石料堆 的英文怎麼說
中文拼音 [dànliàoduī]
石料堆
英文
stockpile-
( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost
( : 3 )依據料場的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆石料功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆石料的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆石料94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。Rock material site selection and quality evaluation for rockfill dam with concrete face slab in songjianghe hydropower station
松江河水電站面板堆石壩石料場選擇和質量評價The inner factors refer to the mechanical behavior such as the rock type, density, construction parameter, etc. and the outer factors refer to the foundation condition, geological condition, valley shape, rise and fall of water level, seepage due to respiration
內因是指堆石料的巖質巖性、密實程度、施工參數等組成壩體的各種力學性質;外因是壩址所處的基礎條件和兩岸的地形地質等條件、河谷形狀、水庫水位的變化、降雨浸潤等因素。Based on the research achievements of forefathers, this thesis combined the engineering practice of the shuicheng reservoir and applied the value engineering to analyze the merit ability and economic performance of the mining of its rock - fill material, and gained the better technological, economical and synthetical beneficial result
論文正是在前人研究的基礎上,結合曲靖市水城水庫主壩工程,應用價值工程對主壩壩體堆石料的開采工藝進行功能和經濟效益分析,取得了較好的技術、經濟及綜合效益。( 2 ) combined with engineering practice of shuicheng reservoir, and use the value engineering technology to analyze the technological and economical benefit of the mining technology of its rock - fill material. this is the first time the value engineering was used in the construction of the medium - sized hydraulic engineering in yunnan province, and has gained great success
( 2 )結合水城水庫工程實踐,用價值工程技術經濟分析方法對水四川大學工程碩十學位論文城水庫大壩的壩體填築堆石料開采工藝進行價值分析,這在雲南省的中型水利工程施工中是有首次,並且取得了巨大成功。( 6 ) under the same conditions of the personnel and machinery and materials, that using value engineering into the mining technology of the rock - fill material gave rise to the direct economic performance of 5, 02 million, but the cost of the value engineering activity being used is only 14 thousand, that is to say the investment of y 1 has gained beneficial result of 359
( 6 )價值工程應用於水城水庫大壩堆石料開采工藝,在不增加人員、機械、材料物資的情況下,產生直接經濟效益502 . 38萬元,用於價值工程活動的費用是1 . 4萬元,取得了1元收益近359元的投資效益。Rockfill materials mining technology by chamber blasting on hard rockmass
堅硬巖體上堆石料硐室爆破開采技術研究The influencing element and the equation of the shear strength of the no viscous moraine and gravel, and strain softening, dilatancy ( shrinkage ) were analyzed
分析了堆石料等無粘性粒狀土的抗剪強度影響因素和合理抗剪強度表達式,應變軟化、剪脹等性質。Through test and research of zipingpu reservoir concrete faced rockfill dam ' s material and finite element analysis of the dam, physics and mechanical characteristics were studied, such as characteristics of rock, compaction, permeability, compressibility and so on, of the no viscous moraine and gravel. at the same time, the mutual relation of physics and mechanical characteristics were studied
對紫坪鋪面板堆石壩築壩料試驗研究,了解堆石料等無粘性粒狀土的巖性、級配、壓實性、滲透性、壓縮性等物理力學性質,以及物理性與力學性之間的相互關系。Our stockyards are located in xiamen xiangyu free trade zone, xiamen dongdu, xiamen haicang, xiamen dianqian, changda and quanzhou chongwu with capacity of 5000 cubic meters to serve as supply a wide range of blocks varieties for all kinds of stone enterprises
公司在廈門象嶼保稅區、殿前、倉達、東渡、海滄及惠安崇武等地擁有大型荒料堆場,儲存有5000立方米的進口荒料,為廣大石材製造企業提供品種多樣、花色齊全的來自世界各地的優質荒料。Surface wave velocity detecting tests and dry density detecting tests by pit replacement method were conducted respectively for the transient material ( a ) and main rock - fill material ( b ) used in the construction of concrete - faced rock - fill dam of shuibuya project
摘要以水布埡面板堆石壩施工中的過渡料( a )和主堆石料( b )為主要檢測對象,分別進行了面波波速和試坑置換法干密度的對比檢測試驗。Based on stress control triaxial compression test and consolidation test, the indeterminacy of test result for rockfill was studied
摘要依據堆石料壓縮試驗和應力式三軸試驗成果,對堆石料力學試驗中的不確定性進行了論述。By virtue of the design features of the mania dam, this paper studies the dynamic characteristics of the dam materials. by comparison with other similar projects, it presents a curve for dynamic characteristics of clay core materials and rockfill materials, makes analysis on the dam ' s plane dynamic response by finite element method, calculates the dam ' s seismic acceleration, the dynamic shear stress of the rockfill, and the dynamic stress of the cutoff wall in the overburden layer
本文針對滿拉土心墻堆石壩的設計特點,進行了築壩材料動力特性試驗研究,通過與相關工程對比給出了心墻料和堆石料的動力特性曲線,採用有限元方法進行了大壩平面動力反應分析,計算了大壩的地震加速度、堆石體動剪應力及覆蓋層防滲墻的動應力。The scheme of natural draining and pre - compression with stacking load has not only treated the dredging region, but also prepared a great deal of rocks for the second - stage construction of dayaowan and saved time for backfill work. and it will be possible that the berth 11 # of the second - stage construction is put into production as soon as possible. the scheme simplifies the unnecessary process of foundation treatment and its direct economic benefit and the social benefit are very remarkable
在隨后進行的大窯灣吹填區兩個場地堆載處理的工程實踐中,借鑒了本次方案研究的成果,採用自然排水堆載預壓方案,既進行了吹填區的處理,也為大窯灣二期準備了大量的開山石料,節省了回填工期,從而使二期11泊位盡早投產成為可能;從經濟效益角度分析,採用此方案簡化了不必要的基礎處理過程,直接效益與社會效益非常顯著。Standard test methods for absorption and bulk specific gravity of dimension stone
規格石料的吸收性和堆積比重的測試According to plentiful of experimentation, some new build techniques are created, for example the technique of no watering fill in winter, the technique of prevent frostbite and crack of faceplate etc. these techniques were proved by the project of lianhua cfrd. at last this paper gives some conclusion
而且根據地區特點,進行了大量的實驗,給出了以往一般面板壩所未遇到過的施工工藝,如冬季堆石體不灑水填築、面板的防凍抗裂、壩體渡汛措施等以及採用新的爆破方法開採石料等新的施工工藝。Research progress in phyto - microbial remediation of petroleum - contaminated soil
石油污染土壤長料堆式異位生物修復技術研究3. parameters of rheology model have been obtained by careful experimental study of the chief materials of the faced rockfill dam in gongboxia water power station
( 3 )結合在建的公伯峽水電站混凝土面板堆石壩工程進行堆石料流變模型試驗研究,得到流變模型參數。Because the rock quarrying and filling are greatly influenced by the climate, the construction method and quality control are the most key link in the construction of rockfill dam
由於堆石料的開采與填築等施工受氣候的影響較大,因此施工方法和質量控制是最關鍵的環節。A large - scale triaxial apparatus is adopted for the tests. the tests are performed under three different confining pressures for each rockfill material, and three different kinds of axial loading is applied under each confining pressures. the rheology of the rockfill materials are presented and analyzed based on the test results, and the creep parameters are obtained
試驗採用大型三軸儀進行,每種堆石料進行了三種圍壓試驗,每種圍壓下又分三種軸向受力狀態,根據流變試驗結果分析了壩料的流變變形特性,得出了流變模型參數。分享友人