第水庫 的英文怎麼說
中文拼音 [dìshuǐkù]
第水庫
英文
balancing reservoir-
Article 24 : in any river, lake, reservoir and canal, the following activities are prohibited : discarding or piling objects impedimental to flood passage and navigation ; planting trees and growing crops of long stalk variety impedimental to flood passage
第二十四條在江河、湖泊、水庫、渠道內,不得棄置、堆放阻礙行洪、航運的物體,不得種植阻礙行洪的林木和高桿作物。Undergraduate sports city is located in the center that the first radiate encircles shenzhen urban district, distance downtown makes an appointment with 15 kilometers, circumjacent area makes a road net not only concentrated, have 4 quick ways and 1 is passed in the orbit traffic line that build, more continuous and ceaseless immortal mountain, timbal mountain makes a natural green protective screen, the dragon mouth reservoir of overflow of green jade heave brings infinite lease of life
大學生體育城地處深圳市區第一輻射圈的中心,距離市中心區約15公里,周邊區域不僅交通道路網密集,有4條快速路和1條在建的軌道交通線通過,更有連綿不斷的神仙嶺、銅鼓嶺構成一道天然的綠色屏障,碧波蕩漾的龍口水庫帶來無限的生氣。Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control
第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水閘、護岸、抽水站、排水渠系等防洪工程和水文、通信設施以及防汛備用的器材、物料等。It divides the main vegetation of the headwater region of huangpu river into 4 categories based on field survey and observation and methods of factor analysis and systematic cluster analysis and according to the degree of soil and water conservation function : deciduous trees and shrubs are category 1 which shows very strong soil and water conservation function ; tea plantation, grasslands and pine trees are category 2 which has stronger function ; the category 3 is moso bamboos and broadleaved evergreen trees which have stronger permeability and erodibility, but the permeable performance is not outstanding, the capacity of soil moisture storage common and soil and water conservation function moderate and ; the category 4 is uncovered land where the soil and water conservation function is very weak and its permeability, erodibility, erosive resistance and soil moisture storage capacity are all notably smaller than that of the other lands
摘要在野外調查、實測的基礎上,採用因子分析、系統聚類分析的方法,根據土壤層水土保持功能的強弱,將黃浦江源區主要植被類型分為4類:落闊林、灌木林為第一類,表現出很強的水土保持功能;茶園、草地、松林為第二類,土壤水土保持功能較強;毛竹林、常綠闊葉林表現出較強的抗蝕性和抗沖性,但滲透性能並不突出,土壤貯水能力也一般,水土保持功能中等,為第三類;裸露地水土保持性能很差,單獨作為第四類,其滲透性、抗蝕性、抗沖性、土壤水庫容都顯著小於其他各樣地。Dam plants - part 14 : pumped - storage reservoirs
蓄水設備.第14部分:抽水蓄能水庫Article 33 it is forbidden to pile or deposit solid wastes and other pollutants on beaches and bank slopes below the highest water level of rivers, lakes, canals, irrigation channels and reservoirs
第三十三條禁止在江河、湖泊、運河、渠道、水庫最高水位線以下的灘地和岸坡堆放、存貯固體廢棄物和其他污染物。Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered
黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。The second part used the river geography data get from gis into xiangshan reservoir dam - break simulation system
第二部分將gis所得到的河道地理數據用於象山水庫潰壩模擬計算。Article 44 during the flood reason, the use of reservoirs, sluices, dams and other water engineering structures must be subjected to the command, control and supervision of the relevant flood control headquarters
第四十四條在汛期,水庫、閘壩和其他水工程設施的運用,必須服從有關的防汛指揮機構的調度指揮和監督。The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply
第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。Water supplies - combined fresh salt water supply projects - additional trunk transfer facilities to kowloon eastern areas and water supply to anderson road quarries site development - stage 1
供水食水供應-丹桂村食水配水庫第ii階段及元朗至屯門之間增設輸水干管設施Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper
第三,鑒于大壩基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大壩施工填築竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大壩安全設計及防滲墻墻體材料的選擇提供了理論依據。The first part mainly introduces the gis concept and contents of gis, the comparison between the related software and gis, the present condition and development trend of gis etc, then introduced how to use the gis technique in a specific way such as using the method of " the half - automatic to follow " to turn the map into arithmetic figure, using the method of " the automatic calculates " gets the length of the line and area of field etc, at last got the length and width of every cross section of the fabiela river which is located downstream of xiangshan mountain. this method is superior and time - saving comparing with collecting data on the spot, having important and actual application worth
第一部分主要介紹了gis的概念和研究內容, gis與相關軟體的比較以及gis的現狀、發展趨勢、當前gis研究的熱點等等,然後具體介紹了用gis的相關技術如:用「半自動跟蹤」方法對地圖進行數字化,用「自動量算」方法得到線對象的長度、面對象的面積等,最終完成了象山水庫下游法別拉河河道地形數據資料的提取工作,這種方法與人工實地採集工作相比,有較強的優越性和重要的實際應用價值。Guanting reservoir water source quality in winter resembles normal sewage wastewater, so the experiment provides the first - hand material of using baf to treat low - temperature sewage wastewater in the cold area
由於官廳水庫水源水在冬季時的水質與一般城市污水相似,該試驗也填補了兩級曝氣生物濾池在低溫下處理城市污水的空白,並為其用於寒冷地區城市污水的處理提供了第一手資料。Article 9 relevant departments under the state council and local people ' s governments at various levels shall, when developing, utilizing, regulating and allocating water resources, make integrated plans for maintaining proper river flows, proper water levels of lakes, reservoirs and proper ground water tables, in order to retain the natural purification capacity of water bodies
第九條國務院有關部門和地方各級人民政府在開發、利用和調節、調度水資源的時候,應當統籌兼顧,維護江河的合理流量和湖泊、水庫以及地下水體的合理水位,維護水體的自然凈化能力。The 15th aaa that was at the chosin was wiped out with a battalion of the 31st inf regt and the 1st battalion, 32nd inf regt
在長津水庫,第15高炮營與第31步兵團的1個營、第32步兵團1營一起被全殲了。At the reservoir, the choppy water initially deterred the wary goslings from taking their first dip
在水庫邊上,機警的小野鵝最初看到波浪起伏的水面時誰也不敢嘗試它們的第一次下水。Speaking at the opening ceremony of the new waterworks, the permanent secretary for the environment, transport and works ( works ), mr y. c. lo, said today ( may 12 ) that the government had also planned to feed hkd with the third type of water supply
環境運輸及工務局常任秘書長(工務)盧耀楨今日(五月十二日)出席欣澳食水配水庫的揭幕典禮致辭時表示,政府已計劃為迪士尼樂園供應第三類用水。Pwsc endorsed the upgrading of part of 660cl, entitled " infrastructure for penny s bay development, package 1 - yam o tuk fresh water service reservoir and associated works ", to category a at an estimated cost of $ 165 million in mod prices
工務小組委員會通過把660cl號工程計劃的一部分提升為甲級工程,稱為"竹篙灣發展的第1組基礎設施-陰澳篤食水配水庫及相關工程" ;按付款當日價格計算,估計費用為1億6 , 500萬元。This paper analyses the reasons of the problems in the resettlement of geheyan of qing river, and suggests resolving them to carry out resettlement by project legal person system, the marketization compensation mechanism of resettlement, the third party supervision mechanism, late - stage support policy, legislation of resettlement due to water projects, reform of resettlement departments
現分析了清江隔河巖移民工作困擾產生的原因,並提出了必須貫徹項目法人制的水利工程移民、建立市場化的移民補償機制、引入第三方監理機制、盡快出臺和落實後期扶持政策、加快水庫移民立法工作、加快移民機構改革等解決項目法人制水利工程移民問題困擾的對策建議。分享友人