砂漿底層 的英文怎麼說

中文拼音 [shājiāngdecéng]
砂漿底層 英文
screed
  • : 名詞(沙子) sand; grit
  • 漿 : 漿同「糨」
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區礫石基礎開挖,除趾板與其下游1 / 9寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. For accumulating heat from piping and making as even the temperatures in various spaces betwiin pipes an possible, gravel foundation is first laid, mortar is mixed fully by mixing ratio of 1 : 2, the floor is finished level and then perfect curig in damp condition is carried out

    為保證管路間蓄熱和溫度均勻應鋪下后進行配比為1 : 2的灰漿完成處理,不僅要保證地板水平,還要在濕潤狀態下自然乾燥,使得到徹的養護,人為的養護會導致地板雛裂,應予以注意。
  3. The foundation mortar layer for bearing support is used as supporting foundation when laying the piping system and the mixing ratio of cement and sand should be about 1 : 3. be sure to level it well and give perfect curing

    起支持作用的基礎灰漿在鋪高熱炕供暖管時起支撐作用,灰漿的混和比為水泥:1 : 3 ,施工時要可能保持水平,需要徹養護。
  4. Cement and sand screed

    水泥砂漿底層
分享友人