算工程 的英文怎麼說

中文拼音 [suàngōngchéng]
算工程 英文
computer engineering
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施藝,並指出了橋梁施控制的重要性之後,簡要的介紹了概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施控制與監測作的前期實驗作和施況標高、各節段支模標高、澆注混凝土后的標高的結構計和其理論計結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    結果表明,如果能使錦屏引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  3. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方的計格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  4. Because of no limitation to task granularity, ppa is especially suitable for scheduling fine granularity tasks ( also suitable for coarse and medium tasks of course ), consequently helpful theoretically and practically for studying task schedule algorithm for rtdcs. according to the principle of fault - tolerant scheduling, combined with characteristics of tft in rtdcs, the paper puts forward the scheduling model of tft, corresponding implementation mechanism and the dynamic fault - tolerant scheduling algorithm ( namely ftpb ) and analyzes its complexity, with experimental data and contrast table compared with other analogic algorithm

    結合實時分佈系統中容錯任務的特點,根據容錯調度原理,給出了容錯任務的調度模型、實現機制及動態容錯調度演法ftpb ,並對演法進行了復雜哈爾濱大學博士學位論文; ; ; ; ;二; ; ; ;奮石石奮; ;性分析,給出了演法實驗數據及與其它同類演法的比較結果。
  5. In consideration of studying island coast hydrodynamic factors is in order to build breakwater engineering, design waves, astronomic - tide and storm - tide which increases water level are computed to offer design parameters, discuss and analyze the influence of engineering safety aroused by those factors

    考慮到研究海島周圍海岸動力因素的目的是為了建設海島,還進行了設計波浪以及天文潮、風暴潮增水的計,分析了這些因素對安全性的影響。
  6. In the dissertation ' s chapter 3 to chapter 5, the mechanical and physical performances of the engineering plastics are analyzed, the failure mode and the designing computing methods of engineering plastics member suffering the static load, dynamic load, impact load, pulse load, are studied. by the practice application and ball firing experiment of the engineering plastics key piece in the weapons, the precious experiences, for engineering plastics application and confirmation of the material performances guideline in the weapons, are obtained

    論文的第三章至第五章,分析了塑料物理機械性能,研究了受靜載荷、動載荷、沖擊載荷及脈沖載荷下塑料構件的失效模式和設計計方法,通過塑料在槍械關鍵受力結構件上的實際應用和實彈射擊試驗,取得了寶貴的經驗,為高性能塑料在槍械上的應用和材料性能指標的確定奠定了基礎。
  7. It preestablish a parallel design pattern for each parallel project based on master / slave architecture, and the communication between computers is transparent to programmers. in another words, when programmers are developing parallel programs, they do n ' t need to learn any complicated primitives and write any codes related with communication between parallel tasks. just only set some parameters in the visual interfaces that provided by platform, and the codes will be generated by our system automatically and inserted to the fittest place in the files

    系統為每一個并行計算工程設定了一個基於master slave架構的并行編模型,並且使得各結點機之間的通信對于開發人員透明化,也就是說,開發人員在開發并行序時,無需了解紛繁復雜的通信原語,不涉及任務之間通信的代碼,只需要在并行序開發平臺提供的可視化界面上對數據的傳送進行設定,通信代碼將自動生成並插入到序合適的地方。
  8. Asti is specifically focused on serving banking, pharmaceutical and manufacturing environment with much emphasis on environmental management as a key to our business, not forgetting the importance of budget and schedule to the success of a project

    公司的最終目標是建立一個能配合城市服務網路,包括金融業、制藥業和製造業,並符合環保、預進度管理要求的服務體系。
  9. Build - transfer - operate - private proponent finances and constructs facility on a turn - key basis assumes cost overrun, delay, specified performance risk

    -私營提議人在準備將其移交的基礎上籌措資金並建造該設施(包括承擔成本高出預延誤及質量保證等風險)
  10. Make ingenious use of compound interest formulae to calculate net present value of engineering

    巧用復利公式計算工程的凈現值
  11. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的造價,即在決策階段編寫詳細的可行性研究報告和編制投資估;在設計階段優化設計方案,進行合理的技術設計和施圖設計;在實施階段選擇合理的施方案,嚴格控制變更和現場簽證,嚴格審核圖預造價的預採用量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施有關資料,制定嚴密的合同條款。
  12. In past ten few, the target bid price reviewed has amounted to 3. 5 billion rmb, total engineering cost estimation value has amounted to 4. 8 billion rmb with saved fund of about 0. 7 billion rmb

    近十年來已完成編制審核標底35億元、審核概預估算工程金額累計48億元,節約資金7億元左右。
  13. The common methods of realization of visualization in scientific calculation are suggested in this paper, and the calculation example in engineering indicates that the visualization system of hydraulic tunnel section lining design is practical and steady

    本文論述了實現科學計可視化的一般方法,並通過計算工程實例,證明了水隧洞斷面襯砌計可視化系統的實用性和穩定性。
  14. The change of discharge and diversion ratio of the main junction is calculated by the 1 - d model, and the influence of the engineering on the whole pearl river delta networks is analyzed

    同時利用一維數模計算工程后水面線及河網主要節點流量和分流比的變化,從整體的角度分析對整個珠江三角洲流域的影響。
  15. Abstract : a numerical model for wave propagation in water of varying topography and current is proposed, and time - dependent wave mild - slope equation with a dissipation term and corresponding equivalent governing equations are presented. two different expressions of parabolic approximations for the case of the absence of current are also given and analyzed. examples of numerical simulation for wave transformation in large estuarine water areas are provided

    文摘:提出了水深與流場緩變水域波浪傳播數學模型水流中依賴時間變量並考慮能耗的波浪「緩坡方」及其等價的控制方組,分析比較了無水流情況此理論模型與其相應的兩種拋物型近似的差別,提供了長江口波浪變形數值模擬計算工程實例.實例表明,該模型能適應河口三角洲大范圍水域波浪傳播數值計
  16. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需水量計,系統設計流量推、管道水力計投資概,經濟效益分析等功能,建立了常用的數據庫(管材、管件、水泵和電機等)並對其進行管理和維護,可以實現包括管道布置、管徑優化、管材選擇等多種參數選擇在內的多種方案比較、優選。系統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作方便。
  17. Feasibility study on construction project, investment budget calculation, engineering project cost estimation, final account settlement and calculating the cost bottom data for tendering project and project ' s economic evaluation, engineering cost surveillance and control

    建設項目可行性研究、投資估概(預、估)及標底編審、項目經濟評價、造價監控。
  18. Investment estimation for the feasibility of construction project ; budget estimation budget & audit ; base price establishment ; examination and consultation for quoted price ; assessment of real estate

    建設項目可行性研究投資估、預(決)、招標標底編制、審核及投樣報價咨詢;房地產評估。
  19. Northern link to be completed between 2011 and 2016 at an estimated cost of 9 billion 5

    大概於2011年至2016年完成的北環線,預算工程費用為90億元
  20. Sha tin to central link to be completed between 2008 and 2011 at an estimated cost of 31 billion

    大概於2008年至2011年完成的沙田至中環線,預算工程費用為310億元
分享友人