀防火玻璃,經試驗檢測成功推向市場以來已有7個年頭,七年來特種(防火)玻璃幕、室內防火玻璃隔斷、防火玻璃門窗的設計、施工及十多年來的玻璃深加工,幕設計、施工及不斷的經驗總結和試驗,玻璃幕、隔斷系統要防火、防炸彈沖擊波必須要有耐高溫高強度的框架材料固定支撐玻璃,在一旦發生火災、爆炸的時候要有足夠的時間保證整個系統的完整性,不至於防火玻璃或防炸彈玻璃在短時間內由於固定框架破壞,而玻璃脫落,失去了防火或防炸彈的功能。
  5. Physical model test about vertical and several arc type wave screens which were commonly used was carried out, measuring the wave force and overtopping on the wave screens, analyzing the characteristics of wave force and overtopping of different types of wave screens, and researching the mutual relationship between the wave force and overtopping due to different types of wave screens, to service as a reference for wave screen design of sloping breakwater

    通過對常用的式及幾種圓弧式防浪進行物理模型試驗,測量作用其上的波浪力和越浪量,分析不同防浪形式在受力和越浪上各自的特點,並討論防浪型式引起的越浪和受力的相互關系,可供料坡堤防浪設計參考。
  6. On the process of simulation the deformation after excavation at the middle frusta and the vertical slope at three gorges permanent shiplock, program the fortran procedure to perfect model creation and the capability of the pre - procedure and post - procedure in flac - 3d

    在模擬三峽永久船閘中隔墩和開挖卸荷變形過程中,編制fortran程序,完善flac - 3d建模功能和增強其前後處理能力。
  7. After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well

    開挖完成後,在閘室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立墻頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,閘室底板處的塑性區基本上與損傷區一致。
  8. And the conclusion can be obtained thatrafter excavation, the horizontal deformation increased continuedly with the depth of excavation. while the whole deformation takes on a tendency of nearly horizon and slightly downward. the middle part of the shiplocks maintains the state of unloading feedback during the excavation, when the excavation is finished, it expands toward two sides

    本文研究發現開挖完成後閘室直立墻和南北邊坡的巖體水平方向變形隨著開挖深度的下降而不斷增大,開挖完成後的總體變形表現為近水平略向下。中隔墩在開挖過程中,始終處于卸荷回彈,開挖完成後,中隔墩向兩側張開。
  9. The surrounding rock mass of the tgp shiplocks is jointed rock mass cut by well - developed discontinuous joints. the middle frusta and vertical border wall are the important components of the lock room construction. its deformability and stability will directly affect the construction function and using security

    永久船閘區巖體屬於一種斷續節理切割的裂隙巖體,中隔墩和是閘室結構的重要組成部分,其變形大小和穩定程度將接影響三峽航道的結構功能和運行安全。
  10. On the margins of itu telecom asia, the team discussed trade development objectives and upcoming collaborative activities. the principal objective that he fulfilled in hong kong, however, was to facilitate meetings between taiwan telecom company representatives and canadian delegates where they could discuss business opportunities within asia

    許多成長快速的亞洲都市,為了在這片高樓林的天際中脫穎而出,建築師和設計師一都在尋求更可靠高效能可變換顏色的led照明系統,作為大樓的外照明,以使其作品更加搶眼突出。
  11. From the words of his companions, who saw better than he did, he learnt that it was the dead body of a man, propped up in a standing posture by the fence, with the face smeared with soot

    從看得比他更清楚的同伴的口中知道,那是一具死屍,著靠在上,臉上塗滿煤煙灰。
  12. He took his wet cloak off in the corner and, without greeting any one, went straight up to denisov and began at once asking questions about the matter in hand

    他在角處脫下濕氈斗篷,不和任何人打招呼,徑走到傑尼索夫跟前,刻談起正事來。
  13. The three practice rooms each has a floor area of 12 square metres. the walls have been specially treated for maximum acoustic fidelity. equipped with upright pianos, the rooms are most suitable for instrumental and vocal practices by individuals or small ensembles

    三間練習室各佔地12平方米,壁經過特別處理,音響高度傳真,備有式鋼琴,最適合個人或小組的演奏及聲樂練習。
  14. The space is embedded with sprung flooring and wall - to - wall mirrors and handrails on the three sides of the room. other fixtures include an electric roll - up screen, an upright piano, as well as a fully equipped sound and lighting control room

    舞蹈室面積285平方米,地面鋪上彈性木地板,三邊裝有鏡及扶手,配備電動銀幕及式鋼琴,並附有一間設備完善的音響及燈光控制室。
  15. The music studio with a floor area of 240 square metres, is embedded with sprung flooring, and has wall - to - wall mirrors and handrails installed on two sides of the room. it is also equipped with an upright piano, and a fully equipped sound and lighting control room

    音樂室面積240平方米,地面鋪上彈性木地板,兩邊裝有鏡及扶手和配備式鋼琴,並有一間設備完善的音響及燈光控制室。
  16. It was shown that when the soil pressure on the stepped rsrw was relatively small, its distribution form was zigzag, and would be affected evidently by unloading function of the step ; the potential fracture surface of the stepped rsrw was obviously different from the 0. 3h fracture surface proposed by the usual hypothesis, and would change with height - width ratio of the wall ; finally, its deformation characteristics were different from the vertical rsrw with single step

    測試表明:臺階式加筋土擋後土壓力較小,呈鋸齒形分佈,明顯受臺階卸載的影響;潛在破裂面與0 . 3h破裂面假定有較大差異,並隨擋的高寬比變化而變化;變形特徵不同於單級式擋
  17. Then eliashib, the chief priest, got up with his brothers the priests, and took in hand the building of the sheep doorway ; they made it holy and put its doors in position ; as far as the tower of hammeah they made it holy, even to the tower of hananel

    1那時、大祭司以利亞實、和他的弟兄眾祭司、起來建羊門、分別為聖、安門扇、又築城到哈米亞樓、到哈楠業樓、分別為聖。
  18. Further, it also study their " alkali essence - resistant, water - resistant, temperature variety - resistant etc secondary technique guide lines. so as to satisfy demand of exterior wall coating in chongqing. for beautify city safeguard city, it can contribute to chongqing ' new visualization

    此外,外塗料的耐堿性、耐水性、耐溫變性等其它次要技術指標也做了研究,以滿足重慶外塗料市場的需求,為裝飾、保護建築和美化城市,樹轄市新形象做出貢獻。
分享友人