礦石開采設施 的英文怎麼說

中文拼音 [kuàngdànkāicǎishèshī]
礦石開采設施 英文
mineral miner facility
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 采名詞(采地) feudal estate
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 礦石 : ore; mineral
  • 設施 : installation; facilities
  1. Develop as the development of socialist market economy, the buildup of idea of people goods economy, the person with thin idea of a few legal system, below the drive of economic interest, illegal building takes up the road is produced or waste material of rubbish of operation of stone of blast of market trade, cut into a mountain, mining, dump and building is formed to be banned repeatedly inside formulary control division more than ; use illegally, embezzlement, pollution, destroy, destroy highway the road is produced and trade of strike of facilities of larcenous highway transportation, machines and tools, equipment, raw material, steel is cultivated and the random on highway check that set a station, chaos collects fees, random amerce, highway is shown street change spread ; exceed restricted transport to be defeated the in good condition, safety that waits for minatory highway, expedite the development with highway career, of benefit of the economic benefits of highway, society and level of road network service rise, more and more rely on what road politics government works to strengthen

    隨著社會主義市場經濟的深入發展,人們商品經濟觀念的增強,一些法制觀念淡薄的人,在經濟利益的驅動下,非法建築物佔用路產或在規定控制區內形成集市貿易、山炸作業、傾倒垃圾和建築廢料屢禁不止;非法利用、侵佔、污染、毀壞、破壞公路路產和盜竊公路交通、機具、備、原材料、盜伐行道樹以及在公路上亂站卡、亂收費、亂罰款,公路呈街道化蔓延;超限運輸等威脅著公路的完好、安全、暢通和公路事業的發展,公路的經濟效益、社會效益和路網服務水平的提高,越來越依靠于路政治理工作的加強。
  2. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆壩原位觀測和反潰分析研究」及「高土壩動力分析及抗震工程措研究」咨詢項目提出了具有拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力計院納,工程效益顯著; 「甕福磷膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福肥基地建,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  3. The results of static evaluation show that ore mining fee is the main part and amortization of both building and equipment and major materials fee are the secondary parts in the total cost of pithead heap - leaching mining

    靜態評價結果表明,在坑口堆浸總成本中,費用佔了相當份額,其次是土建工程及攤銷費用、原材料費用。
分享友人