砌墻石 的英文怎麼說

中文拼音 [dàn]
砌墻石 英文
bonding header
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  1. The gabled brick, tile, and freestone houses had almost dried off for the season their integument of lichen, the streams in the meadows were low, and in the sloping high street, from the west gateway to the medieval cross, and from the medieval cross to the bridge, that leisurely dusting and sweeping was in progress which usually ushers in an old - fashioned market - day

    那些帶有用磚的山和蓋有屋瓦的頭房子,外面的一層苔蘚已經因為乾燥的季節差不多曬干脫落了草場上溝渠里的水變淺了,在那條斜坡大街上,從西大門到中古十字路,從中古十字路到大橋,有人正在不慌不忙地清掃大街,通常這都是為了迎接舊式的集市日子。
  2. The third mosque is the hk 26 - million kowloon mosque and islamic centre and its located at 105 nathan road in tsim sha tsui, kowloon. this three - storey building, with a handsome dome and four minarets, is highlighted by marble grille work and decorative arches

    樓高三層的建築物,設有堂皇的圓頂及四個尖塔,由大理而成的壁及雕花拱門,充滿莊嚴的不凡氣派,可容納會眾約2 , 000人。
  3. Rectangular in shape, the fort measures 46m by 21m and its walls are built of semi - dressed stone and green bricks

    炮臺長約四十六米,闊二十一米,身以花崗及青磚疊而成。
  4. This paper puts forward a method of fast, handy, no - destructive and effective testing which can be used to test the strength and geometrical dimension of subgrade abamurus using the method of earthquake wave velocity and gpr ( ground penetrating radar ). this method can be used to definite the dimension and strength of abamurus by determining some physical parameters ( such as elastic wave velocity and electromagnetic wave velocity etc, ) and by the correlation of these physical parameters with mortar flag stones

    本論文提出使用地震波速法和地質雷達法檢測路基擋的強度和幾何尺寸,是一種快速、簡便、無損、有效的檢測方法。此方法通過測定某些適當的物理量(如:彈性波速度、電磁波速度等) ,並通過這些物理量與漿的相關性,確定體的尺寸、強度等性能。
  5. Paving granite block facing of rw003 near lung tseng tau

    鋪設鄰近於井頭擋土編號003的花崗
  6. The building has a majestic appearance with imposing pillars of the facade and other features in the greek - revival style. the massive retaining walls were constructed with granite blocks

    整座建築物十分雄偉,正面採用希臘古典式建築,建有宏偉的柱,護土則以花崗巖築而成。
  7. It is a three - hall building and the second hall is the place for worshipping the clan s ancestors. its wall and door are decorated with rare rocks, and the crossbeams and brackets are finely carved

    祖祠門用珍貴的紅粉而成,橫梁和斗拱飾以精緻雕刻,還有灣制的瓷鰲和獅子裝飾,甚富傳統色彩。
  8. There are elegantly built white kiosks, curved bridges and ponds inside the park, and the rear wall of the park is made with stone piling

    園內建有造型優美的白色涼亭曲橋和池塘,公園后並以巨而成。
  9. In spite of the un - russian character of the country and the environment the fruit gardens, the stone walls, the tiled roofs, the mountains in the distance, the foreign peasants, who looked with curiosity at the russian soldiers, the regiment looked exactly as every russian regiment always looks when it is getting ready for inspection anywhere in the heart of russia

    盡管地形和周圍環境果園的圍瓦房蓋遠處望得見的山巒與俄羅斯迥然不同,盡管非俄羅斯民眾懷著好奇心觀望著士兵,但是,這個兵團的外貌,卻和俄羅斯中部任何地區任何一個準備接受檢閱的俄國兵一模一樣。
  10. This paper expounds the research on pumice and its concrete, and the testing result indicates the pumice after being properly machined can be used to make lwac and hollow block

    試驗研究結果表明,張家口地區所開採的浮經過適當破碎加工、優化分選和顆粒搭配后可配製性能優良的輕骨料混凝土,並可用於製作性能可靠的建築體用輕混凝土空心塊。
  11. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力錨索抗滑樁可與、噴錨支護、預制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式的組合結構,從而可擴大這種結構型式的應用范圍。
  12. Retaining wall is a construction form of the widespread adoption in engineering field, although appeared the new form of the wall in recent years with the new way of doing, the gravity wall built with stone is still the main form, and therefore the study on optimization design of the gravity wall built with stone has very important meaning

    擋土是工程界普遍採用的結構形式,雖然近年來出現了不少擋土的新形式和新做法,但重力式擋土仍然是工程中擋土的主要形式,因此對重力式擋土進行優化設計研究具有十分重要的意義。
  13. We provide facade consulting services for all types of exterior wall systems, including ; custom curtain wall, glass wall, skylights, exterior stonework, masonry and precast concrete

    我們提供所有形式的外面體系統的咨詢服務,包括設計幕,玻璃,天窗,頭和塊外,以及預制混凝土板外
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰基礎處理與施工技術;大江截流上下游土圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯的結構與支護研究;特大型水輪發電機組的科學研究。
  16. Next was an experimental study on modification of stone ballast concrete small hollow block. the influence of polypropylene fiber, expansion agent and both of them on permeability - resistance and both moisture expansion and dry shrinkage of the block were systematically tested. the testing results and theoretical analysis slowed that they all can improve its properties, among which polypropylene fiber can most effectively restrain it ’ s moisture expansion and drying shrinkage ; however, the block doubly blended with polypropylene fiber and expansion agent will be likely to most beneficially improve crack - resistance of wall filled with the block

    試驗結果和理論分析表明,單摻聚丙烯纖維、單摻膨脹劑和雙摻聚丙烯纖維與膨脹劑均能改善混凝土空心塊的性能,其中,聚丙烯纖維更有利於限制單個塊的濕漲干縮,單摻聚丙烯纖維的空心塊濕脹干縮的波動性最小;雙摻聚丙烯纖維與膨脹劑對限制塊濕脹干縮的效果不理想,但雙摻塊將更有利增強于塊填充的整體抗裂性。
  17. It had been covered by a chunam surface and a masonry toe wall many years ago for stability purposes see photos

    該段斜坡早於多年前已被鋪上灰泥表層及以作鞏固(見下圖) 。
  18. After all, there came an experimental study on modification of wall filled with stone ballast block

    最後進行塊填充(模擬)的改性試驗研究。
  19. Spot investigating results revealed, subjective factors causing crack in wall filled with stone ballast block can be eliminated by intensifying instruction, strengthening management and strict overseeing

    現場調研顯示,引起塊填充裂縫的主觀因素,可以通過加強指導,強化管理,嚴格監督予以消除。
  20. Adjacent to the tait co., it was one the warehouse of tait co. in the beginning. considering the bricks were gotten from anping fort for the construction of this house, it might be built between the end of 19 century and the beginning of japanese colonization. to be a warehouse of japanese salt company

    隔壁,最初為洋行倉庫,從古磚推取自熱蘭遮城紅磚,及門楣花崗、窗框基與木屋架構判定,推測最早應建於十九世紀末及日治初期,作為大日本鹽業株式會社出張所倉庫,現況規模即為日本人增建。
分享友人