管系滲漏 的英文怎麼說

中文拼音 [guǎnshènlóu]
管系滲漏 英文
leakage of piping
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • 管系 : piping; solenium; solenia tubulature; solenia; line piping; pipe arrangement; piping line; system...
  • 滲漏 : percolation; seepage; leakage
  1. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷統,為2個採暖期、供冷期; 4 、電氣線、給排水道、設備安裝為2年; 5 、裝修工程為2年。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體的長期監控預報預警決策統開發:為監控、預測預報堤防涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. The system differentiates between background losses at joints and fittings and larger scale bursts, and enables operators to quickly localize leaks, deploy maintenance teams, track maintenance status, and access essential zone criteria and data by remote

    統可以區分在道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  4. The solution is based on abb ' s award - winning system 800xa automation platform and includes the wlms and power generation information management ( pgim ) software, the expansion of an existing abb scada system with 800xa and ac800m controllers, magmaster electromagnetic flow meters, and ctu800 - cpe remote terminal units

    統可以區分在道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  5. Plastic piping systems - systems for hot and cold water - test method for leaktightness under vacuum

    塑料統.熱水和冷水統.真空性試驗方法
分享友人