石料場 的英文怎麼說

中文拼音 [dànliàochǎng]
石料場 英文
borrow area
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  1. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、規劃與土方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程
  2. ( 3 ) according to the actual geology situation in the material field, use the " alternation " principle of the value engineering analysis methods, and then find a better construction method to satisfy the requirement of rock - fill material, through using chamber blasting to substitute muffling and using an - fo to substitute ammonium nitrate explosive, and then huge economical benefits were gained, for example, the unit cost of its rock - fill material reduced from 11. 77 m3 to 7. 17 / m3, and directly reduced the total cost by 4. 26 million of cost

    ( : 3 )依據的實際地質情況,通過價值工程活動,利用價值分析的「代替」原理,在滿足堆功能不變的條件下,採用洞室爆破代替深孔梯段爆破,採用按油炸藥代替錢梯炸藥,使得堆的開采成本顯著降低,從投標價的h . 70元/ m3降低到7 . 17元/ m3 ,降低了4 . 53元/ mj ,以上壩堆94 . 2萬m 「計,直接降低成本426 . 75萬元,產生了巨大的經濟效益。
  3. Rock material site selection and quality evaluation for rockfill dam with concrete face slab in songjianghe hydropower station

    松江河水電站面板堆石料場選擇和質量評價
  4. This paper conbined with the indoor test and the scene test road, through the synthetical analysis of the factors of influencing densification effect for the densification thickness of filling stone roadbed. the maximum grain size of fill material, densification machinery and densification frequency et al. advanced a control norm of the maximum grain size and piy of compression, established ration evaluating the control standard of densification quality of filling stone roadbed under overload. comparing with result of indoor test and the scene test road, studied on theory of densification in different kinds of stone material and perfected the control system of the densification of filling stone roadbed under overload

    結合室內試驗和現試驗路的實測數據,通過對填路基的壓實厚度,填最大粒徑,壓實機械及壓實遍數等影響壓實效果的因素的綜合分析,提出填路基的最大粒徑和攤鋪厚度的控制指標,建立定量評定超重載交通下填路基壓實質量的控制標準,並對照室內試驗和現試驗結果,研究不同條件下的壓實理論,補充完善了填路基壓實控制指標體系。
  5. Chamber blasting test for small scale sandsyone mining

    石料場開采小型硐室爆破試驗
  6. So sand building stones optimization of playground choose to be studied and have certain universal significance

    因此砂石料場的優化選擇研究具有一定的普遍意義。
  7. The classification of size of crushed product can be set and adjusted according to customers, different requests

    免費為用戶提供砂石料場設計設備安裝調試的一條服務。
  8. This thesis is to analyze the project of ertan hydropower station in order to have an optimizing selection of the place for sand & stone by the means of systems analysis. this thesis will built a system to seek a best scheme about optimizing selection of the place for sand & stone by the means of analyzing and counting the basic data, building different mathematical modeling on base of man - made & machine - made stone, using dug stone and different sources of crude stone and the mixture of several material

    本文以實際工程為例,建立了的優化選擇系統,對原始數據的採用進行分析計算,針對人工砂的利用、天然砂幾種不同的源及幾種源混合使用的情況,分別建立數學模型,進行解算,尋求較優的砂石料場選用方案。
  9. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    石料場的規劃選擇是混凝土壩為主體工程的水利水電工程施工組織設計中的重要環節,選擇受到多種條件的制約,影響因素很多。
  10. China says as many as 12 people are feared dead after being buried by a massive landslide at a quarry in northern china

    中國說,中國北方一個石料場發生劇烈山體滑坡,有十二人被埋,恐怕已經死亡。
  11. 5 - 600t h series of complete set of equipments for rock crushing sand - making sieving, crushing and screening plants china henan heavy industrial factory crushing and screening machines oonsist of coarse jaw crusher, fine jaw crusher, cone cursher, vibrating screen, and belt conveyers, these machines are of advanced structure, good performance, high reliability such as jaw crusher winned chinese national quality prize, and praised by many customers home and abroad

    破碎生產線砂生產線生產線破碎篩分聯合設備-該系列設備廣泛用於石料場礦山冶金建材公路鐵路水利化工等部門,有粗碎鄂式細碎鄂式圓錐式反擊式破碎機和震動喂機震動篩皮帶輸送機等組合而成。
  12. The vibrating screens that our company produce primarily used to screen stones in ore yards, and also can used to screen the materials for the metallurgy, chemical industry and coal. its feature is high efficiency for screening

    振動篩本公司生產的振動篩主要用於篩分,也可用於冶金、化工和煤碳等部門中的物篩分,具有篩分效率高和篩分效果好等特點。
  13. The leading businesses include sculpture of stainless steel, sculpture of glass fibre reinforced plastic, all kinds of figure or animal stone carving, relief sculpture, mural paintings, stonelamp, roman post, railing of bridge, mushroom stone, stone of upstairs, construction of rockery, fountain, level - dividing water project with all kinds of stone materials, and construction of all kinds of ancient architecture such as sideway pavilion, platform, building, pavilion, pavilion on a terrace, corridor, bridge and ancient boat

    公司主要業務:不銹鋼雕塑玻璃鋼雕塑刻各種人物動物浮雕壁畫燈羅馬柱橋欄蘑菇臺階各種的假山噴泉疊水工程的營建,亭臺樓閣榭廓橋舫各類古建築的營造。景區公園廣園林綠化的規劃設計施工。
  14. On construction and demolition waste management, mr lo noted that nearly all the 550 000 cubic metres of tunnel spoil from this contract will be reused in the penny bay reclamation project or processed into aggregates at a local quarry

    至於建築和拆卸廢管理方面,盧耀楨指出南灣隧道挖掘工程所產生的五十五萬立方米物,差不多全部都不會浪費,並會在竹篙灣填海工程項目中循環再用,或在本地加工製成碎,以供建築工程使用。
  15. The scheme of natural draining and pre - compression with stacking load has not only treated the dredging region, but also prepared a great deal of rocks for the second - stage construction of dayaowan and saved time for backfill work. and it will be possible that the berth 11 # of the second - stage construction is put into production as soon as possible. the scheme simplifies the unnecessary process of foundation treatment and its direct economic benefit and the social benefit are very remarkable

    在隨后進行的大窯灣吹填區兩個地堆載處理的工程實踐中,借鑒了本次方案研究的成果,採用自然排水堆載預壓方案,既進行了吹填區的處理,也為大窯灣二期準備了大量的開山,節省了回填工期,從而使二期11泊位盡早投產成為可能;從經濟效益角度分析,採用此方案簡化了不必要的基礎處理過程,直接效益與社會效益非常顯著。
  16. Open storage of goods ( excluding storage of containers ( subject to special condition no. 43 in the second schedule of the tenancy agreement ), cement, sand, aggregates and offensivedangerous goods ) ( in determining whether any goods stored on the premises amount to " non - offensive goods " the decision of the district lands officer shall be final and binding on the tenant ) or a weigh - bridge or a fee - paying public car - park for the parking of motor vehicles ( including container tractors and trailers ) licensed by the commissioner for transport for use on public streets and roads under the road traffic ordinance ( cap. 374 ) or all or any combination thereof

    條規限) 、水泥、沙泥、及厭惡性貨物危險品) (在決定存放在該土地上的任何貨物是否屬于非厭惡性貨物時,地政專員的決定即為最終決定,且對承租人具約束力)或作秤車量重器或收費公眾停車,供停泊獲運輸署署長根據《道路交通條例》 (第374章)發給牌照,可在公共街道及道路上使用的汽車(包括貨櫃車拖頭及拖架)或上述用途的全部或任何組合
  17. In this paper, first discussed are the corresponding results in highway and dam constructions and the engineering characters of rock - fills are deeply analyzed, especially the relationships between gradation, strength and maximum dry density, long - term stability of fillers including earth - fillers and rock - fillers and some conclusions of use are drawn. by in - situ tests and researches on compacting mechanism of high - filled rock embankments, effecting factors on compaction, construction technology and shock compacting technology, obtained in this paper are the compacting technology of high - filled rock embankment and the optimal parameters of rolling compaction. by deeply research on the theory and methods of quality control of high - filled embankment, settled are the questions as quality detection method and control standard of high - filled rock embankment

    本文首先總結和分析了國內外公路和壩工行業已有的相關成果,深入探討了填的工程性質與最大幹密度、長期穩定性等之間的關系,得到了一些有益的結論;通過現試驗路堤的試驗和對高填路堤壓實機理、填路堤壓實效果影響因素、施工工藝和沖擊壓實技術等研究,解決高填路堤壓實工藝和最優碾壓參數控制等技術問題;通過深入研究填路堤壓實質量控制原理和方法,解決高填路堤壓實質量檢測方法和控制標準技術難題;解決高填路堤沉降觀測技術問題,並根據沉降觀測結果研究高填路堤地基和路堤沉降變化規律,得到了能預測沉降變化規律的「龔帕斯」成長曲線預測模型;根據工程實際,深入研究了邊坡穩定性的影響因素,得到了有益的結論。
  18. During the deep - hole blasting for the excavation of guishan quarry for construction of baoquan pumped storage hydropower station, the blasting powder factor and the charging concentration of the blasting powder in the rock are reasonably controlled, and then the rate of blasting chunk is greatly decreased with the reduction of the working amount of the boulder blasting afterwards in conjunction with the suitable excavator and crusher etc

    摘要在寶泉抽水蓄能電站工程龜山開挖的深孔爆破中,合理控制了爆破單位耗藥量和炸藥在巖中的集中度,最大限度地降低了大塊率,並結合使用適宜的開挖及破碎機械等措施,從而減少了二次爆破工作量。
  19. She could have understood the meaning of a little stone - cutter s yard at columbia city, carving little pieces of marble for individual use, but when the yards of some huge stone corporation came into view, filled with spur tracks and flat cars, transpierced by docks from the river and traversed overhead by immense trundling cranes of wood and steel, it lost all significance in her little world

    她能理解哥倫比亞城那個小採的性質,它是把大理切割成小塊出售給私人。但是當她看到巨大的公司的採,看到裏面縱橫交錯的鐵路專線和平板車,穿入的河邊碼頭,和頭頂上方的木製鋼制大吊車,她就莫明其妙了。
  20. Because condition complicated, heavy, usually very much difficult to make the ideal result within shorter time work load have, work for this planning and design and need one science fast choice material planning design method of field badly

    由於條件復雜,工作量大,通常很難在較短的時間內取得理想的結果,為此規劃設計工作亟需一個科學快速的選擇的規劃設計方法。本文運用系統分析的方法對砂石料場的優化選擇進行研究。
分享友人