筋輔 的英文怎麼說

中文拼音 [jīn]
筋輔 英文
kinsuke
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : Ⅰ動詞(輔助) assist; complement; help Ⅱ形容詞(輔助) subsidiary Ⅲ名詞1 (車輪外旁增縛夾轂的兩條...
  1. Specification for ancullary components for masonry - part 3 : bed joint reinforcement of steel meshwork

    圬工助元件規范.第3部分:鋼網結構工作用底層接縫加
  2. Abstract : it presents the law of “ the reverse is positive ” on how to evaluate the unknown force of statically determinate structure, the movement law of force vector for drawing the axial force diagram and shear diagram. and expounds the simple and convenient method of drawing the moment diagram according to the rubber band deformation, and the auxiliary teaching software corresponding to the above - mentioned methods. the methods are believed to save class hour and gain a better effect on teaching

    文摘:闡述了求靜定結構未知力的反為正規律;繪制軸力圖、剪力圖的力矢移動法則;按照橡皮變形繪彎矩圖的簡便作法以及與上述方法對應的計算機助教學軟體.相信這樣作,對教學可起到省課時、效果好的作用
  3. Fiber reinforced plastic rebar ( frp ) is a new composite, which is composed of fiber acting as reinforced material, synthetic resin acting as matrix, and some adequate auxiliaries, and is formed through a pultrusion process and necessary surface process. it has a high strength to weight ratio, excellent non - corrosive characteristic, fatigue - resistant characteristic, strong designability and magnetic neutrality, so it can be used in the applications with special performance requirements or where reinforcing bars are subjected to severe chemical attack

    纖維增強塑料是以纖維為增強材料,以合成樹脂為基體材料,並摻入適量助劑,經拉擠成型技術和必要的表面處理所形成的一種新型復合材料,具有比強度高、耐腐蝕性能好、可設計性強、抗疲勞性能好、耐電磁等獨特優點。
  4. A significantly better 5 - year disease - free survival rate was seen in patients undergoing radical hysterectomy compared with extrafascial hysterectomy ( 94 % compared with 76 %, p =. 05 ). adjuvant radiation did not lead to improved survival

    行根治性子宮切除術的患者與膜外子宮切除的患者相比較, 5年無瘤生存率具有明顯的改善。 ( 94 %相比76 % , p = . 05 ) 。助治療不能改善生存率。
  5. Methods of test for ancillary components for masonry - part 8 : determination of load capacity and load - deflection characteristics of joist hangers

    圬工助成份試驗方法.第8部分:墻吊架處負載偏轉特性和負載能力測定
  6. The company ' s main products include : ordinary - type, forward - and - backforward - thread typeandcalibre - changed type, three series and 50 - odd varieties of steel straight thread connecting sleeve piece and steel straight thread screw rolling machine, screw rolling wheel, cutting tool, reinforced thread head special gauge, moment spanner ect., auxiliary tools which are used in construction

    公司主要產品有標準型、正反絲型、變徑型三大系列五十多個品種的建築用鋼直螺紋連接套筒和鋼直螺紋(剝肋)滾絲機及滾絲輪、切削刀具、鋼絲頭專用量規、力矩扳手等具。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼,分底腹板和頂板分別綁扎並吊裝鋼骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. Although model examination is the main assistant means of theory study to reinforced concrete structures, it can relatively reflect the actual force state of the reinforced concrete structures or components, but due to the characteristics of the reinforced concrete structures, model examination has disadvantages : the workload of model facture and examination is heavy, the result of examination is discrete, expense of examination is expensive, it requires much manpower 、 many material resources 、 many equipments and many fields

    雖然模型試驗是助鋼混凝土結構理論研究的主要手段,它能夠比較真實的反映鋼混凝土結構或構件的受力情況,但模型試驗由於鋼混凝土結構的特點:模型製作和試驗工作量大,試驗結果的離散性大,試驗費用高,需要較多的人力、物力、設備和場地。
  9. Then the shear and torsion strength of the beams and the number of stirrups were checked. the program for this system is pragmatic because it includes some cases that are always met in practice

    本文所編制的預應力混凝土井字梁計算機助設計系統考慮了實際工程中常遇到的邊梁扭矩較大、預應力相碰等問題,因此具有實用性。
  10. Concrete pipes and ancillary concrete products - specification for unreinforced and reinforced concrete inspection chambers

    預制混凝土管管配件和助製品.未加和加的混凝土檢查室的規范對bs1917 : 2002規范的補充
  11. Concrete pipes and ancillary concrete products - specification for unreinforced and reinforced concrete manholes and soakaways complementary to bs en 1917 : 2002

    預制混凝土管管配件和助製品.未加和加混凝土人孔井及滲水坑規范對bs1917 : 2002規范的補充
  12. Bs en 1916 : 2002 concrete pipes and ancillary concrete products - specification for unreinforced and reinforced concrete pipes including jacking pipes and fittings with flexible joints comnplementary to bsen 1916 : 2002

    預制混凝土管管配件和助製品.具有軟接頭的非加混凝土管
  13. The program includes calculation module of internal force, checking calculation module of stability and intensity, bar arrangement module and output module of cad construction drawings. it is capable of computer aided designing and detailed analyzing and can be utilized in the practical project

    程序主要包括內力計算分析模塊、地基穩定強度驗算模塊、配計算模塊和cad施工圖繪制模塊,具備良好的計算機助設計功能和完善的分析功能,具有一定的工程設計實用價值。
  14. Use of ice, along with gentle stretching, will numb the area and cause an increase in circulation once the ice is removed

    使用冰塊,再以輕柔地按摩舒展抽部位,將可使抽部位麻木,當冰塊移除后,就會更促進血液的循環。
  15. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立井井塔為現澆鋼混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  16. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立井井塔為現澆鋼混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  17. Back strap elastic slider and double hook do not match the width of elastic. it is impossible to slide and adjust

    后橡帶的扣合件(這個我翻譯不出來,應該是扣合用的料)和橡的寬度不是很吻合,使橡不能移動和調解
  18. Considering the increase of the shell ’ s thickness will induce the increase of the quality and the localization difficulty, the ring rib reinforcement can be installed on the shell to solve the problem of distortion and quality. the thickness and the rib reinforcement ’ s

    考慮到組件的助支撐安裝在殼體上,增大殼體厚度就會增加其質量,從而增大組件安裝定位的難度,故在殼體上安裝環形板來解決變形和質量問題。
分享友人