穩定期地震 的英文怎麼說

中文拼音 [wěndìngdezhèn]
穩定期地震 英文
silent earthquake
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ動詞1 (震動) quake; shake; shock; vibrate 2 (情緒過分激動) be greatly excited; be deeply ast...
  1. The le - an oil field is located on the southern slope of dong - ying sag. there are two sets of ek basalt in its western block. depending on the drilling, the logging and the seismic date, tha ek basalt has the characteristics of high resistancs, the low sound wave defferance and faradic conductance, the smooth curve of self potential

    樂安油田位於東營窪陷南斜坡上,其西區發育了兩套孔店組玄武巖,根據鉆井、測井、資料,孔店組玄武巖具有電阻率高、聲波時差值和感應電導率值低、自然電位曲線平直的特點,波呈板狀強反射;沉積該區有有二次火山活動,玄武巖平面分佈比較,噴發方式為「裂隙式噴溢」 ,火山口分別位於草12和草31井附近。
  2. According to composition and structure feature of jinjiang landslide analysis, the author considers it was a enormous landslide with the characters about multi - period ( total four slides ) and overlaying, its mechanism of deformation failure attributed to a representative sliding - bending mode in the consequent slope, the stability calculation indicates that no matter what the whole landslide would not slide, while, as earthquake intensity reaching or exceeding vi, the first - period landslide which lies to the south of huangjiagou in the front slip mass and the fourth - period landslide which lies to the north of caojialiangzi in the back slip mass will slide

    由金江滑坡的組成及結構特徵分析可知,邊坡為一多次(四次滑動)兼具超覆特徵的巨型滑坡,其變形破壞機制屬順層邊坡中比較典型的滑移?彎曲型。性計算表明,滑坡整體性較好,僅在遭遇度及其以上作用的情況下,堆積體前部靠黃家溝以南的第一滑坡及靠後部北側曹家梁子的第四滑坡堆積體才會失;因素敏感性分析表明,滑坡性對(尤以強)最為敏感。
  3. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的質環境與工程實際情況,在充分考慮水對庫岸滑體性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於下水位升高降低了滑坡體的有效應力,另一方面是由於下水的長浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長降雨狀態) 、 175m庫水位、以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體性綜合分析評價系統,使對滑坡體性分析計算更方便、更準確; ( 5 )將上述滑坡體性綜合分析評價系統應用於重慶市豐都縣名山滑坡性分析的具體事例中,分析結果表明,本文所提出滑坡體性綜合分析評價方法對三峽庫區的滑坡性分析是實用可行的。
  4. This article described the deformation features of taojiaba landslide and analyzed the inner factors, geologic setting, topography, morphology, stratum, lithology and texture, and the external influence factors, precipitation, flood, human activity, neotectonic activity and earthquake, and the transform features of landslide in the near future, and evaluate stability of landslide through the section coefficient method calculation on basis for landslide mechanism analysis and control work

    摘要陶家壩滑坡基本特徵顯示,滑坡變形的主要影響因素有:質環境因素(貌、層巖性、物質結構) 、外界影響因素(降水因素、洪水因素、人為因素、新構造及) ,以及滑坡近變形特徵,通過剖面遞推系數法計算,對滑坡的性進行了評價,為滑坡機制分析和優化整治措施提供依據。
  5. The results show that the planes are widely distributed and lie concealed, being the deformation traces left over by the seismological fault in the soil mass and in direct response to the recent tectonic activities, whice greatly influences on the stability of the soil mass as a part of the infrastructural subgrade

    結果表明:土體構造結構面分佈廣泛且具隱伏性,是發斷裂在土體中留下的變形形跡,是近構造活動最直接的反映,對工程基土體的性有重要影響。
  6. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失破壞。
  7. The method of location prediction of strong earthquakes using stable intersection regions of the linear epicenter migration track with short time and long distance, is called “ the intersection method ”

    由短、長距離、線性中遷移線交匯得到的交匯區進行強點預報方法稱為線性中遷移交匯法。
  8. The stability of the landslide is a critical problem for feasibility of the project, and has a direct influence upon the operation of the lower reservoir and the power system. the sliding mass has been studied by some designer in geological investigation. the study showed that guishan sliding mass is in stabilization under natural condition, is not in stabilization under vii earthquake intensity

    在前的研究中曾對滑坡體的問題進行了研究,研究結果認為從宏觀性分析,滑體處于狀態,但經過計算,在度烈度下,處于極限平衡或不狀態,為確保工程安全,對推動式的龜山滑坡體採取削坡減載的開挖方式將是行之有效的方案,這樣可以提高滑坡體在條件下的性,因此,研究龜山滑坡體在不同開挖方式方案條件下的性問題具有非常重要的實際意義。
  9. According to the original work on the stability problem of the left side of the river and the elementary analysis on the model of geological mechanism, two section planes of rock group t33 and j have been chosen to carry out the stability evaluation ( the slope stability analysis utilized the sarma program ), both of which have the different rock characters. when loads are calculated, the internal force, underground water, earthquake force, their combination and measure to deal with anchorage force infliction are also considered

    根據左岸邊坡問題的前工作和質力學模式的初步分析,並結合工程質條件調查,選取巖性構成不同的t33巖組和j巖組的兩個剖面分別進行性評價(邊坡性分析採用sarma程序進行) ,計算載荷考慮了自重、下水、力及其組合以及施加錨固力的處理措施。
  10. Analysis results indicate that the perfected analysis program is more practical and efficient, thus time limits for projects can be shortened

    計算分析表明,改善後的土石壩性分析程序具有更高的實用性,不僅便於進行結果分析,而且可以提高工作效率、縮短工程工
  11. Continuing health monitoring or regular condition assessment of important bridges is necessary to ensure that the bridges function well. in order to do that, a baseline finite element model of the target bridge is often indispensable not only for complex dynamic response analysis ( such as seismic analysis, wind - resistant stability analysis, train - bridge vibration analysis and so on ), but also for health monitoring of the bridge

    對于大型重要橋梁來說,無論是對其進行復雜響應分析(如響應分析、抗風性分析、車橋振動等方面的動力分析) ,還是進行長監測和健康狀態評估,一個準確和有效的「基準」 ( baseline )有限元模型都是不可缺少的前提。
  12. In this more global framework, it would be surprising if the characteristic parameters of the slow instabilities that span a large range of scales ( duration, dimension and amplitude ) did not obey a power - law distribution, just as earthquakes do

    在這種更加全球化的框架下,如果跨越很大標度間、尺寸大小和放大倍數的緩慢的不性因素的特性指標不遵循動力法則分佈,象進行的那樣,那才令人奇怪呢。 」
分享友人