砌圍墻 的英文怎麼說

中文拼音 [wéi]
砌圍墻 英文
build an enclosing wall
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. In spite of the un - russian character of the country and the environment the fruit gardens, the stone walls, the tiled roofs, the mountains in the distance, the foreign peasants, who looked with curiosity at the russian soldiers, the regiment looked exactly as every russian regiment always looks when it is getting ready for inspection anywhere in the heart of russia

    盡管地形和周環境果園石瓦房蓋遠處望得見的山巒與俄羅斯迥然不同,盡管非俄羅斯民眾懷著好奇心觀望著士兵,但是,這個兵團的外貌,卻和俄羅斯中部任何地區任何一個準備接受檢閱的俄國兵一模一樣。
  2. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力錨索抗滑樁可與石擋、噴錨支護、預制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式的組合結構,從而可擴大這種結構型式的應用范
  3. According to each ingredients ( water retaining admixture, polymer, inorganic mineral ) " effect to mortar ' s behaviors ( water relentivity, strength, contractility ) in exclusive mortar " s composite addition, the text defines each ingredient ' s quantity scope, then define the mix through cross experiment. we compared the aac exclusive mortar ' s behaviors such as water relentivity, compressive strength, binding strength, shrinkage, flexural strength and others to ordinary mortar ' s ones, it turn out to be that there is much improve in former ' s behaviors such as water relentivity, compressive strength, binding strength, shrinkage, flexural strength etc, it also shows that the aac exclusive mortar can improve the crack in aac brick walling to a certain degree

    並根據專用砂漿中復合外加劑的各個組分(保水劑、聚合物、無機礦物等)對砂漿主要性能(保水性、強度、收縮性、抗彎性等)的影響來確定每個組分的摻量范,再通過正交實驗確定最佳配合比,然後就普通砂漿與專用砂漿的保水性、抗壓強度和粘結強度、收縮值、抗彎曲性能以及其它性能進行了對比,對比結果表明專用砂漿的保水性、抗壓強度和粘結強度、收縮值、抗彎曲性能以及其它性能較普通砂漿都有了很大的提高,說明加氣混凝土塊專用砂漿在一定程度上可以改善加氣混凝土體的開裂情況。
  4. In the project of jingyuan garden, a national model project for comfortable residence constructed by us, new technologies including dipy framework system, composite external wall, etc are adopted, especially aerated concrete block enclosure structure is adopted for large areas, which has a great demonstration significance in replacing clay brick and with regard to wall restructuring

    在我們承建的國家康居示範工程景元花園項目中,採用了帝枇模網結構體系,復合式外等新技術,特別是大面積採用加氣混凝土護結構,在替代粘土磚和體改革方面具有極大的示範意義。
  5. In 1817, tung chung fort was built to thwart the opium trade and defend the coast from pirates. there are 6 old cannons and the enclosures are made of granite

    東涌炮臺建於1817年,是用以堵截鴉片貿易和海盜侵略的城堡,現仍遺留六枚古炮,由修整過的花巖崗成。
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  8. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析的結果比非線性屈曲分析的結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只有初期支護時,隨著地應力的增加,巖的荷載分擔率增大,相應地,初期支護的荷載分擔率就減小了;當有初期支護和二次襯共同作用時,巖的荷載分擔率在50以上,這一分擔率隨地應力的增加其變化不大;支護和巖體的整體分析表明,襯底拱及拱腳處應力集中嚴重,隧道巖體側巖的應力集中也較大。
  9. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山隧道淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工順序對巖及支護結構穩定性的影響,重點對連拱隧道整體襯中的薄弱環節中進行了分析。
  10. Constructed with solid blue bricks on granite foundations, the walls stand 10 feet high and served to protect the wong clan from bandits during the early years of their settlement there

    客家屋以花崗石為基,上以堅硬的青磚成護,高達十尺,用於防禦盜賊。
  11. A program with c + + language was designed to calculate ultimate load of the reinforced concrete masonry shear wall structure. the reliability of the program was proved by comparing the program results with experimental results. ( 2 ) using the program, impact to the shear resistant of the ratio of grout for concrete and the ratio of height to section thickness and the horizontal reinforcement ratio was discussed

    ( 2 )利用本文編制的程序,討論不同的高寬比、灌芯率和水平配筋率對配筋體剪力抗剪承載力的影響,並驗證了《體規范》 ( gb50003 - 2001 )規定允許高寬比和允許配筋率范
分享友人