石板壩 的英文怎麼說

中文拼音 [dànbǎn]
石板壩 英文
slab dam
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 石板 : [建築] slabstone; flagstone; flag; slab; slate; tabula rasa石板斧 sax; 石板鋪砌 slab paving; 石板...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面的導流渡汛標準、導流方式及其選擇、施工期渡汛及體填築分期、圍堰設計以及施工方案及總進度等與混凝土面特點有關的問題進行研究,為工程建設提供一定的參考。
  2. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面上游坡面傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。
  3. Application of concrete extrusion sidewall in face rock - fill dam in shuanghekou

    混凝土擠壓邊墻在雙河口面中的應用
  4. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖力學試驗綜合評價水電站大建基巖體工程質量是可行的,其成果可為大建基巖體驗收提供依據。
  5. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖力學試驗法,對水布埡水電站面建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  6. Cfrd monitoring and its behavior analysis

    混凝土面監測及性態分析
  7. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面基處理和防滲的原則及設計要點.趾基礎和堆體各區砂礫基礎開挖,除趾與其下游1 / 9底寬范圍以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游腳加設了反濾層.為提高基的整體性和防滲性能,對趾進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面的設計和研究提供參考與借鑒
  8. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面填築施工設計
  9. Rock material site selection and quality evaluation for rockfill dam with concrete face slab in songjianghe hydropower station

    松江河水電站面料場選擇和質量評價
  10. Application of distributed optical fiber temperature sensing technology to leakage monitoring for rock - fill dams with face slabs

    分散式光纖溫度傳感技術用於面滲漏監測
  11. The computation results show that the deformation of the dam appears in evident increment and the creep has an obvious influence on the deformation and stress of the face slab

    結果表明,考慮堆流變后的體沉降有明顯的增加,對面的應力變形狀態有較大影響。
  12. Based on the design of hanpingzui rockfill dam with concrete facing slab, the stresses and deformations of the dam body and impervious system are calculated by using the elastoplastic plane finite element method

    摘要根據漢坪咀混凝土面的工程設計,用彈塑性平面有限元法,計算了堆體、防滲體系的應力和變形。
  13. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面、分期蓄水的水布埡高面,選用合適的流變模型正確模擬堆體的變形特性,以便採用合適的施工程序減小面應力變形具有重要意義。
  14. With the calculation model, the seepage simulation calculation fem of slab joints and face slab with dense cracks becomes possible, and thus an effective way for seepage analysis with fem of cfrd under the extreme condition of slabs to be destroyed is provided

    藉助于這些模型,使得面接縫及密集裂縫型面滲流的有限元模擬計算成為可能,從而為在面發生極端破壞情況下面的有限元滲流分析提供了有效的途徑。
  15. In this paper, the study of construction technology of concrete facing rock - fill dam in frigid zone has been done in accordance with construction and practice of lianhua hydropower station ( concrete face rock - fill dam ) in mudanjiang, heilongjiang province

    本文針對嚴寒地區砼面施工技術研究方面的不足,結合我國黑龍江省牡丹江上的蓮花水電站,面的施工實踐,通過施工的原型實驗,對砼面在嚴寒條件下的施工技術進行了研究和總結。
  16. The relation between rheological breaking ratio and plastic work is set up according to the equation relation between outer plastic work and energy of plastic deformation. it is helpful to the understanding of elasto - plastic constitutive relationship of rockfill and braking of particles. based on analysis of test result, in - site observation data, this paper put forward a quantitative relation between rheology and valley shape, rockfill mechanical parameters, such as dry density, compressive modulus, softening factor, pore ratio, etc. the main factors influencing the rheological behavior of rockfill can be classified into inner factors and outer factors

    作為面的主體,影響其流變的因素頗多且十分復雜,既有內因也有外因,根據試驗、原型觀測資料對內外因素所做的分析,本文提出了流變與河谷形狀等外因、流變與體常規物理力學指標等內因的定量關系和影響堆流變的多因素綜合表達式,由此建立了堆流變與堆常規物理力學指標(如干密度、壓縮模量、軟化系數、孔隙比等等)之間的聯系。
  17. According to plentiful of experimentation, some new build techniques are created, for example the technique of no watering fill in winter, the technique of prevent frostbite and crack of faceplate etc. these techniques were proved by the project of lianhua cfrd. at last this paper gives some conclusion

    而且根據地區特點,進行了大量的實驗,給出了以往一般面所未遇到過的施工工藝,如冬季堆體不灑水填築、面的防凍抗裂、體渡汛措施等以及採用新的爆破方法開採料等新的施工工藝。
  18. ( 6 ) based on the parameters achieved in the rockfill creep experiments, the deformation characteristics of dam body of gongboxia cfrd are studied through a contrast between considering rockfill creep deformation factors and not considering them. the rationality of the present creep model and the reliability of its creep parameters are verified. and an important reference to the design and construction of new building cfrd is offered

    ( 6 )根據堆料流變試驗所得的流變模型參數,對新建的公伯峽水電站混凝土面進行了計入和不計入流變因素的體變形特性分析計算,研究了堆體流變對面應力變形特性的影響,為新建的設計和施工提供了重要的參考依據。
  19. Based on the productive experiment on heihe dam site, during april to august 2002, site experiment was made on gongboxia hpp dam site, bjy - 40 extrusion curb placing machine was determined to be applied into gongboxia project, the batch ratio is : cement 80kg / m3, sand 651kg / m3, small stone 1449kg / m3, and sand ratio 31 %, w / c ratio 1. 31, admixture 3 %

    在生產性試驗的基礎上, 2002年4 8月,在公伯峽面現場進行了擠壓邊墻施工各個環節的試驗,通過試驗,確定公伯峽面使用陜工局西安理工大學工程項士學位論文水利機械廠研製的bjy 40型混凝土邊墻擠壓機進行固坡施工,其混凝土配合比為:水泥80kgb 』 ,砂651kgb3 ,小1449kgb 』 ,砂率31 ,水灰比1
  20. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面的實際施工進度、蓄水過程,對比有無擠壓邊墻兩種方案,進行三維模擬計算。結果表明,面與堆體之間有擠壓邊墻時,其面的變形及應力值均小於無擠壓邊墻的相應結果。
分享友人