管路頂部 的英文怎麼說

中文拼音 [guǎndǐng]
管路頂部 英文
toof pipe
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • 管路 : pipeline; canal; channel
  • 頂部 : top; upper apex; top half; headpiece; roof; ridge; meplat (彈丸的)
  1. Although unusual in the dublin area, he knew that it was not by any means unknown for desperadoes who had next to nothing to live on to be about waylaying and generally terrorising peaceable pedestrians by placing a pistol at their head in some secluded spot outside the city proper, famished loiterers of the thames embankment category they might be hanging about there or simply marauders ready to decamp with whatever boodle they could in one fell swoop at a moments notice, your money or your life, leaving you there to point a moral, gagged and garotted

    這在都柏林區是罕見的,然而還會有缺衣少食的亡命之徒埋伏在荒郊僻野處,把手槍在安分守已的人頭加以威脅。他們可能像泰晤士河堤岸上那些饑餓的窮流浪漢似的到處蕩來蕩去,對你進行突然襲擊,逼你交出錢來,否則就要你的命。把你搶個精光之後,還往你嘴裏塞上東西,脖子用繩索勒起,把你丟在那兒,以便警告旁人,他們就逃之夭夭。
  2. The bypass line double check valve shall have a single access cover, two independently operating modular poppet check valves, and top mounted test cocks

    線雙止回閥應該具有一個檢修蓋,兩個獨立工作的運行模塊化提升式止回閥,以及安裝測試旋塞。
  3. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆雨水道中遇到的技術難題,進行手掘式工具砂土層法施工技術試驗研究,在研究中考慮砂土層存在的后靠土體移位、變形,工具難以進入出洞土體,挖掘面易坍塌、道中心易偏差及難糾偏等問題,通過對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體換填加固,出洞土體換填加固,以及在工具設置帽、格柵、糾偏系統等技術措施
  4. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞道的面高度,以及通往香港會議展覽中心的東行支必須提高至主水平基準面以下7 . 1米,以避開現有地鐵過海隧道荃灣線,該隧道位於主水平基準面以下14 . 6米
  5. All field connections, remote alarm functions and ac wiring are brought into the enclosure through the top, bottom, or side conduit entrances as indicated on the dimension drawing

    所有現場連接,遠程警報功能和交流電線,都從外殼的、底或側面導引入外殼內,這些都標注在尺寸圖上。
分享友人