短隧道 的英文怎麼說

中文拼音 [duǎnsuìdào]
短隧道 英文
short tunnel
  • : Ⅰ形容詞(空間、時間兩端之間的距離小) short; brief Ⅱ動詞(缺少; 欠) lack; owe Ⅲ名詞1 (缺點) we...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. The above system realized the autogeneration of the membership functions and the control rules, greatly lessened the design period of the ventilation control system, and make it possible to on - line modify the control rules

    本文提出的神經模糊控制系統實現了公路縱向全射流通風模糊控制模型隸屬函數和控制規則的自動生成,大大縮了控制系統的設計時間,為通風控制系統的實時在線修改奠定了基礎。
  2. The practice of renewal of monolithic track bed with short sleeper in tunnel

    枕整體床改造工程實踐
  3. Tunnel offers a lot of advantages, such as the shortest physical route, predictability of delivery of goods, and all climate transport route

    興建有許多好處,如縮路程、時間容易掌握、全天候運作等。亦可解決環境污染及土地徵收的問題。
  4. On environmental hygiene, the department launched a new publicity drive in mid 2004, which included television and radio announcements, advertisements at various road tunnel entrances, and at bus shelters and railway stations. banners, posters and pamphlets were also produced

    在環境?生方面,本署亦於二零零四年年中展開新的宣傳活動,包括在電視播放宣傳片和在電臺廣播宣傳聲帶在一些口巴士站及火車站展示廣告懸掛橫額張貼海報,以及派發單張。
  5. He agreed that the government could increase short - term revenues by selling public facilities such as the kcr, toll tunnels or the cyberport

    他同意政府,可透過出售九廣鐵路、收費及數碼港等,期增加收入。
  6. He agreed that the government could increase the revenue in the short term by selling the kcrc, the toll tunnels, and cyberport etc. ( hong kong economic times, 30 november 2002 )

    他同意政府,可透過出售九廣鐵路、收費及數碼港等,期增加收入。 ( 2002年11月30日香港經濟日報)
  7. Application of new short - term forecast technology in exceptional long tunnel construction

    期預報新技術在特長施工中的應用研究
  8. This classification is exceedingly convenient to pre - estimate the medium short tunnel gushing in this area, which provided an effective guide for the design and construction of tianchan 2 grade special purpose highway in gansu province

    涌水類型劃分對該地區中短隧道涌水預測極為方便,為甘肅省天?二級汽車專用公路設計與施工提供了有效指導。
  9. At the meeting held on 16. 4. 99, hc agreed to set up a subcommittee to scrutinize public revenue protection ( revenue ) order 1999 ( the order ). the order was a temporary measure taken under the public revenue protection ordinance to give effect to most of the revenue proposals announced in the budget speech delivered by the financial secretary on 3. 3. 99 when moving the second reading of the appropriation bill 1999. the revenue proposals included increasing the lion rock tunnel ( lrt ) toll from $ 6 to $ 8, and increasing the cross - harbour tunnel ( cht ) tolls for private cars from $ 10 to $ 20 and for motorcycles from $ 4 to $ 8

    於1999年4月16日的會議上,內務委員會同意成立小組委員會,負責審議《公共收入保障(收入)令》 (下稱"該命令" ) 。該命令是根據《公共收入保障條例》而採取的暫措施,以實施財政司司長於1999年3月3日動議二讀《 1999年撥款條例草案》的財政預算案演辭中,所宣布的大部分稅收建議。稅收建議包括將獅子山(下稱"獅" )收費由6元提高至8元;以及將海底(下稱"海" )私家車收費由10元提高至20元,電單車收費則由4元提高至8元。
  10. Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated

    論文重點闡述了通過縮測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法施工充分利用空間,合理配備人力、機械,開挖施工進度得到提高的可行性。
  11. Ng, now a principal investigator and was involved in the investigation then, explained : " some drivers liked to work on routes closer to their residences so that their families could bring them meals during breaks. some wished to drive on routes around upmarket residential areas or commercial districts because of the refined passenger pools. the most sought - after routes were the cross - harbour - tunnel routes

    曾經參與當年調查工作的首席調查主任吳炳國解釋:有些司機希望駕駛的路線鄰近自己的家,上下班方便,家人又可送飯送湯有些則喜歡行走高級住宅或商業區,因為乘客較為斯文有禮不過,最受歡迎是巴士線,因為全部都是新車,行車時間,還有半小時吃飯時間,較諸其他路線的司機只能在停站時才吃一口飯舒服得多而且更可賺超時補水。
  12. The completion of the elevated east kowloon corridor in 1981 and the kai tak tunnel in 1982 provided better access to kwun tong, and the completion in stages of the west kowloon corridor between 1987 and end 1996 shortened journey times between yau ma tei and lai chi kok

    一九八一年建成的東九走廊及一九八二年建成的啟德提供更便捷的路往觀塘。而在一九八七年至一九九六年底分階段完成的西九走廊,也縮了油麻地和荔枝角之間的行車時間。
  13. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平必須按「管超前,嚴注漿,多分部、開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  14. At the same time, the ever - growing population, the resources shortage, and the daunting environmental pollution have made high rises, skyscrapers a trend. more over, concrete structures have become widely demanded in severe environments such as off - - shore petrol platform, cross strait bridge, under sea tunnels, drainage pipes, nuclear waste containers, nuclear reaction shells, poisonous chemical containers etc. all of the above mentioned buildings and structures require the use of cement based materials

    與此同時,在人口增長和資源缺、環境污染的威脅下,建築物越來越向著超高層化、超大跨化方向發展,各種嚴酷環境下使用混凝土結構也越來越多,如:海上石油平臺、跨海大橋、海底、污水管、核廢料容器、核反應堆外殼、盛裝有害化學物的容器等,如此眾多的建築物和結構都主要採用了水泥混凝土材料。
  15. However, since the cwb within the criii is a tunnel, it is important to avoid a sharp curve and to maintain a minimum sight distance for driving safety

    的中環灣仔繞是一條,因此為了安全駕駛起見,除了要避免急彎外,也要維持最的視距。
  16. For short tunnel diffilut to lay wire, it was a kind of effective means to adopt the form of unite arch tunnel. and now unite arch tunnels have been constructed in many highways

    對于那些布線困難的地段,採用聯拱形式,是一種解決工程問題的有效手段,現已在許多高速公路上修建了聯拱
  17. It is clear that the existing short overrun tunnel east of hong kong station was a compromise solution to reclamation phasing problems and is not adequate to meet safety and operational requirements for improved service levels

    -香港站東面現有較的掉頭,明顯地只是為遷就填海分期施工而作出的權宜之計,在服務水平提升后,並不足以應付安全和運作兩方面的要求。
  18. Security policy configuration goals include controlling raw access to data, protecting the integrity of the kernel and the system software, protecting a privileged process from executing malicious code, and confining any damage done by a privileged process flaw

    Openssh也很容易配置,並且由於公鑰私鑰對和密碼語驗證的使用,使它成為極其安全的工作環境。
  19. Unite arch tunnel has its own characteristics which include short tunnel, fleet bury depth and bad surrounding rocks arouses landslide easily in construction

    聯拱有其自身特點,由於,埋深淺、圍巖差,施工中容易引起塌方。
分享友人