管系布置 的英文怎麼說

中文拼音 [guǎnzhì]
管系布置 英文
pipe arrangement
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 管系 : piping; solenium; solenia tubulature; solenia; line piping; pipe arrangement; piping line; system...
  1. This paper analyzes the fire danger factors for torching system and vent pipe, and addresses the key design matters of deployment, height, discharging capacity and automatic monitoring device of torch as well as the discharging gas concentration, installation position and security device of the vent pipe

    文章分析了火炬統和放空的火災危險因素,並從火炬的、高度、排放能力、自動監控裝以及放空的氣體排放濃度、安裝位、安全裝等方面,重點論述了火炬統和放空的消防安全設計要點。
  2. For solving all these problems, through applying visualization technology of engineer design to the design of oil - feed unit, this paper constructs the entity model of oil - feed unit, establish the three - dimensional standard parts, implement the semi - automated and automated connect, and produce automatically the 2d or 3d part drawings. using this system the designer can observe and evaluate the space model of the unit, discuss the feasibility of space layout and the probable errors, so that the decision can be optimized and the competition of enterprise can be improved greatly

    針對船舶供油單元設計、製造中的上述問題,本統擬將工程設計可視化技術應用於船舶供油單元的設計,構造船舶供油單元的三維實體模型,建立三維標準件庫,實現路的自動、半自動連接,自動生成路的二維和三維零件圖,使得設計人員在設計階段就可觀察、評判單元的空間模型,直觀地探討空間的合理性和存在的問題,從而幫助決策的優化,提高企業競爭力。
  3. In our country, sprinkler systems always adopt ramiform arrangements. because its ' security and reliability is low, it ' s necessary to study on ringed arrangements and hydraulic calculation of the sprinkler systems

    在我國,自動噴水滅火網一直採用枝狀,安全性與可靠性低,曾出現火災發生后自噴統不能有效滅火的現象。
  4. On the basis of the sprinkler systems " ringed arrangements, fem is used to build mathematic model of sprinkler systems. the mathematic model applies to both the ringer arrangements and the ramiform arrangements. vb6. 0 is used to compile caculation program, and a practical engineering use it to caculate

    在自噴統環狀的基礎上,採用有限單元法建立了同時適用與枝狀網和環狀網的自噴統水力計算的數學模型,採用vb6 . 0編寫計算程序,並用該程序對一示例工程進行實際應用。
  5. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、,水冷壁的粘污、結垢,過剩空氣數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  6. This article is to analysis the building fire automatic sprinkling system, which accords the formulate of automatic sprinkling fire system design specification ( gb50084 - 2001 ), uses hydraulic computation and basic formula, on basis of automatic system network configuration, and adopts project programming software visual basics. 0 and microsoft access2002 data base to composite hydraulic computation program of building fire system, and to realize building fire automatic sprinkling system design computerized

    本文對建築消防自動噴水滅火統(以下簡稱:自噴統)的分析,依據《自動噴水滅火統設計規范》 ( gb50084 - 2001 )的規定,利用水力計算方法和基本公式,在自噴的基礎上,採用工程編程軟體visualbasic6 . 0和microsoftaccess2002數據庫進行建築消防統的水力計算程序編制,實現建築消防自噴統設計中的計算機化。
  7. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有限元模型進行穩定性分析,得出其成橋運營階段各種工況下的穩定安全數。在此基礎上,本文還通過有限元模型分析,就拱的矢跨比、吊桿(立柱)的非保向力效應、橋面的剛度、橫撐形式、拱肋側傾角等因素對該橋整體穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全數,指出了對鋼混凝土提籃拱橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩定性的措施的經濟合理性進行了分析。
  8. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究工作主要包括以下幾個方面: 1 )適合電廠工程的進度計劃編制功能的開發完成; 2 )實現電廠工程的施工進度計劃理功能,可以利用施工進度計劃編制統的理工具對施工進度計劃進行基本的理; 3 )實現在施工進度計劃定製統中對施工平面統中的數據的讀取和表達; 4 )完成施工進度計劃數據向施工平面統的傳送。
  9. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    施工詳圖階段,設計單位根據創建節約型社會的宗旨,積極開展一列技術創新和優化設計工作,並首創了廠房尾水段分離式底板新技術,優化設計后樞紐更加緊湊,建築物結構形式更為合理,加快了施工進度,節約工程投資約1 . 37億元,綜合效益顯著。
  10. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電工程施工模擬與優化? ?根據當前水電工程施工組織與理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的施工組織方案,包括施工道路的、施工機械的配備與調度、施工進度的協調、施工資源配、施工材料的優選、料物的優化調配等,開發工程施工三維模擬與優化統。
  11. Traditional breaking system, though is able to meet the national regulation, but due to low breaking efficiency and response speed, complex configuration and reticular pipe layout, hard maintenance and pollution, it has great weakness on safety. therefore, emb - electromechanical braking system is brought forward to solve these problems, furthermore, by integrated through can with other parts, together a chassis control system can be finally built

    傳統的汽車制動統雖然制動性能也能滿足現有制動法規的各項要求,但是總的來說其存在制動效能低、響應速度慢、結構復雜、裝配維修困難、制動復雜、制動液會污染環境等等不足之處,因此,人們提出了車輛電控機械制動統( emb - electromechanicalbrakingsystem )以解決這些問題。
  12. By using the finite element numerical simulating method, and studies based on the practical project xiluodu arch dam, this paper studies systematically the type of joints, placing temperature, protection methods on the surface of concrete dams, the first stage artificial cooling method including different cooling water temperatures, cooling lasting days and cooling pipes arrangement

    本文利用數值模擬計算方法,以溪洛渡實際工程為依託,對大體積混凝土施工中常採用的溫控措施對混凝土溫度變化的影響規律進行了全面統的研究,包括分縫分塊方式、澆築溫度、混凝土間歇時間、一期冷卻方式(包括不同進水溫度、不同水、不同通水時間)等。
  13. The paper analyze many methods of water demand prediction which include many up to date methods and some in common use, and it bring forward some new combinatorial methods which can meet the need of optimization model in precision, such as season exponent, auto adapt filter, season exponent combined grey model, etc. based on the cost and time of modeling jt mainly study the macroscopic network model which describes the correlation between nodal pressures and water plant discharge

    針對時用水量預測模型,採用季節指數法、自適應指數平滑法、季節指數聯合自適應過濾法、指數平滑聯合自回歸法、季節指數聯合灰色統法等具體預測方法,其中數種方法預測精度達到工程要求。實踐結果表明,開發的聯合法效果較好。考慮到網宏觀模型不但能描述整個網的工作狀態,而且建模所需成本低,運行速度快,省時省力,主要研究了網宏觀模型的建立方法,分析測壓點原理並編製程序。
  14. Subsequently, designing the integration of hydraulic loop which makes whole system ' s structure more tighter and simplifies hydraulic loop, so, completing the deploy of hydraulic component. so as to completing the design of whole hydraulic loading system

    為使統結構緊湊、路簡化,根據選擇的液壓元件及已確定的液壓迴路設計了液壓集成塊,完成液壓元件的配,從而完成液壓加載統的設計。
  15. And, the applicable conditions and the merits and shortcomings of every kind of subarea forms are compared according to the plane and vertical arrangements of buildings, water supplying pressure of cities, water tanks or pressure stabilization devices installed in buildings, working states of fire pumps and working pressure of the vertical systems and sprinkler numbers

    同時,根據建築物的平面和豎向、城市網的供水壓力、水箱或穩壓裝的設情況、水泵工作狀態、豎向統工作壓力要求和噴頭數進行各種統分區,討論各種分區形式的適用條件、優缺點。
  16. Space arrangement of basement trench commonly shared by m amp; amp; e ducts and new supporting stand application in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航站區工程地下室共同溝機電線空間及新型支架的應用
  17. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  18. ( 5 ) drinking water systems of high - rise buildings treatment techniques and treatment processes of drinking water are summarized. piping designs, water supplies, system calculations and selection of water pipe of drinking water systems are discussed. some suggestions on management of drinking water based on current situation of drinking water are put forward

    ( 5 )高層建築直飲水統對直飲水的處理技術和處理工藝流程進行總結,從直飲水統的、供水方式、統計算和供水材選擇等方面對高層建築直飲水統進行總結和探討,根據目前國內直飲水現狀提出了相應的理建議。
  19. To achieve the best irrigation system, the es can try several pipe planning s chemes for each irrigation system, and select the best one as the final scheme, thus the optimization is accomplished

    另外,為獲得最優的灌溉統,本專家統對每個灌溉統均考慮了多種方案,可進行多種方案的優選,實現了優中選優。
  20. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    統可以實行作物需水量計算,統設計流量推算、道水力計算、工程投資概算,經濟效益分析等功能,建立了常用的數據庫(材、件、水泵和電機等)並對其進行理和維護,可以實現包括徑優化、材選擇等多種參數選擇在內的多種方案比較、優選。統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作方便。
分享友人