  1. The results show that the damages to the appearance of concrete structures exposed to atmosphere, including honeycombing, cracking along rebar, rebar corrosion, and concrete delamination, are quite serious, that the poor quality of concrete construction, the insufficient thickness of local concrete cover, and the rebar corrosion expansion and dilatancy induced by carbonization of concrete cover are the main causes, and that the main form of damages to the overflow structure is the abrasion resulted from water scouring

    結果表明,水的水上(大氣中)混凝土結構外觀破損十分明顯,露石露、順筋裂縫、鋼筋銹蝕、混凝土破損剝落等已十分嚴重;引起破壞的主要原因是混凝土施工質量較差,局部保護層厚度不足,混凝土保護層碳化引起鋼筋銹蝕脹裂,而水流沖刷磨蝕是水過流結構破壞的主要形式。
  2. Application of polymer silicon powder mortar in reinforcing the floodgate project of longfengshan reservoir

    聚合物硅粉漿在龍鳳山水庫泄洪工程加固中的應用
  3. By analyzing and calculating the structure and stress distribution status of foundation under time of completion, operating period and earthquake condition, the initial determination on the kinetic strength and liquefied possibility of underlying sand layer beneath the dam foundation are obtained

    分析一計算結構及地基在竣工期、運行期和地震作用下變形和應力分佈狀況,並初步判斷壩基礎卜伏層的動弧度及液化的可能性。
  4. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  5. The foundation of gated - weir of the wanbahe power station is located on quaternary deposit which is soft

    摘要灣壩河水電站基坐落在第四紀礫石覆蓋層上,屬于軟基上建
  6. This paper introduces the general situation of the construction of the new sluice of dongtai river, yancheng city, and probes into the construction organization and the application of the sand - dredger - fill technology with woven bag in the construction operation

    簡要介紹了鹽城市東臺河新工程概況,重點探討了施工組織及施工作業中有關編織袋吹工藝的應用問題。