竣工決算 的英文怎麼說

中文拼音 [jùngōngjuésuàn]
竣工決算 英文
budget needed for the completion of projects
  • : 動詞(完畢) complete; finish
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (作出主張; 決定) decide; determine 2 (執行死刑; 殺死) execute a person 3 (裂開; 斷開...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 竣工 : (of a project) be completed
  1. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品價格與程造價、程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚程造價的構成和建築安裝程費用的構成以及價格與價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計依據和構成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的施圖預方法與招標投標之間存在悖論,程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  2. How to deal with the final accounts of completion for construction projects

    淺析建設項目竣工決算審計與建設審核的區別
  3. The control of the engineering costs in college capital construction projects depends largely on the control and supervision of such factors as decision - making, bidding at design stage, supervising at construction stage and settlement after the construction completion

    摘要高校基建程式控制製造價,要做好策、設計階段程招投標、施過程管理、等幾個重要環節的控制和管理。
  4. Brief discussion on final accounts and audit after the completion of flood control projects

    對水利基本建設項目竣工決算有關問題的探析
  5. The preparing method of the implementing scheme for completes and final accounts of the capital projects of water conservancy

    水利基本建設項目竣工決算審計實施方案的編制方法
  6. Construction cost consultation ; editing and auditing of financial projects ; construction auditing ; wholly evaluation of assets ; estate appraisal

    程造價咨詢與管理竣工決算的編制與審核,程審計,企業資產的整體評估與房地產估價。
  7. Interest of loan and other related expenses for acquiring fixed assets, and the exchange difference from conversion of foreign currency loan, if incurred before the assets having been put into operation or after been put into operation but before the final account for completed project is made, shall be accounted as fixed assets value ; if incurred after that, shall be accounted into current profit or loss

    在固定資產尚未交付使用或者已投入使用但尚未辦理竣工決算之前發生的固定資產的借款利息和有關費用,以及外幣借款的匯兌差額,應當計入固定資產價值;在此之後發生的借款利息和有關費用及外幣借款的匯兌差額,應當計入當期損益。
  8. Interest of loan and other related expenses for acquiring fixed assets, and the exchange difference from conversion of foreign currency loan, if incurred before the assets not having been put into operation or after been put into operation but before the final account for completed project is made, shall be accounted as fixed assets value

    在固定資產尚為交付使用或已投入使用,但尚未辦理竣工決算之前發生的固定資產的借款利息和相關費用,以及外幣借款的匯兌差額,應當計入當前損益。
  9. The thesis takes apart the relation of the construction project ' s benefit and venture assessment. it sums up the content and process of the final accounting of a construction project completion, and bring forward some good advice on the construction company finance management, which take on important significance in the practice operation on the construction company finance

    本文重點說明了程項目資本金結構的確定方法和原則;剖析了程項目經濟效益和風險控制的關系,詳細研究了項目風險評價的原則和辦法;總結了程項目竣工決算的程序和內容,對建設單位財務管理提出了一些有益的探索和建議。這對建設單位財務人員進行具體操作具有重要的指導意義。
  10. The author designed, made, processed and tested to the plexiglass model and the bridge. then author calculated and analyzed the results, as a result of the computer programs bsas, sap, qjx and nastran. the author researched the force characteristics and structural behavior of large - span prestressed concrete bridges with continuous rigid frame structure, used the advanced theory and technology, materials, arts and crafts to resolve the practical matters in design and construction, to optimize structure, and to provide credible technical data for the design and construction and maintenance of bridges

    本文以吉林省九站松花江特大橋為研究對象,通過有機玻璃模型的設計製作及加和試驗,以及對已通車的實橋荷載試驗,利用計機程序bsas 、 sap 、 qjx及nastran等程序進行理論計和綜合對比分析,探討大跨徑預應力砼連續剛構橋的力學特點和使用性能,運用先進的理論、技術、材料、藝等來解設計和施中存在的實際問題,優化結構,並為橋梁的設計、施及使用維護等提供可靠的技術資料。
  11. Compilation rules of final account for completion of water capital construction project

    水利基本建設項目.財務編制規程
  12. Discussions on issues of final accounts of basic water infrastructures

    公路程項目財務中有關問題探討
  13. 3 " time for completion " means the time for completing the works or a section ( as the case may be ) under sub - clause 8. 2 [ time for completion ], as stated in the appendix to tender ( with any extension under sub clause 8. 4 - [ extension of time for completion ] ), calculated from the commencement date

    3 「時間」指在投標函附錄中說明的,按照第8 . 2款時間的規定,由開日期起到程或某一區段(視情況而定)完的日期(包括按照第8 . 4款時間的延長定的任何延期) 。
  14. Statement on final financial accounts management of fundamental construction projects in colleges and universities

    高校基本建設項目財務管理
  15. How to deal with the problems relevant to working out final financial accounts after capital construction projects are completed

    基建項目財務編制及有關問題的處理
分享友人