管道堵了 的英文怎麼說

中文拼音 [guǎndào]
管道堵了 英文
pipe will be clogged
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞(堵塞) stop up; block up Ⅱ形容詞(悶) stifled; suffocated; oppressed Ⅲ名詞1 [書面語] (墻...
  • : 了助詞1. (用在動詞或形容詞后, 表示動作或變化已經完成) 2. (用在句子的末尾或句中停頓處, 表示變化, 表示出現新的情況, 表示催促或勸止)
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Since the reform and open in china, however, there are many hidden - troubles of transportation though the urbanization level has been improved greatly. for instance, the city has been constructing more high - ways, but the increase of vehicles is much more than mileage, so that the traffic is aswarm and crowded, the living quality of citizens is depressed and the urban economy is blocked

    而我國自建國后,尤其是改革開放以來,盡城市化水平有很大提高,但同時也暴露出很多交通方面的問題和隱患,例如,城市內高等級路增長很快,但由於車輛的增長遠遠高於路里程的增長,從而造成交通擁擠、塞,城市居民生活質量下降,甚至會阻礙城市經濟的進一步發展。
  2. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應用時間較長,目前已積累較豐富的經驗,但在閉水試驗時,兩端砌築磚、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂施工的無壓,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  3. Based on the coal burning mechanism in the precalcinator, by analysing all kinds of effect factors and according to the tga result of the anthracite, sinoma international ncdri developed the on - line spout pipe calciner for 5000 t / d production line of china resource cement ( guigang ) ltd., which composed an excellent - performance precalcining system combined with high - efficiency low - resistance and blockingproof cyclone preheater

    基於分解爐煤粉燃燒機理,並通過分析影響爐內煤粉燃燒的各種因素及依據所用無煙煤的熱失重分析結果,中材國際南京水泥設計研究院開發設計出用於華潤貴港5000t / d工程的噴旋式在線分解爐,並與高效、低阻、防的旋風預熱系統組成性能優異的預分解系統。
  4. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對疏浚泥泵及排泥的動態特性現象進行分析,並應用面向對象的c + +語言開發比較通用的計算機程序,對緊急關閥、水下挖掘機具(如絞刀、斗輪等)吸泥口塞以及事故拋泵等典型的動態工況特性進行計算和分析。
  5. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排水是否合理,觀察布局是否合理,是否暢通,不易塞; ( 3 )注重室外設施設計,如外溝、化糞池、水泵房、排水等系統是否設計合理,附屬設施離居住房是否太近,這主要是為防止在房屋四周產生積水,非凡是大暴雨後,如排水不暢,有可能臟水外溢,被水淹。
  6. Properly installed butterfly valves are virtually self cleaning and are less susceptible to failure due to trash material in the line

    由於蝶閥具有很高的六體系數和性能很好的彈性閥座,因此蝶閥具有自動清洗功能,降低被拉雞雜物塞的可能性。
  7. Butterfly valves because of their high flow coefficients and resilient seats are virtually self - cleaning and are less susceptible to failure due to trash material in the line

    由於蝶閥具有很高的六體系數和性能很好的彈性閥座,因此蝶閥具有自動清洗功能,降低被拉雞雜物塞的可能性。
  8. After comparing three repair scenarios, the following methods were chosen : injecting modified mud to heading face through mud supply tubes of the shield construction machine to block water seepage on the heading face ; then maintenance worker entering the cabin under pressure to replace damaged seal and press cutterhead

    經分析對比,最終選擇從盾構機供漿向刀盤掘進面壓注改性泥漿,對掘進面進行封止水,維修人員帶壓進艙,更換密封與壓盤的方法。
  9. The body of filter adopts anti - block unidirection press valve, avoiding from the pump ' s breakdown when the pipe and papercore is stuffed, from the idle running and damage on motor

    過濾器本體採用防單向壓力式閥門,避免,紙芯塞后悶泵現象,有效防止水泵空轉,損壞電機。
  10. Through real example of desulfuration project in guohua dingzhou power plant, the problems, such as slurry - freezing and blocking in the pipe conduit and other equipments, occurred in trial operation of limestone - gypsum wet type flue gas desulfuration equipment have been presented

    摘要通過國華定洲電廠脫硫工程實例,介紹石灰石石膏濕法脫硫裝置在冬季試運期間遇到的、設備內漿液凍結及塞的問題。
  11. Abstract : theoretical analysis and calculation on the case of frequently choking of dust removal piping in 401 - conveyer station of sintering factory of wisco have been made in this paper. by comparing the calculation results with the related parameter of technical requirement, the frequently choking causes have been found out and the appropriate improvement measures have been put forward

    文摘:對武鋼燒結廠401轉運站除塵經常塞的原因進行理論分析和計算,計算結果與工藝要求的有關參數進行對照,找出現有除塵塞的原因,並提出相關的改進措施。
  12. The sewege ( 應 為 sewage ) pipe is blocked ; give it a good flush

    "這根下水,好好地沖一沖。
  13. The difference of liquid levels between the direct contact heat exchanger and the depositing pool is used as the diving force of the water flow

    同時採用簡單的熱力凈化方式既防止水垢塞蒸汽又簡化裝置。
  14. It is the partial collapse of the airway ( breathing tube between nose, mouth and lungs ) that is the immediate cause of snoring, and its complete collapse that is the immediate cause of apnea

    部分氣(呼吸位於鼻子,嘴巴和肺之間)的塞就會造成打鼾,如果所有的氣起來,那麼就會呼吸暫停。
  15. Numerical simulations were carried out to investigate the effects of the ratio of surface to volume on the two phenomena

    並研究表面積與體積之比值對亞塞臨界壓比的影響。
  16. And combined with the engineering practice of xiao - xiang highway route alteration project, it introduces the technological process of on - line blockage with high pressure expansive cylinder and the key working procedure of practical operation

    對比囊式封和盤式封,從安全性、經濟性、可操作性、穩定性和時效性方面論述膨脹筒式不停輸封的特點及其在油氣施工中的優越性。