穩定值區 的英文怎麼說

中文拼音 [wěndìngzhí]
穩定值區 英文
region of stable values
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 區名詞(姓氏) a surname
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. Research show that wavelet varied - grid feature vector is characterized by high - stable and high - distinguish. based on this vector the apery cognitron has solved the harmony of single - classifier and multi - classifier and the harmony of multi - feature. the data shows that the recognition rate and reliability has been effective improve

    實驗數據表明,小波變網格特徵向量具有性高、分性強的特點,基於此的智能字元識別機解決了單、多分類器協調和特徵協調問題,在應用快速二化方法加強處理實時性的同時有效地提高了車牌字元的識別率和識別可靠性。
  2. It is proved that the electric conductivity of ore - forming solution can be used to seek for ore - forming fractures, to select the best mineralization section, to distinguish industrial and non - industrial auriferous quartz veins, to reflect the rich or poor levels of orebodies, to evaluate the stability of orebodies, to judge the denuding levels of ore veins, and to prospect the mineralization in depth

    實踐證明,該方法在以下幾個方面具有應用前景: ( 1 )查找成礦斷裂,優選最佳成礦段; ( 2 )分有無工業價的含金石英脈; ( 3 )反映礦段或礦體的貧富程度; ( 4 )評礦體的性或礦化不均勻性; ( 5 )評估礦脈的剝蝕程度; ( 6 )礦脈深部成礦預測。
  3. The le - an oil field is located on the southern slope of dong - ying sag. there are two sets of ek basalt in its western block. depending on the drilling, the logging and the seismic date, tha ek basalt has the characteristics of high resistancs, the low sound wave defferance and faradic conductance, the smooth curve of self potential

    樂安油田位於東營窪陷南斜坡上,其西發育了兩套孔店組玄武巖,根據鉆井、測井、地震資料,孔店組玄武巖具有電阻率高、聲波時差和感應電導率低、自然電位曲線平直的特點,地震波呈板狀強反射;沉積期該有有二次火山活動,玄武巖平面分佈比較,噴發方式為「裂隙式噴溢」 ,火山口分別位於草12和草31井附近。
  4. We can use the mm5 model in definite time, definite area weather forecasting. we conclude that : : the moving route of this necw in its developing progress was direct - south along latitude, the cold air is rough, and just this made the rough vertical velocity ; the necw southern moving and conflicting with the west pacification sub - tropical high makes rough jet steam. the plenty south - west warm and wet air made by the jet stream gave the rainstorm demanded vapor ;. the rough vertical velocity by jet stream is a main reason in this rainstorm ; the mm5 model uses four - direction analysis data as its input, this avoids some errors occurred in observe and transfer, thus made the result more useful

    綜合分析認為: ( 1 ) 、這次冷渦在其發生發展過程中,其移動路徑是沿經圈直線南壓,攜帶的冷空氣勢力較強,形成槽后較強的垂直運動; ( 2 ) 、西太平洋副熱帶高壓偏北位置與東北冷渦南壓形成的急流軸,把源源不斷的西南暖濕氣流輸送到遼西地,也就是急流軸的左前方位置,為這次暴雨的產生提供了充足的水汽來源; ( 3 ) 、低空急流不但為暴雨輸送水汽,其造成的較強的垂直環流也是產生強降水的一個主要原因; ( 4 ) 、 mm5模式以四維同化資料作為初始場,最大限度地避免了觀測誤差可能造成的積分不,提高了模擬結果的參考價
  5. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    收集現有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行綜合系統地統計分析;通過野外風沙流場測,分析適宜風沙流順利通過的路基高度;通過室內風洞試驗進行驗證;結合路基性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,最終提出不同地不同等級沙漠公路路基填土高度的合理高度建議
  6. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地公路進行調查、觀測了十余條線路,近百段路段,以『 210國道包頭至東勝一級公路』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流路基高度的關系、風洞試驗;對調查路段及依託工程調查、觀測結果統計研究;不同高度下路基性分析;路基經濟性分析;按照沙丘類型及公路等級提出路基合理高度推薦
  7. The thesis built the relation between containing water and the properties of trail dam ' s soil by geomechanical properties of trail dam ' s soil ; analysed the seep rule of water in the trail dam ' s field and the change of soakage line. the thesis applied the limited element to analyze the trail dam of baogang by the engineering item in production. it calculates the dynamic and static response about the dam using the numerical simulation method

    本文通過大量的尾礦土物理力學性質試驗資料,建立了含水量與尾礦土性質之間關系曲線;分析了水在尾礦壩的滲流規律和不同標高時浸潤線的變化情況,為分析尾礦壩的性提供依據;結合生產上的工程項目,從包鋼尾礦壩的性研究入手,應用有限元法,通過數模擬分析了水對尾礦壩的靜力、動力性影響。
  8. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構性方面進行模擬計算和量研究。
  9. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口「三木花園」開發建設項目,從地下空間靜力結構性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  10. It has been shown that whether resonant or non - resonant interaction system, the kerr effect weakens the coupling of the field - atom, shortens the cycle of quantum collapses and revivals of the atomic level occupation and makes the nonclassical correlation properties steady. kerr effects on the properties of the correlation, on the correlation intensity between the two - mode, on the photon - number distribution and on the bunching or antibunching effect of the two - mode su ( 1, 1 ) coherent states produce obviously different characters when it is changed the initial intensity of the light field. that is to say, kerr effect on the two interaction systems is accorded

    計算結果表明:無論是共振還是非共振相互作用, kerr效應均使原子與光場的耦合減弱,原子布居的崩塌與復甦的周期縮短,光場的非經典相關的性增強;在初始光場較弱和較強兩種情況下,類kerr介質對雙模su ( 1 , 1 )相干態場兩模間的相關性、相關程度以及光子的聚束與反聚束效應產生的作用均有明顯的別,即kerr效應對系統在共振及非共振作用時的影響是一致的。
  11. A normal transform is introduced, and there are enough much grids in the region between the critical layer and the wall, where the variation of the disturbance is the quickest. the finite - difference of governing equations with fourth - order accuracy in the normal direction is utilized in full regions including points close the wall, and is very important for accurately discreting equations. the combination of global and local methods is implemented, and a new iterative formula is derived

    對于曲線坐標系下的拋物化性方程,文中發展了求解的高效數方法:引進法向變換,使得在臨界層與壁面之間的擾動量變化最快的域有更多的法向網格點;導出包含邊界鄰域在內的完全四階精度的法向有限差分格式,這對方程精確離散至關重要;採用全局法和局部法相結合的方法及其新的迭代公式,大大加速收斂並得到更精確的特徵
  12. The analysis and safety evaluation on the dynamic stability are the key technique of high - speed railway over - section cwr. studying on a theory for dynamic stability of high - speed railway cwr and a method for safety evaluation is of great theory value and realistic meaning

    高速鐵路無縫線路動力性分析及其安全評估是高速鐵路跨間無縫線路的關鍵技術之一,其研究具有重要理論價和現實意義。
  13. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩地應力場的研究開始,通過動態數模擬分析這一新的模擬思路,系統地研究了深切峽谷地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞的變化特徵,進行了全過程動態數模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖性的影響。
  14. Using the system designed in this thesis work, flow field calibration of the wind tunnel is accomplished, which covers dynamic pressure drop coefficient, dynamic pressure time stability, axial static pressure gradient, boundary layer, and degree of turbulence, etc. boundary layer measuring principle and method are especially described in detail, the relationship between boundary layer thickness, wind speed setting, and the depth of the experimental section is summarized, and finally the calibration data for th e model center zone under specific wind speed are given

    然後利用本文設計的系統完成了落差系數、動壓時間姓、軸向靜壓梯度、邊界層及湍流度等內容的流場校測。特別對邊界層測量的原理及方法做了較詳盡的敘述,總結出邊界層厚度與設風速、實驗段深度的關系,然後給出模型中心風速下校正數
  15. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一科學研究價的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的性; ( 2 )針對三峽庫的特殊條件,系統分析了作用於三峽庫滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫岸坡滑體性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體性綜合分析評價系統,使對滑坡體性分析計算更方便、更準確; ( 5 )將上述滑坡體性綜合分析評價系統應用於重慶市豐都縣名山滑坡性分析的具體事例中,分析結果表明,本文所提出滑坡體性綜合分析評價方法對三峽庫的滑坡性分析是實用可行的。
  16. There were wind shear and maximum wind speed occurred above or below the height of potential instability area and one of them happened before potential instability

    位勢不所在高度的上方和下方會有風向切變和風速極大中心,並且風切變或急流中心會早於位勢不的出現。
  17. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準溫度場等線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非溫度場等線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的域。
  18. Through the theory of light radiation and intensity, we can use the fewest leds to satisfy the luminous intensity demand. through image segmentation theory, we can accurately pick module up from the test stripe when it is put in wrong directions. through image processing theory, we can acquire correct information and avoid the bad effects from the asymmetric chemistry reaction and instability of the devices

    用光的輻射和強度理論,我們計算出了獲得足夠圖像強度所需的最少光源;用圖像分割理論,我們在試紙條傾斜放置或有垂直方向上的偏移時,準確地提取出了各模塊的數據;用平滑濾波和均濾波理論,我們濾除了由於反應不均勻及硬體設備不帶來的噪聲;用交遇設計線性分類器的方法,我們降低了有限樣本設計線性分類器帶來的誤差,提高了檢驗準確度。
  19. Meanwhile, most aspects about this perspective are concerned, which include quantification of the soil water background of the plateau area, the regional spatial variation of soil water background and variation along the slope, mosaic structure and seasonal changes etc. the results show that : ( 1 ) for the fundamental circumstance for vegetation development is the original debilitated slope, so the perspective of soil water background specially for the loess plateau refers to the soil water conditions on the original slope. ( 2 ) the value of soil water background appears to be a descending trend from south to north based on the difference of vegetation zones. in the forest zone, soil moisture contents beneath 3m depth from the soil surface are more than 12 % usually ; in the forest - pasture zone, the values of soil moisture content beneath 4m depth underground are more than 6 % and stable, and tend to be ascending while the depth increases ; but the values in the dry pasture zone is lingering between 4 % to 6 % from the surface layer to sub - layers

    發展了「土壤水分背景」的概念,並以之為基礎對其各個方面進行了研究,使之形成一個相對獨立和完整的體系,主要包括黃土高原土壤水分的背景、土壤水分背景的域分異、坡面分異、鑲嵌結構及其季節分異等: ( 1 )由於植被生長發展、演替的基礎階段是天然草被群落,故認為黃土高原的土壤水分背景在概念上是特指該天然草被群落下的土壤水分狀況; ( 2 )黃土高原的土壤水分背景,根據植被地帶的不同表現出自南向北逐漸降低的規律:森林地帶3米以下土層水分背景普遍地高於12 ,森林草原地帶4米以下土層水分背景大於6 ,且均隨土層的加深水分含量逐漸增加,而草原帶的土壤水分背景自土表至底土層一直在4 6之間徘徊。
  20. Then, use galerkin principle to put the stability equation in order for the special function the mathieu standard form, and utilize the boundary of the mathieu solves ’ steady area and unsteady area, namely special relationships of and, draw the discrimination equation of losing the magnetoelastic steady critical state

    然後,應用galerkin原理將性方程整理為特殊函數馬丟方程的標準形式,並利用馬丟方程的域與非域的分界,即系數和的本徵關系得出了磁彈性最低失臨界狀態的判別方程。
分享友人