礦井排水泵 的英文怎麼說

中文拼音 [kuàngjǐngbèishuǐbèng]
礦井排水泵 英文
mine drainage pump
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(吸入和排出流體的機械) pump
  • 礦井 : [采礦工程] mine; pit; grube; groove; shaft; wheal; underground mine
  • 水泵 : water pump; compressed water pump水泵房 pump house; 水泵缸套 hoghead; 水泵工 plugman; 水泵間 [土]...
  1. Automatic silt - cleanup equipment of major drainage pump in mine

    籠頭自動清淤裝置
  2. An approach to the method of the flow rate measurements of main pump in mine

    流量監測方法探討
  3. In the mine drainage system many drainage pumps must work correspondly

    摘要在煤下的系統中,需要多臺協調地工作。
  4. Hunan general motor pump industry limited a complete range of products, involving metallurgical machinery, mining transport, energy development, power plant auxiliary equipment sets, urban transport, ships, ports and offshore drilling platforms electrical and mechanical equipment, power distribution equipment, high - rise city, - complete sets of equipment, water supply and drainage pumping station complete sets of equipment, water projects, environmental protection projects, as well as wire and cable, electrical materials

    湖南通用電機業有限公司的產品門類齊全,涉及冶金機械,山采運,能源開發,電站輔機成套,城市交通,船舶,港口和海上鉆平臺機電設備,輸配電設備,城市高樓電控成套設備,給站成套設備,利項目,環境保護項目以及電線電纜,電工材料等。
  5. According to statistics, since at 6 : 00 on the 30th to 31, 6 pm, vertical pumpinstalled in the mine incidents around the drainage pump a total of 132, 200 cubic meters of water pumping

    據統計,自30日6時至31日6時,安裝在事故周圍的共抽13 . 22萬立方米。
  6. Aiming at the characteristics of drainage pumps in mine, the paper presented a method of realizing balance run and automatic shift of multi - motor of drainage pumps by analyzing the control demand of drainage pumps and searching the optimization scheme between the reliability, simplicity and economy of system control

    文章針對煤的特點,通過分析其控制要求,在系統控制的可靠性和控制實現的簡潔性、經濟性之間尋求最佳化,給出了實現多臺電機均衡運行和自動輪值控制的一種方法。
  7. Up at 6 : 00 on the 31st, installed in the mine incidents around the drainage capacity centrifugal pumpsto pump 6, 190 cubic meters / hour, huayuan mine water than the previous highest level fell 44. 55 meters

    截至31日6時,安裝在事故周圍的能力達到6190立方米/小時,華源煤位比此前最高位下降44 . 55米。
分享友人