站灘 的英文怎麼說

中文拼音 [zhàntān]
站灘 英文
zhantan
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 名詞1. (岸邊) beach; sands 2. (江河中水淺多石而水流湍急處) rapids; shoal
  1. It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months

    從2001年10月底開始施工準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理工期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月工期。
  2. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電位於西雅礱江的三至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  3. Design of surge chamber in mianhuatan hydropower station

    棉花水電調壓室設計
  4. Design flood analysis of goupitan hydropower station

    構皮水電設計洪水分析
  5. Black point is a viable option for clps lng terminal

    為中電興建液化天然氣接收的可行選址
  6. Design of underground buried penstock of longtan hydropower station

    水電地下埋藏式壓力鋼管設計
  7. The gold sand chinese restaurant and the tulip caf on 1st floor, haian banquet hall and deluxe banquet boxes on the 3rd floor as well as gold coast porterhouse of fin abalone on the 4th floor will give you a gourmet xperience

    一樓金沙中餐廳鬱金香西餐廳二樓陽光驛茶藝吧三樓海岸宴會廳及豪華宴會包房也是您大塊朵頤的好去處。
  8. Type selection of tailrace surge chamber of longtan hydropower station

    水電尾水調壓室形式選擇
  9. Design of drainage system for tailrace surge chamber and use of high strength pervious hose at ertan hydropower station

    水電尾水調壓室排水系統設計及高強透水軟管的應用
  10. Design of water inlet structure in mianhuatan hydropower station

    棉花水電尾水岔管設計
  11. Design of water inlet stucture in mianhuatan hydropower station

    棉花水電進水口結構設計
  12. Today, the hexi corridor is a must on the silk road tour as tourists heading westward may enjoy a full view of the beautiful scenery and have glimpses of the ancient civilization, the beacon towers of the great wall on the gobi, posts on the silk road and sheep flocks in the oases and at the foot of snow - capped mountains

    如今,沿絲路旅行必走河西走廊。一路西行,可飽覽沿途風光,領略絲路文化,雪山腳下,綠洲之中,羊群點點,車行緩緩,戈壁上依稀可見的長城烽燧絲路驛,仍可見幾分昔日的氣勢。
  13. " our major concerns on the eia report include inadequate information regarding the future gas supply, the conflicts between the objectives of marine parks and an lng terminal, a lack of real commitment in protecting chinese white dolphin and other marine species and down playing of the black point option " said clarus chu, marine conservation officer, wwf hong kong

    本會海洋環境保護主任朱炳盛表示:我們對環評報告特別關注的部份包括:有關未來天然氣供應的資料不足海岸公園與天然氣接收並存的可能性,中電對保護中華白海豚和其他海洋生物欠缺真正的承擔,以及對鼓選址欠缺公平的比較。
  14. Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station

    構皮水電壩基無蓋重固結灌漿試驗工藝
  15. Cuntan station of the yangtze river annual runoff forecasting with set pair analysis method

    集對分析法在長江寸年徑流預測中的應用
  16. Flood prevention benefits demostration of longtan hydropower plant

    水電防洪效益論證
  17. Design of diversion works of mianhuatan hydropower station

    棉花水電施工導流設計
  18. Study and analysis on the electric power market and the utilization of electric power and energy output of longtan hydropower station

    水電電力市場及電力電量消納研究
  19. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河、高村、孫口、艾山、利津各河段沙峰滯后時間與上洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各沙峰傳播時間的準確預報提供依據。
  20. Lausanne, 20 april 2007 - we are pleased to inform you that the 2007 beach volleyball handbook is now available on the fivb web site, while the hard copy version has been sent out on the first week of april to all the parties involved in the growth of the sport, as per the world council decision

    2007年4月20日洛桑? ?我們高興的通知您, 2007沙排球手冊業已在國際排聯的網正式公布;同時,按照國際委員會的決定, 2007沙排球手冊的硬拷貝版本已經在4月份的第一個星期發送到所有成員組織,包括這項運動增加的新成員組織。
分享友人