管橋施工 的英文怎麼說
中文拼音 [guǎnqiáoshīgōng]
管橋施工
英文
pipe bridge construction- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 橋 : 名詞1. (橋梁) bridge 2. (姓氏) a surname
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 管橋 : pipe bridge
- 施工 : be in the process of construction; be under construction; build; construction
-
Calculation of the temporary stays in the erection of steel tube arch ribs by suspender method
某鋼管混凝土拱橋拱肋懸索吊裝施工中的扣索計算Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge
系桿拱橋鋼管拱內混凝土的壓注施工工藝研究By emptying the above mentioned theoris and conclusions, this paper introduces detailedly the whole process of the compare and selection of cangzhou city gongrong road canal bridge ' s plan, design calculation and check of structure. the internal force calculation of the bridge adopts the program of plane member system ( bricas ), and it was checked by the program of brcad
本文最後應用上述理論和結論,以大量篇幅詳細介紹了滄州市光榮路運河橋(下承式鋼管混凝土系桿拱橋)從方案比選到結構設計和計算、驗算的全部過程,以及施工中的要點,本橋內力計算採用平面桿系有限元計算程序, (交通部公規院的《橋梁設計綜合計算程序》 ( bricas4 . 0 ) ) ,並採用空間有限元程序( brcad2 . 0 )進行驗算。There has not been a scientific design theory about the jointless bridge whereas it has been conducted successfully for a long time in the u. s. the actual design ways basically depend on the experience and observaration. what is more, the analytical method and the design of the crunodal details are still dealed with on the whole. in fact, it is a very important part to deal with the crunodal structure between the abutment and beam in the design and conduction of the jointless bridge. in addition, the loaded properties of the crunode are the key and difficulty in the study of the jointless bridge. therefor, there are engineering and practical significances of analyzing the crunodal structure and studying its loaded properties
盡管無伸縮縫橋梁在美國已經成功地使用了很長時間,但至今還沒有一個比較科學的設計理論。目前的設計方法基本上依賴于經驗與觀察,還沒有從根本上解決無伸縮縫橋梁有關的分析方法和設計細部構造。應該說,對于無伸縮縫橋梁而言,處理臺與主梁的結點構造是設計和施工中非常重要的部分,結點部分的受力性能是研究無伸縮縫橋梁的重點和難點。This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above
本文介紹了國內外大跨度鋼管混凝土拱橋主拱肋施工的發展和現狀;綜合分析了拱橋施工的機理、技術和設備情況;提出了大跨度拱橋主拱肋施工的完整解決方案,最後通過具體橋梁施工方案的設計分析,說明了本項研究成果的現實參考價值。Construction monitring for steel tube concrete arch bridge
鋼管混凝土系桿拱橋施工監測The half analytic formula is reasoned out, which is applied to the sensitivity analysis on design parameters. through the sensitivity analysis of design parameters in constructing phase of nanpu bridge, the main design parameters are confirmed. based on this, the real value of parameters are identified by least square method, by this token, the error of design parameters can be eliminated in the process of construction control
為了減小鋼管混凝土拱橋施工過程中的施工控制誤差,本文推導出了用於結構設計參數敏感性分析的半解析公式,並對南浦大橋各施工階段的結構參數進行了敏感性分析,從而確定出該橋的主要設計參數,在此基礎上,利用最小二乘法對這些參數進行識別,估計出各參數的真實值,以消除施工控制中結構設計參數誤差。Arch rib is the key point during the process of the long - span concrete - filled steel tube arch bridge construction
主拱肋施工是大跨度鋼管混凝土拱橋施工的關鍵環節。Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good
豐都長江大橋懸索橋採用混凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本橋施工中採用了新開發的鋼管爬升架倒模新工藝,不僅節省了為橋塔施工而設計的橋塔型鋼骨架,而且利用常規的簡易桿件、施工速度快,施工質量好。B47 breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. featuring portability, durability, great efficiency and speed, the breaker can break ferroconcrete, rocks and asphalt. it is ideal machinery for the construction and backout of mines bridges, roads, water pipes and electricity grids
B47破碎機採用美國迦納德?丹佛氣動集團公司成熟技術,以壓縮空氣為動力的破碎工具,能高效完成鋼筋混凝土、巖石、瀝青等的破碎工作,具有輕便耐用,快速高效等特點,是礦山、橋梁、道路、水、電管網施工搶修及拆除的理想工具。Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated
本文以蓮沱特大橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。This paper taking zigui longtanghe bridge in hubei province as a project background, studies about the unified construction technology of tower and buckle frame in erection with cableway used in steel pipe - encased concrete arch bridge constructioa based on the analysis of the construction property of long span steel pipe - encased concrete arch bridge, this paper raises the general scheme and basic structure of unified construction, analyzes the mechanical behavior of unified structure of construction statue, mainly discusses the strength, stiflhess and stability of the unified structure
本文以湖北秭歸龍潭河大橋為工程背景,對大跨徑鋼管混凝土拱橋纜索吊裝塔架扣架一體化施工技術進行了研究。論文以大跨徑鋼管混凝土拱橋施工特點分析為基礎,提出了一體化施工的總體方案與基本結構構造,分析了施工狀態一體化結構的力學行為,主要探討了一體化結構的強度、剛度及穩定性,採用動態監控系統確保了一體化結構在橋梁施工過程中的安全可靠性,從而形成一套系統的纜索吊裝施工新技術,並在實橋工程進行了應用,效果良好。Construction technology for long - span arch bridge of concrete - filled steel tubes
淺談大跨徑鋼管混凝土拱橋施工工藝In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision
為了滿足大跨度鋼管混凝土拱橋施工的安全性與成橋預期的內力狀態和拱肋線形,本文結合工程實例,分別對合理成橋狀態和扣索索長調整的目標函數的確定進行了分析,將一組多變量、多約束的最小化問題無約束化,從而建立起適合於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機最優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。Impression on equipment management of the road and bridge construction units
路橋施工企業的設備管理工作有感Taking nanpu bridge ( fst bridge ) in chun - an county as an instance, many problems on construction control technique for cfst bridge are discussed in this paper, including : the analysis method of simulating construction phase, construction monitoring technology, calculation of stayed - buckle - cable forces, allotting deadweight of pumping liquid concrete, analysis on the inflection of shrinkage and creep of core concrete in steel tube, analysis on the error in construction control, sensitivity analysis of parameters and parameter identification
本文以淳安縣南浦大橋為背景,對鋼管混凝土拱橋施工控制中的結構分析方法、施工監測技術、斜拉扣索索力計算、泵注混凝土自重荷載的分配、鋼管核心混凝土收縮徐變分析、施工控制誤差分析、參數敏感性分析及參數估計等問題展開研究。Stability checking of bearing - bracket in construction of concrete - filled steel pipe arch bridge
鋼管混凝土拱橋施工支架穩定性驗算Based on the control process of construction of concrete - filled steel - tube arch bridge with large span, we describe the design and implemental method of the control system software iabs 2000 which is developed specially for the construction control of concrete - filled steel - tube arch bridge with large span
本文以大跨度鋼管混凝土拱橋的施工控制過程為研究基礎,闡述了專用於鋼管混凝土拱橋施工控制的系統軟體iabs2000的設計方案及實現方法。This paper has studied and set up a supervision and control system based on the backing item of jinzhou yangtze river bridge with main span of 500m, by analyzing the development of construction control of cable - stayed bridges in china and abroad, foreword calculation of 250 work cases of plane bar fem, adoption of advanced equipment and devices, quick analysis of gathered data research of karemen filtering method, least square and gray model gm ( 1, 1 ) into the identification of the real state and precuts and effective manage mechanism
本文以荊州長江公路大橋主跨500米的混凝土斜拉橋施工為應用背景,通過分析目前國內外大跨度混凝土斜拉橋施工控制現狀,結合該橋施工實踐,運用平面桿系有限元計算理論對大橋250個工藝進行正裝計算,採用先進測試設備和儀器,利用計算機快速分析處理技術對現場監測系統收集的數據進行誤差分析,系用卡爾曼濾波法、最小二乘法和灰色理論gm ( 1 , 1 )進行結構真實狀態的識別和後期預測,通過科學高效的監控管理機制的運行和監控實踐,探索並建立了一套適合於大跨度混凝土斜拉橋的施工監測監控體系。Lastly, summarize the methods of cfst ' s construction and expatiate that it is absolute conve nient and possible to use partially cfst arch bridge
在此基礎上,通過對鋼管混凝土拱橋施工方法的介紹,論述了部分灌注鋼管混凝土拱橋在施工中也是完全方便可行的。分享友人