礦山排水 的英文怎麼說

中文拼音 [kuàngshānbèishuǐ]
礦山排水 英文
mine de-watering
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  • 排水 : drain off water; drain away water; dewatering
  1. By summarizing and analyzing the geological setting, uranium source, paleoclimate, hydrology, lithologic - lithofacies conditions in the region, it is indicated that the quantou formation in fanjiatun - jiutai area and the qingshankou formation in yangdachenzi area are potential metallogenic prospective areas for in - situ leachable sandstone type uranium deposit in the region, which develop braided channel or delta marginal sandstones, and possess favorable forming conditions of interlayer oxidation zone, and constituting supply - passage - discharge system of abundant uranium source

    綜合研究區域成地質背景、鈾源、古氣候、文地質、巖性巖相條件,認為范家屯九臺一帶的泉頭組及楊大城子一帶的青口組發育辮狀河或三角洲前緣砂體,構成了鈾源供應充足的補徑系統,具有有利的層間氧化帶形成條件,是本區地浸砂巖型鈾的有利成遠景區帶。
  2. An iron - containing material with an iron grade of over 20 % can be recovered from magnetic separation tailings of liuling iron mine by gravity method. this material can be used instead of partial clayey material to produce portland cement so as to reduce the mine tailings discharge amount to 43. 52 %, to raise the iron recovery from 70. 89 % to 84. 62 % and to reduce the iron ore powder consumption in raw cement mixture and the energy consumption of raw material grinding

    用重選法從劉嶺鐵磁選尾中回收鐵物,可獲得鐵品位大於20 %的含鐵物料,用此物料代替部分粘土質原料生產硅酸鹽泥,使放量減少至43 . 52 % ,鐵的回收率由70 . 89 %提高到84 . 62 % ,並且減少了泥生料配料中鐵粉的用量,降低了生料粉磨能耗。
  3. Hunan general motor pump industry limited a complete range of products, involving metallurgical machinery, mining transport, energy development, power plant auxiliary equipment sets, urban transport, ships, ports and offshore drilling platforms electrical and mechanical equipment, power distribution equipment, high - rise city, - complete sets of equipment, water supply and drainage pumping station complete sets of equipment, water projects, environmental protection projects, as well as wire and cable, electrical materials

    湖南通用電機泵業有限公司的產品門類齊全,涉及冶金機械,采運,能源開發,電站輔機成套,城市交通,船舶,港口和海上鉆井平臺機電設備,輸配電設備,城市高樓電控成套設備,給泵站成套設備,利項目,環境保護項目以及電線電纜,電工材料等。
  4. Massive mining drainage has been discharged from zibo mines, shandong province. it flows downslope or along channel and finally discharge into the xiaofu river. mining drainage lowered the ph value, raised the hardness and the contents of so

    東淄博煤每年出大量的,它們多是隨地漫流或沿渠流動,最終入孝婦河。
  5. Project and engineering consultation in water envioronmental protection large scale water supply and drainage system and high building fire system taoling deposit and transport system fire system for oil station lpg station etc

    擅長環境保護治理,大型給及高層消防工程庫及尾輸送系統以及油庫,液化氣庫的消防工程與技術咨詢。
  6. Abstract : an iron - containing material with an iron grade of over 20 % can be recovered from magnetic separation tailings of liuling iron mine by gravity method. this material can be used instead of partial clayey material to produce portland cement so as to reduce the mine tailings discharge amount to 43. 52 %, to raise the iron recovery from 70. 89 % to 84. 62 % and to reduce the iron ore powder consumption in raw cement mixture and the energy consumption of raw material grinding

    文摘:用重選法從劉嶺鐵磁選尾中回收鐵物,可獲得鐵品位大於20 %的含鐵物料,用此物料代替部分粘土質原料生產硅酸鹽泥,使放量減少至43 . 52 % ,鐵的回收率由70 . 89 %提高到84 . 62 % ,並且減少了泥生料配料中鐵粉的用量,降低了生料粉磨能耗。
  7. Alkaline mine drainage

    堿性
  8. Acid mine drainage waste

    酸性
  9. Lafarge dujiangyan cement co., ltd. obeys lafarge group environment protection policy and international environment protection standard strictly, has invested 74 million rmb on exhaust emission, noise treatment, waste water disposal, plant virescence and quarry vegetation recovery, making the plant a garden - like modern plant

    都江堰拉法基泥有限公司秉承拉法基集團生態環境保護政策,執行國際最嚴格的環保標準,在廢氣放、噪音治理、廢處理、工廠綠化和植被恢復等方面投入資金7400萬元,把工廠建設成了真正的現代化花園式工廠。
  10. This thesis aims at putting forward the designation routes of an automatic monitoring & controlling system of a mine drainage pipelines for the purpose of solving the problem

    由此提出污輸管線自動監控系統的設計思路以解決問題。
  11. Abstract : measures for waste water management from re co very processing of zhushanxia uranium deposit of wengyuan mine is analyzed in th is paper, which include improving process flow, recycling process water used in ur anium mill as much as possible and choosing asuitable disposing system. all these can decrease the amount of waste water, and also reduce costs of disposing waste water and harm to environment

    文摘:翁源鈾井采冶工程恢復生產過程中,通過改進生產工藝流程、實行工藝閉路循環及選擇合適的廢處理方法等綜合措施加強廢管理,減少了廢產生量和放量,降低了廢處理成本,改善了環境質量。
  12. A strain of penicillium sp. gxcr1 was isolated from waste sludge out of the effluent channel in the mining area. the gxcr1 has very high copper resistance, and was susceptible to the benomyl

    礦山排水溝污泥中分離到一株高抗銅的同時對苯菌靈( benomyl )敏感的青黴菌( penicilliumsp . ) gxcr1 。
  13. Design and application of forcing air discharge device for water drainage of mine pump without bottom valve

    泵無底閥壓風空氣裝置的設計和使用
  14. Preliminary application of gms in simulation of groundwater seepage flowing field in dumping site in southeast of gushan iron mine

    在姑東南區土場地下滲流場的應用初探
  15. S, sh series pumps are splitacase centrifugal punps. they can pump clear water and liquid with chemical composition similar to water without solid temperature of liquid is limited to 80 degrees to centigrade. thesepumps can be used for water supply to projects

    Sh系列泵是中開式離心泵,供輸送清及理化性質類似於,不含固體顆粒的液體之用,液體最高溫度不超過80 ,適用於工廠、、城市、電站的給及農田灌和各種利工程。
  16. Strengthen guarding of factories, mining structures, reservoirs, bridges, mining tunnel entrances, and high - voltage power lines. stand fast at your posts. designate persons for individual posts. report urgent situation

    加強工作、庫、橋梁、隧道入口,以及高壓線路的保衛工作。堅守你們的崗位。安專人值守崗位。報告緊急情況。
  17. Flood impact assessment reports for oilfields, railways, highways, mines, power plants, telecommunications installations and pipelines to be built within flood storage and detent ion areas should include flood control and flood evasion plans arranged by construction units themselves

    在蓄滯洪區內建設的油田、鐵路、公路、、電廠、電信設施和管道,其洪影響評價報告應當包括建設單位自行安的防洪避洪方案。
  18. Our products are widely used in industry mining, light textile chemical industry fire fighting, air - conditioners, environment protecting, water service of tall buildings and irrigation and drainage of agiculture. the products sell well aroud the country and are appreciated by all the consumers

    本公司生產的產品,廣泛用於工業、、輕紡、化工、消防、空調、環保、城市高樓給,農業灌等,產品暢銷全國各地,深受用戶好評,取得了良好的社會效益。
分享友人