管道定邊坡 的英文怎麼說

中文拼音 [guǎndàodìngbiān]
管道定邊坡 英文
benching
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  • 邊坡 : bank
  1. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸水系統及水力學、高、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  2. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸水系統及水力學、高、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. He has contributed significantly towards experimental research in a wide range of practical problems including slope stability, reinforced fill, retaining walls and excavation support systems, submarine pipelines, piling and ground treatment processes. his contributions in retaining walls and reinforced soils earned him the sir benjamin baker silver medal awarded by the uk institution of civil engineers

    他對實驗研究作出極大的貢獻,研究課題實用性高而且廣泛,包括、加固填土、護土墻和深基開挖支撐系統、海底、樁基礎和地基處理。在護土墻及加固填土方面的研究使他贏得英國土木工程師學會的sirbenjaminbakersilvermedal 。
  4. Numerical analysis of infiucence of seepage from underground conduit lining under high internal water pressure on slope stability

    襯砌內水外滲對影響的數值模擬
分享友人