穩定航行段 的英文怎麼說

中文拼音 [wěndìnghánghángduàn]
穩定航行段 英文
stable running portion
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞(船) boat; shipⅡ動詞(航行) navigate (by water or air); sail
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  • 航行 : 1 (水中行駛) navigate by water; seaway; sail 2 (空中行駛) navigate by air; fly 3 voyage; 航行...
  1. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩溫控並縫措施研究:為廠房壩並縫方案的可性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全性及溫控方案提供依據。
  2. The research of bend channel of reach guide - lijia flume from longyang flume to lijia flume in upstream of the yellow river is proceeded to present rules of feasibility analysis for navigation between the flumes and the riverbed stability

    摘要對黃河上游龍羊峽至李家峽間的貴德李家峽河的蜿蜒河道進了研究,為蓄水兩壩間的通和河床性問題提供可性分析依據。
分享友人