穹頂狀結構 的英文怎麼說

中文拼音 [qióngdǐngzhuàngjiēgòu]
穹頂狀結構 英文
domelike structure
  • : 名詞[書面語]1. (穹隆) vault; dome2. (天空) the sky
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. The design of cable dome is divided into three parts : pre - stressed calculation, static load applied calculation and variation load applied calculation. ansys software was adopted to compute the structure. the ansys program has many analysis capabilities, ranging from structural analysis, thermal analysis, electromagnetic field analysis to cfd flotran analysis

    分下述三個態進行計算:預張拉態、施加屋面恆載時的計算和屋面活荷載作用下的計算;本文對索進行計算時所選用的計算軟體為ansys軟體,它是融、熱、流體、電磁、聲學於一體的大型通用有限元分析軟體,可廣泛應用於核工業、土木工程、地礦、水利等一般工業的計算及科學研究。
  2. It can be widely used in nucleus domain, architecture domain and so on. by ansys software, the fourth part of this paper analyzed the static characters of the cable dome

    所設計的游泳館方案的受力性能如何,索和預應力態與的受力性能有何關系,本文第四章回答了這個問題。
  3. Some systemic and deep research work on the theory of suspen - dome is carried out in this thesis. based on reading many literatures, developmental history and present situation of suspen - dome are described, and project applications are introduced in this thesis

    首先,在大量查閱國內外文獻的基礎上,對弦支的發展歷史和現進行了描述,並扼要的介紹了其目前的工程應用。
  4. This paper introduces the development history and structural characteristics of cable dome, which is a new long - span space structure, and classifies cable domes according to their structural characteristics ; discusses the theory, method and progress of the calculation model and fem analysis concerning cable domes, describes the construction method of cable domes, and reviews and forecasts the status of study on cable domes

    摘要介紹一種新型大跨空間的發展歷程和特點,並對索進行了分類;論述索在計算模型和有限元分析方面的理論、方法和進展;闡述索的施工方法,並對索的研究況進行回顧與展望。
  5. A new method named inverse analysis of construction process is proposed to determinate the ideal status in each step of construction, including internal force and the coordinate of points. from the initial value that is the internal force and the geometrical coordinate of the initial state, according to the construction sequence to remove the cable - strut tensile structure, it can determinate the zero state of the structure

    該方法從弦支設計理想成形態(初始態)出發,以成形時索、桿內力和幾何態為初值,按照一定施工順序依次拆除各圈索桿,從而確定各個階段的施工控制參數(包括索力和坐標) ,最終確定的零態。
  6. Initial configuration determination of cable dome structure and analysis of it ' s configuration process

    初始態確定與成形過程分析
分享友人