  1. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝面板堆石壩上游坡面傳統的墊層料超、削坡、斜坡的施工方法存在許多弊端。
  2. Earthfill, rockfill, concrete, riprap, rcc

    混凝料類
  3. In accordance with the construction of xi ' ning - huangyuan first class highway and machangyuan - ping ' an high - speed highway, based on a good deal of investigation, this paper studies the geologic character and the main physical mechanics of the collapsibility loess in qinghai. this paper also studies the foundation treatment effect with dynamic consolidation, impact rolling, lime pile and lime - soil cushion. to dynamic consolidation, much attention is given to the relationship between the ramming energy and the effective depth

    本文結合西湟一級公路、馬平高速公路建設,對青海地區濕陷性黃進行了大量勘探調查,總結研究了青海地區濕陷性黃的地質結構特點、主要的物理力學性質及其規律;並通過現場試驗,系統地研究了強夯、沖擊、灰擠密樁和灰等地基處理方法的施工工藝及處理效果。
  4. 3d modeling simulation and pressing optimization of pipe culverts under effect of road roller

    公路涵管的三維模擬與優化
  5. Earth - moving machinery - rollers and landfill - compactors - terminology and commercial specifications

    機械.機和機.術語和商業規范
  6. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿機的擠滑模原理,創造性使用邊墻施工法,在每築一層墊層料之前,用擠式邊墻機製作出一個半透水混凝小墻,然後在其內側按設計鋪壩料,用振動平面,合格后重復以上工序。
  7. It is shown that the bruises of geogrid are decreased if sheep - foot roller is used when lay - down thickness deeper than 30cm. the deformation of geogrid mainly comes of construction. the infiltration of rainwater is disadvantage for the stabilization of geogrid reinforced embankment

    研究表明:在虛鋪厚度大於30cm的情況下,採用羊腳路機能有效減小工格柵的損傷;實際工程中工格柵的變形主要來源於施工的影響;雨水的入滲對工格柵加筋路堤的穩定性極為不利;水泥是經濟合理的坡面防護措施。
  8. After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction

    在對國外邊墻施工法進行細致調研后,從2001年開始,陜工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠機,在黑河工地進行了現場擠混凝邊墻和墊層料鋪的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板壩工程中創新採用了這一技術。