砂帶加工 的英文怎麼說

中文拼音 [shādàijiāgōng]
砂帶加工 英文
coated abrasive machining
  • : 名詞(沙子) sand; grit
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. This is good stiff abrasive cloth suitde for manufacturing into different belts. ma inly used for sanding the products such as black metals, nonmetals materials, wood and man - made board

    重型,具有適當的強度和韌性,適合成各種。主要用於:黑色金屬、硬質非金屬、木材、人造板等。
  2. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支護程越來越多,綜合青島市區的地質狀況,除海邊有性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂和穩定性極差的煌斑巖穿插其中,基坑施時需要爆破施,對邊坡的穩定造成了不利影響,之連續出現的幾次滑坡失穩事件,基坑支護程越來越引起了各方面的重視。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本程特點在下游壩腳設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. Abstract : belt grinding is a kind of advanced machining technology

    文摘:磨削是六十年代發展起來的先進機械方法之一。
  5. Production in optical engineering - diamond impregnated cup wheels - part 1 : with steep cone

    光學.鑲金剛石的碗形輪.第1部分:圓錐體
  6. . manufacturing processes chip removal - part 12 : belt grinding sanding ; classification, subdivision, terms and definitions

    排屑藝.第12部分:磨削
  7. The research on the application of belt grinding in hard stone precision machining is summarized in this paper

    本文對磨削技術在硬質石材中的應用研究進行綜述。
  8. Production in optical engineering - machine tool spindles - part 1 : machine tool spindles with steep taper

    光學.輪軸.第1部分:錐度的輪軸
  9. Sand - removing and deoxidization of small - sized castings, forgings, heat - freated pieces, aluminum - copper alloy castings, steel plates, steel pipes, sections and steel str uctures, suface intensification of springs and chains, cutting of rocks, gfiding processing

    7小型鑄件、鍛件,熱處理件、鋁銅合金鑄件,鋼板鋼、鋼管等清去除氧化皮,彈簧鏈條的表面強化及研磨石材切割。
  10. Sand - removing and deoxidization of small - sized castings, forgings, heat - treated pieces, aluminum - copper alloy alloy castings, steel plates, steel pipes, sections and steel structures, suface intensification of springs and chains, cutting of rocks, griding processing

    小型鑄件、鍛件、熱處理件、鋁銅合金鑄件、鋼板鋼、鋼管等清去除氧化皮,彈簧鏈條的表面強化及研磨石材切割。
  11. For protection of blast cleaned steel during storage, fabrication and construction periods, including areas which will be submerged in service, with ( or without ) impressed current catholic protection

    作為在儲存、和建造期間經噴除銹的鋼板的保護塗層。也可塗于電流陰極保護裝置和不電流陰極保護裝置的船體水下部位。
  12. Through studying cfrp material, the cfrp strip was proposed and its mechanics parameters were measured ; the physical parameters of clay and sand were measured through geotechnique test. 2 ) researching test piece performance. by triaxial test, the soil test piece reinforced by cfrp was studied

    通過對cfrp材料的深入研究,研製出了可以用於筋材料的cfrp筋,並測量了這種筋材料的力學指標;通過土試驗,測試了試驗中所用的、粘土的物理性質參數。
  13. Production in optical engineering - diamond impregnated cup wheels - part 2 : with mounting cylinder

    光學.鑲金剛石的杯形輪.第2部分:安裝缸
  14. The comprehensive properties analysis of moulding sand was showed with practical examples, and some effective measures to intensify sand properties control was proposed in order to prevent works from economic loss caused by severe fluctuation of sand properties

    提出了強型性能控制的有效辦法,避免因型性能波動過大給廠生產經營來巨大損失。
分享友人