  1. Based on the basic research, the hidden cavity was detected in changba lead - zinc mine with ground penetrate radar and rayleigh wave detector, and the detected result would provide technical support for safety mining

    分析了各自相應的適用條件,並綜合應用探地雷達和瑞雷波在廠壩鉛鋅進行了地下群區的現探測,基本查明了試驗區的分佈情況,為后續的安全回採提供了技術支撐。
  2. With the mining of no. 1 ore body which is solwly inclined, large and thick at the west flank of xinqiao pyrite mine as the example, analytic comparision is made between flat - back cut and fill stoping and sublevel open stoping with one - time delayed filling. the suggestion on the optimization of the mining and the discussion on appropraite mining method and the technical parameters of mining technology for slowly inclined large and thick ore body are also made

    以新橋硫鐵體西翼緩傾斜厚大體的開為實例,對生產中應用的水平分層充填和分段嗣後一次充填進行分析比較,提出的優化建議,探討緩傾斜厚大體合適的工藝技術參數。
  3. Application of medium - length hole sublevel open stoping to the mining of thick part of high grade complex orebody

    中深孔分段空場采礦法在高品位復雜難段的應用
  4. Study and application of explosive transportation sublevel open stoping in tongshan copper mine

    爆力運搬分段空場采礦法在銅山銅的研究與應用
  5. Advance in chinas underground mining methods is reviewed, caving mining, open - stope mining and stoping - filling mining that reflect chinas underground mining technological level are summed up and the developmental trend of chinas underground mining methods is forcasted

    回顧了建國50年來我國地下的進展,概括總結了體現我國地下技術水平的崩落空場采礦法和充填,展望了我國地下的發展趨勢。
  6. Application of combined cut to sublevel open - stope in guabang mine of daye iron - mine

    聯合拉槽在大冶鐵鐵門坎南區分段中的應用
  7. Rock mechanics analysis of structural parameters of stope using back - filling method

    階段嗣後充填結構參數的巖石力學分析
  8. Application of the method of sublevel open stope mining followed by filling at xinqao pyrite mine

    分段嗣後一次充填在新橋硫鐵的應用
  9. A tentative plan for the improvement of sublevel open stoping with subsequent backfilling at tongkeng tin mine

    改進銅坑錫分段嗣後充填的設想
  10. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明區的具體位置,在此基礎上對地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下區勘察及有關穩定性研究方的基礎上,以山西大寧煤鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對區有關人員的探訪,首先對主要開層的間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  11. Application of natral alternative electric field to explore accumulated water in goaf

    天然交變電在王村測試積水的應用
  12. Application of natural alternate electric field method in measurement of gob water accumulation in wangcun mine