破斷位置 的英文怎麼說

中文拼音 [duànwèizhì]
破斷位置 英文
position of fracture
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.碎帶處理,趾板部採用混凝土塞,其它部採用半透水料換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  2. Aiming at the abnormal strata behavior in the advance entry of 1303 fully - mechanized working face in xinglongzhuang coal mine, the movement rule, characteristic, step distance of fracturing, position and mode of fracturing of the overlying strata in mining process is analyzed by using the key strata theory

    摘要針對興隆莊煤礦采區1303綜放工作面超前平巷發生奇異壓力的現象,採用關鍵層理論對在采動過程中的上覆巖層運動規律進行了詳細的力學分析,研究了它們的運動特徵、步距、裂方式以及對工作面及其超前平巷的來壓規律,對比分析了該工作面礦壓實測數據與理論研究成果。
  3. When the watermarking bit is destroyed, which position can be judged exactly, and then block checkout and hamming checkout are used to recover it. meanwhile, watermarking can be extracted without the original document and original watermarking information, which is significative copyright information, so it is a public watermarking technology

    抗攻擊時,能準確判水印比特壞的具體,並能通過塊校驗和海明校驗將壞的水印比特進行適當恢復;同時,提取水印時既不需要原始文本,也不需要原始水印,且提取的水印信息是有意義的版權信息,是一種公開水印。
  4. Considered local damage due to steels corrosion, fatigue, prestressing loses, whole bridge incline and distortion, this paper studies damage diagnosis technique of the cable - stayed bridge and determines the location and size of damages for yonghe cable - stayed bridge, which has been used after 15 years

    針對鋼筋腐蝕、疲勞、預應力鬆弛、橋梁整體傾斜或變形所引起的斜拉橋局部損,本文以使用15年後的永和斜拉橋為研究對象,對大型斜拉橋損診技術進行研究,對永和斜拉橋進行定、對其損程度進行評價。
  5. When an option is in a weak position at low levels and slowly working lower, making lower tops and lower bottoms, it is important to watch the last top or the point where an option breaks away from and makes new lows and never decide that the main trend has turned until the option begins to cross some of these levels from which it broke away

    當行情於低水平弱勢區並且以較低的價格緩慢變動,不創出一個較低的頂部和底部時,這時觀察行情最後創出新低的價格或的變化顯得極其重要,在行情未突並開始穿過一些水平線前絕不認為主趨勢已經反轉。
  6. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順序,指出憑主觀臆與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變
  7. Influence of the position and flow capacity coefficient of vacuum breaking value device on siphon breaks

    真空壞閥裝和風量系數對虹吸流的影響
分享友人