穩固工程 的英文怎麼說

中文拼音 [wěngōngchéng]
穩固工程 英文
stabilization works
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 穩固 : firm; steady; stable
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加作用,並推導了在簡單荷載作用下,含有襯砌、等效加后的圍巖、原始圍巖三者的彈塑性解析解,對設計有著重要的參考意義;在數值模擬方面,以考慮錨圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞定性分析項目為實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Technology of old cement concrete pavement broken and stable in motorway ' s heavy repair

    高速公路大修中舊水泥混凝土路面破碎技術的應用
  3. The company main product includes : the oak school absorption of shock series, is hanging the hydraulic pressure series, the bushing, the engine support and so on ; is suitable the vehicle type : reynold, the big space, are beautiful, asia, populace austria enlightens, toyota, the valuable horse, ma zida, the nepali mulberry, ou bao, runs quickly, mitsubishi, the modern age and other ; the company produces the type many, productivity high, the quality is superior ; in order to guarantee the product quality, the large amount of money has introduced the world most advanced production equipment and the check - out facility ; and aimed at the company concrete condition to carry on large - scale technical, the craft, the equipment and the flow transformation, truly achieved take the customer demand as the center, carried on the fine profit production according to the customer request, entrusted with the customer by this to be stronger, the sustainable competitive advantage ; the company already has established the stable long - term cooperation relations with the overseas many enterprises and the dealer, the product sale network cover various countries, and unceasingly attracts the more and more many overseas customer

    公司主要產品有:橡校減震系列、懸掛液壓系列、襯套、發動機支架等;適用車型:雷諾、大宇、標致、起亞、大眾奧迪、豐田、寶馬、馬自達、尼桑、歐寶、奔馳、三菱、現代及其它;公司生產種類多,生產量高,品質優越;為了確保產品質量,巨資引進了世界最先進的生產設備和檢測設備;並針對公司具體狀況進行了大規模的技術、藝、設備和流改造,真正做到以客戶需求為中心,按照客戶的要求來進行精益生產,以此來賦予客戶更強的、可持續的競爭優勢;公司現已跟國外多家企業及經銷商建立了的長期合作關系,產品銷售網路覆蓋世界各國,並不斷吸引越來越多的海外客戶。
  4. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術分類及適應范圍進行了理論上的分析研究;然後結合實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施方案的研究和實施過中,對于組織進行綜合闡述,並就人挖孔樁、承臺梁、地下加層及結構加、整體結構定等專項施方案提出有針對性的施技術措施,人挖孔樁施採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施序;承臺梁施採用梁主筋橫穿柱身化學膠錨等;地下加層綜合施技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自等;最後對于該實施后的效果分析,說明該項綜合施技術的可行性。
  5. Application of this new style, and using of orthogonal test, we make a lot of researches over coal gangue cement stabilized soil, coal gangue fly ash cement stabilized soil, synthesis stabilized soil, and then get optimization recipe which can be applied in road engineer

    應用這種新型化劑,並採用正交試驗設計方法,分別對煤矸石水泥定土、煤矸石粉煤灰水泥定土、綜合定土等進行了大量的試驗研究,獲得了可應用於道路的優化配方。
  6. We research the causes of concrete cracking, develop the high performance anti - cracking additive, optimize the concrete mix and construction techniques, increase the stability of concrete volume by shrinkage compensation, enhance splitting tensile strength, and can meet demand of high workability of fresh concrete. in the study, a thorough investigation of this problem is made from all points of view, with the aid of various modern measurement & testing technology and different theories & methods in surface physical chemistry, structural chemistry, solid - state chemistry, composite materials, fracture mechanics, etc. our research results have shown that the various shrinkage of concrete cause concrete cracking in building engineering, such as autogenous shrinkage, dry shrinkage, temperature shrinkage, plastic shrinkage, carbonized shrinkage, etc

    目前,解決混凝土開裂的方法是綜合的,我們調查研究了混凝土開裂的原因,開發研製了高性能抗裂外加劑,優化混凝土的設計和施方法,並通過補償收縮達到混凝土體積定,提高抗裂強度,滿足混凝土拌和物高作性能的要求。本研究採用多種測試技術,應用表面物理化學、結構化學、體化學、復合材料學、斷裂力學等多學科的理論與方法,從不同的角度進行深入的研究和探討。通過調查研究建築中出現的混凝土開裂、滲漏問題,發現混凝土在非荷載作用下開裂主要是由混凝土的自收縮、乾燥收縮、溫度收縮、塑性收縮、碳化收縮等各種收縮變形引起的。
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大壩體的靜動力安全定性及溫控方案提供依據。
  8. Stability of solid structures in water engineering

    水利的堅結構的定性
  9. Ground compaction job is a important foundational project of earthwork construction water power engineering civil engineering and city planning engineering etc. good compaction can evidently improve ground ' s carrying capacity and stability and can reduce or remove the subside of the base, so that every project in using have a very steady base

    基礎壓實作業是土建築、水建築、道路、市政等建設中一項非常重要的基礎性。基礎經過良好的壓實,能夠顯著改善其承載能力和定性,降低甚至消除地基的沉降,從而使各項在其使用期間有非常的基礎。
  10. Soil embankment is widely used in water conservancy and flood prevention projects because of its being able to drawing on local resources and other advantages. how to analyze and calculate the seepage and stabilities of levees under high level flood reasonably, and supply reliable technological support for dangers removing and strengthening are of great engineering significances

    土質堤防因具有能就地取材等優點而為水利及防洪廣泛採用,合理分析與計算高洪水位作用下堤防的滲流及定性、為除險加提供技術支撐具有重要的實際意義。
  11. This paper has come to some comprehensive conclusions on the basis of the practical use of this double - index evaluation method in the slope of pishihang channel. a calculating program for the double - index evaluation method is compiled to raise the calculating efficiency. the reinforce measures that adopt the new thesis of renewing stress and the expansive anchor are presented

    本文針對淠河總乾渠(城區段)邊坡這一實際引入了安全系數和可靠度相結合的雙重指標體系分析方法進行定分析,得出了較為全面的結論;在雙重指標體系分析方法的基礎上編制了計算序,提高了計算效率;應用應力重塑新思想及其配套實施手段?膨脹錨提出了初步的邊坡加解決措施。
  12. Based on the design load and the whole stability of the link, a better method of reinforcement is obtained in the paper combining with the practice of project, and the validity of this method is verified by adopting the program of finite element

    摘要根據設計荷載,抱桿在滿足整體定性的前提下,結合實踐選擇較好的加方案,並採用有限元序對加方案進行驗算,驗證所採用方案的正確性。
  13. Pressure grouting has made piles and soil combinaion closely at the same tiine, the piles liave hand load capacity more than ever currenly, the design and calculation of root piles have been short of a sult of fledged theory aner referencing the application of root piles in underpinning engineering and basing on the intrinsic cbaraer of root piles in thes paper the authr has ehabshed mle constitutive relative of root piles and soil in correctin slopes, researched the slope edility aller correcang slopes and safety factr of slopes

    樹根樁可以看作是一種摩擦樁,它不僅可以承擔豎向荷載,而且還可以承擔水平荷載,用壓力注漿可以使樁與土體緊密結合,使樁具有較大的承載力。當前,對樹根樁的設計計算卻沒有一套成熟的理論,本文在參考了樹根樁應用於托換的設計計算方法后,根據樹根樁的實際特徵,詳細推導了樹根樁加邊坡后樹根樁與土均質化復合「土體」的本構關系,研究了樹根樁應用於邊坡加后的定性情況。
  14. The rock masses stability of hydraulic structure and geo - technical project is thoroughly studied in the theory and its application in this paper, some complicated problems in practice are solved, the physical relationship of the fractured masses and numerical simulating methods of reinforced rock masses are explored in theory

    本文就水結構和巖土中的巖體定性問題,從理論和實踐上進行了較為深入的研究,解決了實際應用中的一些難點問題,對裂隙巖體的本構關系及錨數值模擬方法進行了理論與應用探討。
  15. The jcbme consists of over 50 research fellows and 110 postgraduate students and is another boost of the long - term cooperation between the chinese university and zhejiang university. it also further strengthens the two universities leading role in biomedical engineering

    中心現有五十多名研究員及逾百名研究生,是中大與浙大在長久的合作基礎上又一次重大合作,也有助鞏兩所大學在生物醫學的卓越地位。
  16. In the paper, static and dynamic triaxial tests were conducted on fiy ash at shanmenxia longgou ash dam, and the static and dynamic parameters of fly ash were obtained. thirdly the 2 dimensions static analysis of the ash dam was conducted based on biot ' s consolidation theory and duncan ' s nonlinear stress - strain model. finally the plane dynamic behaviors of the ash dam during earthquake of intensity 7 were analyzed based on the exponent function model of excess pore water pressure aroused by earthquake, which is put forward in the paper, and equivalent visco - elastic dynamic fem model and principle of effective stress

    本文結合實際,對三門峽火電廠龍溝灰壩的築壩粉煤灰進行了靜、動三軸試驗,確定了該壩粉煤灰的靜動力學指標;然後根據比奧( biot )結有效應力原理,採用鄧肯( duncan )非線性應力應變模型,對該灰壩的二維靜力應力和變形狀態進行了分析;最後利用本文提出的地震超靜孔壓指數函數模型,採用等價粘彈性動力有限元方法,對該灰壩在地震作用下的動力定性進行了分析評述。
  17. The company already had a solid dealer organization, as well as engineers second to none.

    該公司有著十分的銷售組織,而且擁有一批最優秀的師。
  18. Abstract : due to insufficient maintenance and intensive mining operation, the slope of an open pit mine becomes unstable with serious danger potential to normal operation of the mine and to safety of people ' s life

    文摘:為研究某礦邊坡的定狀況並為邊坡的加提供可靠依據,在邊坡硐室內進行地應力測量。
  19. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡復雜性和錨的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化度、破碎度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加進行動態設計,確保坡體定結構安全。
  20. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    定性分析的基礎上,以邊坡定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加的具體布置時是否存在不定體從錨索或框架梁的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
分享友人