碎石坡 的英文怎麼說

中文拼音 [suìdàn]
碎石坡 英文
detrital slope
  • : 動詞[書面語] (觸; 撞) strike; bump
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 碎石 : spall; breakstone; gallet; galet; reduced stone; rubble; hardcore; debris; dust; macadam; chats; ...
  1. Travelers in mountain regions will be familiar with the accumulations of scree which occur at the base of steep slopes.

    山區中的旅行者對出現在陡底處的堆是相當熟悉的。
  2. The fieldworks and the test results show that there appears three failure models on the natural slope, that is, rotational slide, translational slide and earth flows. triaxal tests, including the isotropical consolidation drained and undrained compression and anistropically drained tests, are performed on loosely compacted specimens. the critical state line ( csl ) is obtained in the e - lgp " plot based on the results of the above tests

    在野外調查的基礎上,結合試驗成果分析,初步得出自然斜破壞的模式,包括旋轉型滑動、平移型滑動及土流等;並對暴雨滑轉化成泥流的影響因素和屑物質的運動距離作了定性分析;初步分析了滑轉化成泥流的流態化機理。
  3. Chung - ren chou, shinn - shan yan, 1996, a numerical analysis of multiple cylinders in wave - current field, coastal engineering in japan, vol. 39, no. 2

    周宗仁、瑞祥, 1996 ,斜上考量波效應波浪變形之研究,港灣技術第十一卷第一期。
  4. Chou, chung - ren, shinn - shan yan, 1996, a numerical analysis of multiple cylinders in wave - current field, coastal engineering in japan, vol. 39, no. 2

    周宗仁、瑞祥, 1996 ,斜上考量波效應波浪變形之研究,港灣技術第十一卷第一期。
  5. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護機理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖小的節理破滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  6. 5. for frozen erosion the good measure is to cut slop and lining with coarse gravel ; meanwhile, adjust the canal operating to less the frozen

    ( 5 )對于凍融和凍脹較為嚴重的渠段則宜採用削后鋪護岸;為減輕凍融侵蝕,同時採取適當的調度方式。
  7. In early december, shan left for school one morning, and her grandparents walked up a rocky hillside toward their small plot

    12月初的一天,珊珊去上學了,爺爺奶奶則走到一塊充滿地,開始他們的耕種。
  8. The geologic condition of side slope is complex. it is composed of soil and intense weathering rock on the surface and slightly weathering rock under the surface. further more, it has many faults, fissuring and weak intercalations

    其水電站尾水渠高邊所處區域地質條件復雜,邊表面由幾米至十幾米厚的積土和強風化破組成,下部是弱風化和微風化巖組成,且斷層、節理和軟弱夾層分佈廣泛。
  9. From csql to csq5, the barrier system was the main system. from psql to psq5, the carbonate ramp was the main system and from psq6 to psq8 the main system was fluvial and fluvial - delta system in brackish basin. from psq9 - psql2, the main system turned to the fluvial - delta system

    炭世csq1 ? csq5層序以屑海岸障壁?瀉湖和碳酸鹽緩沉積體系為主;早二疊世早期psq1 ? psq5層序以碳酸鹽緩沉積體系為主,早二疊世晚期psq6 ? psq8層序以半鹹水盆地河流、河流三角洲沉積體系為主;中二疊世psq9 ? psq12為陸相沖積扇、河流、湖泊三角洲沉積體系。
  10. A loose deposit of rock debris accumulated through the action of gravity at the base of a cliff or slope

    塌積物在峭壁或斜底部由於重力作用堆積形成的巖片鬆散的堆積物
  11. Some scientists propose, however, that kilauea may currently be protected from catastrophic collapse by several underwater piles of mud and rock ? probably debris from old flank collapses ? that are buttressing its south flank

    然而,某些科學家提出,奇勞亞火山目前之所以能免於災難性的崩坍,是因為目前海面下的砂泥柱撐住了火山的南側,而這些砂泥柱可能正是之前從南上崩落的礫。
  12. Consequently, the university applied environment - friendly methods to the problem, making use of the rocks and sand left by the collapse of the slopes along the streams to repair the banks on either side

    故大學採取環保的方式,利用溪澗旁斜崩塌下來之及沙泥,修築溪澗兩旁,並清走淤泥。
分享友人