石灰華的 的英文怎麼說

中文拼音 [dànhuīhuāde]
石灰華的 英文
tufaceous
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ名詞1 (物質燃燒后剩下的粉末狀的東西) ash 2 (塵土; 某些粉末狀的東西) dust 3 (特指石灰) lime...
  • : 華名詞1. (華山, 在陜西) huashan mountain (in shaanxi province)2. (姓氏) a surname
  • : 4次方是 The fourth power of 2 is direction
  • 石灰 : lime; kalk; chunam石灰焙燒 lime roasting; 石灰玻璃 soda lime glass; 石灰採石場 lime pit; 石灰漿[...
  1. Standard specification for travertine dimension stone

    規格標準規范
  2. The colosseum was constructed with tens of thousands of tons of a type of marble called travertine and held together with 300 tons of iron

    羅馬競技場是由數萬噸名為「大理加上300噸鋼鐵鑄建而成。
  3. Discussion on engineering characteristics of tufa in kaili perfecture

    凱里地區石灰華的工程特性探討
  4. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥流引起堆積物和冰川作用形成冰磧物堵塞河道,再加上構造運動造成地殼不均勻抬升,九寨溝這種獨特地質環境以及高含ca ( hco _ 3 ) _ 2巖溶水流作用下,為caco _ 3沉積創造條件,沉積caco _ 3加高、連接最終形成堤壩,使湖泊形成成為可能。
  5. To solve the frequent ash and slag stacking in the ash - pit under the 600 mw supercritical boiler for huaneng shanghai shidongkou no. 2 power plant, the high resolution acoustics imaging real - time monitoring system was developed using underwater acoustics imaging technology

    摘要結合能上海洞口二電廠600mw超臨界鍋爐爐底坑頻繁堆渣排放實際情況,利用水下聲納成像技術,開發了高解析度聲納成像實時監視系統。
  6. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆壩原位觀測和反潰分析研究」及「高土壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠壩加固工程勘測試驗與計算分析」咨詢成果已被東電力設計院設計采納,工程效益顯著; 「甕福磷膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  7. The problem of acid rain is still severity, in the fossil power plant, the flue gas desulfurization is the main approach on controlling the let of so2. the paper mostly introduce the dcs rebuilding project of the desulfurization system in. the equipment is first introduced into our country from mitsubishi corporation, which is the wet limestone - gypsum flue gas desulfurization equipment

    火電廠煙氣脫硫是控制so _ 2排放主要途徑。本文主要介紹能珞璜電廠脫硫系統dcs改造工程。該裝置是國內首家引進日本三菱重工公司濕式膏法煙氣脫硫裝置。
  8. Through real example of desulfuration project in guohua dingzhou power plant, the problems, such as slurry - freezing and blocking in the pipe conduit and other equipments, occurred in trial operation of limestone - gypsum wet type flue gas desulfuration equipment have been presented

    摘要通過國定洲電廠脫硫工程實例,介紹了膏濕法脫硫裝置在冬季試運期間遇到管道、設備內漿液凍結及堵塞問題。
  9. When you have crossed the jordan into the land the lord your god is giving you, set up some large stones and coat them with plaster

    將來你們過約旦河,到了耶和神賜給你土地那一天,你要立起幾塊大頭,墁上
  10. [ niv ] when you have crossed the jordan into the land the lord your god is giving you, set up some large stones and coat them with plaster

    將來你們過約旦河,到了耶和神賜給你土地那一天,你要立起幾塊大頭,墁上
  11. The waters flowing over the limestone and chalk have, over thousands of years, deposited travertine barriers, creating natural dams which in turn have created a series of beautiful lakes, caves and waterfalls

    數千年來流經和白堊上水,逐漸沉積為屏障,構成自然堤壩,後者又創造了一系列美麗湖泊、洞穴和瀑布。
分享友人