破壞性分析 的英文怎麼說

中文拼音 [huàixìngfēn]
破壞性分析 英文
destructive analysis
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1. (分開; 散開) divide; separate 2. (分析) analyse; dissect; resolve Ⅱ名詞(姓氏) a surname
  • 破壞性 : destructiveness; destructive effect破壞性風暴 [氣象學] blowdown; 破壞性故障 destructive malfuncti...
  • 破壞 : 1 (使建築物等損壞) destroy; wreck; ruin 2 (使事物受到損害) do great damage to; do harm to; da...
  1. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠論證了1998長江流域特大洪水災害中九江市防護大堤發生的嚴重潰口的滲流機理。、比較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的洪水條件下九江大堤潰口斷面的抗滲可靠僅在55左右的非常低水平。
  2. Nowadays, the ways to detect the piles are various, and all of them are limited in some aspects. for instance, coring test do large scathe on the piles, and static load test will waste much time, money and energy, while some ways are hard to operate as the limitation of the length and the diameter of the piles, and the special condition on the spots, such as high - strain, low - strain, and so on. furthermore, the result can only be gained under the complex analysis of the collected wave, and under the validation of the coring test

    目前,工程中常用的樁基檢測方法很多,但都存在著一些弊端:有的對樁嚴重,例如抽芯檢測;有的耗時、耗財、耗力,例如靜載荷試驗;還有的如低應變、高應變等檢測技術由於受到樁長、樁徑以及現場一些特殊情況的限制,操作很不方便,而且採集到的波形要經過比較復雜的處理方能得出結論,而這個結論卻還要輔助取芯手段加以驗證。
  3. Numerical method of shakedown analysis based on kinematical - type theorem for incremental collapse and its applications

    增量型機動安定方法及其應用
  4. Some beneficial results of the csnw ' s behaviors are gotten. main research contents as follows : ( 1 ) the four destruction models and respective stability analysis methods are discribed in this paper, whose working mechnism and calculating methods are given. in addition, some defects of every method are also discussed ; ( 2 ) on the basis of traditional active soil pressure method and expirical siol pressure method, the calculating model of the laternal earth pressure which is a tetragon with the largest value in the center side is addressed

    主要工作如下: ( 1 )本文給出了復合土釘墻的穩定方法,該方法介紹了復合土釘墻的四種類型,了每種類型的受力機理,並給出了相應的計算方法和計算方法中的一些不足; ( 2 )在傳統的主動土壓力和經驗土壓力的基礎上,建立了土釘墻中間大、上下小的四邊形狀佈的側向土壓力的計算模式。
  5. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、模式、變形能力、承載能力和角鋼錨固的可靠了頂層邊節點在張開彎矩作用下的工作能、模式和抗剪承載力;了試驗節點的滯回能和耗能能力。
  6. According to composition and structure feature of jinjiang landslide analysis, the author considers it was a enormous landslide with the characters about multi - period ( total four slides ) and overlaying, its mechanism of deformation failure attributed to a representative sliding - bending mode in the consequent slope, the stability calculation indicates that no matter what the whole landslide would not slide, while, as earthquake intensity reaching or exceeding vi, the first - period landslide which lies to the south of huangjiagou in the front slip mass and the fourth - period landslide which lies to the north of caojialiangzi in the back slip mass will slide

    由金江滑坡的組成及結構特徵可知,邊坡為一多期次(四次滑動)兼具超覆特徵的巨型滑坡,其變形機制屬順層邊坡中比較典型的滑移?彎曲型。穩定計算表明,滑坡整體穩定較好,僅在遭遇度及其以上地震作用的情況下,堆積體前部靠黃家溝以南的第一期滑坡及靠後部北側曹家梁子的第四期滑坡堆積體才會失穩;因素敏感表明,滑坡穩定對地震(尤以強震)最為敏感。
  7. Interface debond between propellant and liner is a key form of failure of the structure integrity in the analysis of solid rocket motor

    在固體火箭發動機結構完整中,襯層/推進劑藥柱粘接界面的脫粘是完整的關鍵形式之一。
  8. The fieldworks and the test results show that there appears three failure models on the natural slope, that is, rotational slide, translational slide and earth flows. triaxal tests, including the isotropical consolidation drained and undrained compression and anistropically drained tests, are performed on loosely compacted specimens. the critical state line ( csl ) is obtained in the e - lgp " plot based on the results of the above tests

    在野外調查的基礎上,結合試驗成果,初步得出自然斜坡的模式,包括旋轉型滑動、平移型滑動及土流等;並對暴雨滑坡轉化成泥石流的影響因素和碎屑物質的運動距離作了定;初步了滑坡轉化成泥石流的流態化機理。
  9. As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil

    歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、結合本人的設計專利? 「鋼筋混凝土網格式加筋擋墻」及工程實踐,在對加筋土的加筋機理、模式、承載力和穩定等方面進行深入的基礎上,提出了一個新概念,即經過加筋后的土體作為復合結構與原土體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出拉力和粘著兩種情形下的承載力公式,然後進行了穩定
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠:被成都勘測設計研究院應用於比選報告及可行論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌提供軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定及溫控方案提供依據。
  11. 4. the seismic dynamic reliabilities of the nanjing changjiang tunnel were analyzed, and its dynamic reliable and disable probabilities under the 7 degree earthquake were obtained, by using the maximum stochastic responses and the first overstress mechanism. in the other hand, the probability of serious seismic intensity and its probability distribution function were calculated by analyzing the seismic degree, and the seismic dynamic reliable and disable probabilities of the tunnel in its design reference period were calculated by using the maximum stochastic responses and the first overstress mechanism

    4採用最大隨機地震響應和首超理論了隧道抗震動力可靠度,得到了隧道在七度地震作用下的地震動力可靠概率和失效概率;並通過對南京長江隧址的地震危險,得到了各烈度地震的發生概率及其概率佈函數,在此基礎上,別採用最大響應和首超理論計算了隧道在設計基準期內的安全概率和失效概率。
  12. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱壩整體穩定,在這方面做了一些初步研究。現行規范將壩體混凝土強度校核和壩肩穩定安全度評價開進行,沒有考慮兩者的關聯,然而這兩類常常是相互聯系,伴隨發生的。
  13. Attacks are rare and understanding the shark ' s motive can be difficult

    為此,科學家努力研究虎鯊和大白鯊的習?們的力。
  14. Stereographic technique is used in the analysis of the footwall slope in the open - pit of bangmoshan iron mine. the slope fracture mode and the slipping direction of unstable blocks are given and the stable slope angle is calculated to be 46

    運用赤平極射投影的方法,對棒磨山鐵礦露天采場下盤邊坡進行了穩定,給出了邊坡模式和不穩定塊體的滑動方向,並推算穩定邊坡角為46 。
  15. The main contents are as follows. by the experiments of two joints under low - reversed cyclic loading, the paper analyzes the failure pattern, energy dissipation, ductility and cracking in the joint cores, evaluates the seismic performances and anti - crack behaviors of the joints, and deduces the anti - crack formula of the subassemblage and prestressed frame joint. through the fini te element analysis software ansys, the paper analyzes the specimens nonlinearly, and the theoretical analysis results are well consistent with those of the experiment

    主要內容包括:通過兩榀節點在低周反復荷載作用下的試驗,形態、耗能能力、延能和節點核芯區裂縫開展情況,評估節點的抗震能和抗裂能力,推導出預壓裝配式框架節點的抗裂驗算公式;並運用ansys對試驗中的節點進行了非線,計算結果與試驗結果基本吻合。
  16. Based on thermodynamics laws, inner - variable theory and analysis of conventional tn - axial tests data and breakage characteristics of loess, this paper proposed that the loess would produce elastic, plastic and nonreversible damage deformation during loading

    從熱力學定律和內變量理論出發,在對常規三軸試驗數據和土樣的的基礎上,認為土體在受力過程中將產生彈變形、塑變形和不可逆損傷變形。
  17. Secondly, the finite - element analysis on the typical slope section is performed with establishment of geology model, definition of boundary condition and proper selection of mechanical parameters. the result shows that the slope is of integral stability, and the failure mode mainly comprises infrequent block drop and wedge body breakage. considering the two failure modes of plane failure and wedge body breakage, and stability calculation under different work conditions, the slope stability is discussed and the sensibility ana lysis on its fraction angel and cohesion force is made

    然後通過建立地質模型、確定邊界條件、選擇合理的力學參數,取典型斷面對邊坡進行數值結果表明斜坡整體是穩定的,類型以零星掉塊和楔體失穩下滑為主;為了定量計算邊坡的穩定,對邊坡兩種類型:單滑面下滑和雙滑面楔形體下滑,考慮不同工況進行穩定計算,並對摩擦角和粘聚力進行穩定的敏感
  18. The study lies in following aspects : 1 ) a great number of experiments on sfrc are carried out to obtain the basic data of sfrc energy properties, which are the fundamental parts of further study. 2 ) a probability analysis based on statistical theory is done to all the experiment data. in the end, energy criterion for sfrc associated with security criterion are calculated and listed for future use

    本文主要針對鋼纖維噴射混凝土在單層隧道襯砌中的應用進行了研究,內容包括以下幾個方面: 1 )進行了大量的鋼纖維混凝土標準試件試驗,試驗的成果和數據為研究鋼纖維混凝土的能量特徵提供了事實依據和參考; 2 )運用概率統計方法對鋼纖維混凝土的指標進行了可靠,得出了實際可以接受的保證率下的鋼纖維混凝土能量指標; 3 )通過合理的假設和簡化,研究了鋼纖維混凝土構件在過程中的能量耗散機理。
  19. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水庫泥沙淤積入手,水庫泥沙淤積特和庫區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫容、造成同級流量下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大量淤積灘地無序圍墾造成旅遊資源等五方面影響的定,提出庫區圍墾堤是水庫水位抬升的重要原因。
  20. Compared with the destructive assay ( da ), nda has some obvious advantages : it is easy to make measurement automatically without sampling and changing the physical and chemical state of nuclear material, low cost, less operator exposure of radiation, much faster than chemical analysis and no hazards and wastes generated

    與化學破壞性分析( da : destructiveanalysis )相比, nda具有不樣品、容易實現自動化、快速、簡便、費用低廉和不產生放射廢物等優點。 nda核標準樣品的制備既費錢又費時。
分享友人