竣工線 的英文怎麼說
中文拼音 [jùngōngxiàn]
竣工線
英文
finished line-
The 343 - km 213 - mile andaman trunk road, completed in 1989, was designed as an economic lifeline to link the island chain
長約343公里213英里的安達曼幹道於1989年竣工。它被設計成連接安達曼列島的經濟交通線。The 500 - kilovolt electricity transmission line , extending from fangzheng, mudanjiang, dunhua to baojia, as part of the project of “ electricity transmission from north to south ” of the province , has been completed and will be put into operation in succession
近日,黑龍江「北電南送」 500千伏方正牡丹江敦化包家輸變電工程的線路架設全部竣工,並即將陸續投入運營。A climbing lane between nam wai and clear water bay road in the kowloon - bound direction was constructed in july 1992 and a substantial improvement to the junction of hiram s highway clear water bay road was completed in may 2000
一條介乎南圍與清水灣道之間往九方向的上坡慢線已於一九九二年七月建成。二零零零年五月,西貢公路清水灣道交界的改善工程竣工。Ring road no. 8 was the first ring road to be completed in 21 years since the completion of ring road no. 7 kannana dori in 1985
8號環線是自1985年7號環線完成以來間隔了21年後竣工的第一條環路。Last week, construction of the remaining 4 kilometers of ring road no. 8 kanpachi dori was completed, opening the entire stretch of road to traffic
上周, 8號環線剩餘的4公里竣工,使得整條路段得以全線通車。The tolo highway between island house interchange and ma liu shui interchange is being widened to dual four - lane carriageway standard, with the works due to be completed in mid - 2003. in ma on shan, to cope with future growth in traffic demand, the sai sha road section between kam ying road and the junction with trunk road t7 at sha on street is being widened to dual two - lane standard ; work started in august 2002 for completion in 2005
為配合馬鞍山日後交通量的增長,介乎錦英路與日後的t7號主幹道路交界處的一段西沙路,已在二零零二年八月展開擴闊工程,改為雙程雙線行車道,預期工程可在二零零五年竣工。The reconstruction project of huanghai bus painting line completely
黃海客車塗裝線改擴建工程竣工And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties
本系統可以實現對變電站、開關站、配電室、電纜、豎井、溝道及高壓用戶等空間位置、圖形資料(包括一次接線圖、竣工圖、斷面圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。The sheung shui to lok ma chau spur line is due to be finished by 2007
上水至落馬洲的鐵路支線的新建造方案已經擬定,預期二零零七年竣工。The plant brought and air impact molding line from fa co of italy, the output of casting could be 5000t every year and put into production in 1996. it has become the advanced base for producing in 1996
「八五」期間引進義大利國際水平的氣沖造型線,年產精密液壓鑄件5000噸, 1996年竣工投產,成為我國目前水平最高的液壓鑄件生產基地。The plant brought an air impact molding line from fa co of italy, the output of casting could be 5, 000t every year and put into production in 1996. it has become the advanced base for producing hydraulic casting
「八五」期間引進義大利國際水平的氣沖造型線,年產精密液壓鑄件5000噸, 1996年竣工投產,成為我國上前水平最高的液壓鑄件生產基地。The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project
工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。Civil construction of west rail, phase i, is nearing completion, and the east rail extensions are making good progress
西鐵第一期的土木工程已差不多竣工,而東鐵支線工程亦進展良好。The council said that rebuilding the red cow interchange was on schedule for completion by august next, at which point phase one of the m50 upgrade - the busiest, western section of the motorway - will be complete
郡議會說,紅牛出入口的重建預計明年8月份竣工,到時, m50第一階段的升級工作最為繁忙的西段線路也將竣工。The project is being developed on a 24 - hectare site at telegraph bay in the southern district of hong kong island. cyberport is being completed in phases extending through 2004, and when complete will feature 100 000 square metres of intelligent office space
這個項目正於港島南區鋼線灣興建,佔地24公頃。數碼港現正分期落成,於2004年年底竣工后將提供10萬平方米的智慧型辦公室大樓用地。The first phase of the new plant, which will be completed in mid 2006, will engage in the manufacturing of various dosage form products, in pills, powder and capsule
新廠房將設研發及生產線,第一期預計於二零零六年中旬竣工,用以生產丸劑粉劑及膠囊劑等製品。Since nanpu bridge was built in 1991, yangpu bridge, xupu bridge, fengpu bridge, lupu bridge have emerged like rainbows over the hangpu river on after another
「一橋飛架黃浦」的夢想從1991年南浦大橋竣工通車開始,楊浦、徐浦、奉浦、盧浦,一座接著一座,在浦東上空劃出雄渾的弧線。New public toilets were completed in sunny bay on lantau island and the lantau link viewing platform on tsing yi
大嶼山欣澳和青衣青嶼干線觀景臺的新公廁已經竣工。There are three committed railway projects, namely the tseung kwan o extension ( tkol ), west rail ( wr ) and the ma on shan to tai wai link ( mosl ) tsim sha tsui extension ( tst extension ), scheduled for completion in 2002, 2003 and 2004 respectively
已規劃已承諾進行的鐵路項目現有三項已承諾進行的鐵路項目,包括將軍澳支線、西鐵及馬鞍山鐵路尖沙咀支線,預期分別於2002年、 2003年及2004年竣工。This thesis gets forecasting ground settlement of sk3 + 355 section of shenzhen metro da ~ ke running tunnel after it is completed 6 months, also gets forecasting ground settlement of sk3 + 395 section after it is completed 15 months. finally, the model test data are compared with the site measurement data
本論文通過多個模型試驗的研究,得到了深圳地鐵大~科區間里程sk3 + 355斷面在隧道竣工后6個月內地表固結沉降的預測值,也得到了sk3 + 395斷面三孔三線隧道施工引起的沉降和隧道竣工后15個月內地表固結沉降的預測值。分享友人