竣工時間 的英文怎麼說

中文拼音 [jùngōngshíjiān]
竣工時間 英文
time for completion
  • : 動詞(完畢) complete; finish
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 竣工 : (of a project) be completed
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. Basis " orders of sell of access of land of shenzhen special economic zone " the seventeenth regulation, contract of sell one ' s own things should have the following and main provision : ( one ) the full name of bilateral party or name, address ; ( 2 ) a ground date of access of land of sell one ' s own things, area ; ( 3 ) land is used year period reach case stop time ; ( 4 ) the amount of gold of land access sell one ' s own things, money is planted, pay kind and time ; ( 5 ) the time of consign land ; ( 6 ) point of program, municipal design ; ( 7 ) project complete is referred check and accept time ; ( 8 ) municipal facilities form a complete set builds obligation ; ( 9 ) land of use photograph adjacent and viatic limitation ; ( 10 ) the project that builds accessary, add establishment and obligation ; ( 11 ) responsibility of breach of contract ; ( 12 ) party thinks necessary other item

    根據《深圳經濟特區土地使用權出讓條例》第十七條的規定,出讓合同應具備以下主要條款: (一)雙方當事人的姓名或者名稱、地址; (二)出讓土地使用權的宗地號、面積; (三)土地使用年期及起止; (四)土地使用權出讓金的數額、幣種、交付方式及; (五)交付土地的; (六)規劃、市政設計要點; (七)項目提交驗收; (八)市政設施配套建設義務; (九)使用相鄰土地和道路的限制; (十)建設附屬、附加設施的項目及義務; (十一)違約責任; (十二)當事人認為必要的其他條款。
  2. Commodity house opens to booking need to have the following requirement : ( one ) open to booking a person to already obtained estate to develop intelligence letter, business charter ; ( 2 ) concern gold of sell one ' s own things of access of formulary consign land according to land management department, already obtained land access letter ; ( 3 ) licence of program of hold construction project and permit of construction project construction, already dealt with construction project quality and safety to control procedures ; ( 4 ) schedule of affirmatory already construction and complete consign use time ; ( 5 ) 7 achieve main body project below to seal a top ; 7 with what go up, the 2 / 3 above number of plies that main body project must build engineering budget to invest amount ; ( 6 ) already opened commodity house to open to booking a special account in project seat commercial bank ; ( 7 ) the other condition that law, code sets

    商品房預售需具備以下條件: (一)預售人已取得房地產開發資質證書、營業執照; (二)按照土地治理部門有關規定交付土地使用權出讓金,已取得土地使用權證書; (三)持有建設程規劃許可證和建設程施許可證,並已辦理建設程質量和安全監督手續; (四)已確定施進度和交付使用; (五)七層以下的達到主體程封頂;七層以上的,主體程須建到程預算投資總額的三分之二以上層數; (六)已在項目所在地商業銀行開設商品房預售款專用賬戶; (七)法律、法規規定的其他條件。
  3. However, the critical path of the project hinges mainly on the delivery of the equipment and engineering contracts where the lead time is usually longer than the construction schedule. with equipment and engineering contracts committed much earlier, the group does not expect any major deviation in the overall project commissioning timeline

    但設備和程合約的付運是項目進度最關鍵的部份,付運期往往比施期更長,而集團已預早簽訂了設備和程的合約,因此整個項目在進度上最終的竣工時間跟原有計劃應不會有太大的差距。
  4. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」地層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行鉆孔竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石鉆頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石鉆頭和深基坑支護方案綜合評價中的應用。
  5. 15 " time for completion " means the time for completing the execution of and passing the tests on completion of the works or any section or part thereof as stated in the contract calculated from the commencement date

    15竣工時間是指合同規定從程開日期算起到程或其任何部分或區段施結束並且通過檢驗的
  6. Its character includes timing, preceding, reliability. deformation monitoring plays an important role in measuring works and science research of engineering deformation. whether building or working of engineering deformation, it can ensure safe by finding dangerous in engineering deformation

    程建築物的興建中,從程施開始到,以及建成后整個程的運營期都要不斷的對程建築物進行監測,以便掌握程建築物變形的情況,及發現問題,保證程建築物的安全。
  7. Narrate the progress of the project ( such as construction date, finish date, and the project approved situation

    項目進展情況描述(開竣工時間及項目的批準情況等) 。
  8. If the completion time is actually similar, the short - term advantage of building the lng terminal at soko is greatly diminished

    若兩者的竣工時間相約,在大鴉洲興建液化天然氣接收站的短期優勢隨即消失。
  9. The concentration of air pollutants of decorated offices were significantly higher than the control group in one year after decoration ( p < 0. 05 )

    隨著竣工時間的延長,甲醛、氨、苯的濃度逐漸下降,大約在1年後達到標準。
  10. The concentration of radon in ornament and control group was lower than the standard and had nothing to do with completed time

    影響污染物濃度的主要因素為竣工時間、油漆、塗料、復合地板、化纖地毯、人造板用品、增白劑。
  11. The third stage of the project is under preparation and it is estimated that the project will be completed at the end of december, 2004

    二期程全面啟動,樓盤旺銷勢頭不減。三期程正在進行開前準備,預計項目竣工時間為2004年12月底。
  12. 16 " time for completion " means the time for completing the subcontract works as stated in the appendix ( or as extended under sub - clause 7. 3 ), calculated from the commencement date

    竣工時間"指附錄所述的完成分包程的(或根據副條款7 . 3延期) ,從開日期開始計算。
  13. Of the reasons for not yet implementing the nlh construction project, together with a detailed list of the relevant work performed in the past six years by the government departments concerned, as well as the latest estimated project completion date

    (一)興建北大嶼山醫院程至今仍未落實的原因,請詳細列出各有關的政府部門在過去六年曾進行的相關作,以及該項程的最新預計竣工時間
  14. A contract for survey or design includes terms such as the time limit for submission of the relevant basic information and documents ( including budget estimate ), the quality requirements, fees, and other conditions of cooperation, etc

    第二百七十五條施合同的內容包括程范圍、建設期、中程的開竣工時間程質量、程造價、技術資料交付、材料和設備供應責任、撥款和結算、驗收、質量保修范圍和質量保證期、雙方相互協作等條款。
  15. Methods according to the completed time, ornament group ( 150 offices ) was divided into 5 groups ( 2 month group, 2 ~ 4 month group, 5 ~ 8 month group, 9 ~ 11 month group, 12 ~ 18 month group ) end concentiation of air pollutants in these offices was determined. 50 offices after decoration over 60 months were regarded as control group and the concentration of indoor air pollutants was determined

    方法根據裝修竣工時間,裝修組選擇2個月以內、 2 ~ 4月、 5 ~ 8月、 9 ~ 11月、 12 ~ 18月的辦公室共150,對照組選擇裝修5年以上的辦公室50,對空氣中甲醛、氨、苯、氧污染物濃度進行測定,並對辦公室裝修材料進行調查。
  16. The data captured in field tests and observations both prove that crossrange prestressing can effectively reduce roadbed settlement, shorten the roadbed compression and stabilization period, and increase the capacity of roadbed

    通過試驗路段的試驗以及后一段的定期觀測,表明側向施加的預應力能減少路堤總沉降,縮短后沉降穩定期,提高路堤的承載力。
  17. Completion of the building work is taking longer than expected

    建築程的比預計要長。
  18. 3 " time for completion " means the time for completing the works or a section ( as the case may be ) under sub - clause 8. 2 [ time for completion ], as stated in the appendix to tender ( with any extension under sub clause 8. 4 - [ extension of time for completion ] ), calculated from the commencement date

    3 「竣工時間」指在投標函附錄中說明的,按照第8 . 2款竣工時間的規定,由開日期算起到程或某一區段(視情況而定)完的日期(包括按照第8 . 4款竣工時間的延長決定的任何延期) 。
  19. Phase iii and phase iv, the last two phases, will provide a total of 39, 000 sq m of office space and be ready by early and end of 2004 respectively

    數碼港的最後兩期(即第三及四期)將分別於2004年初及2004年底,屆將可提供39 , 000平方米的辦公室空
  20. The tmsb is proposed to be dual 2 lane and the completion date is subject to the timing of the commissioning of the ldyb and the future land use planning in the proximity

    屯門南繞道擬建為雙程雙線行車道,日期要視乎伶仃洋大橋的動及附近地區的未來土地用途規劃而定。
分享友人