粘土夾層 的英文怎麼說

中文拼音 [niánjiācéng]
粘土夾層 英文
clay band
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  • : 夾構詞成分。
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. Based on the test of drainage salinity effect in different clay interlayer and the analsis of thickness of drainage salinity layer, the design parameter of effective drainage salinity semidiameter, amount of sand - hole and semidiameter of hole were put forword

    通過對不同位的粘土夾層壤的洗鹽效果試驗研究,分析了脫鹽厚度、計劃脫鹽脫鹽效率,提出了有效洗鹽半徑的概念、砂孔數量及孔徑等設計參數,並制定相應的洗鹽制度。
  2. Based on the experimental results, in concrete limitation stress sandwich first stage ' s ability and one - way and two - way precast slabs sandwich, results content code require - second class crack control. resistant crack calculation is appropriate. because post - tensioned prestressed advances plane ' s resistant crack. deformation and section strain measure accord with calculation results, this indicates 3d - gridding beams modulus is reasonable to precast slabs sandwich

    本文通過對試驗數據的分析總結,認為:單塊板第一受力階段的性能試驗及單向和雙向裝配整體式板的性能試驗,滿足《混凝結構規范》 ( gb50010 - 2002 )中關于預應力樓板的二級裂縫控制等級的要求,抗裂設計得當;由於板縫無結預應力筋的存在提高了板的抗裂性。
  3. Five floating roof oil tanks with volume 2 104m3 are designed to be constructed at shuguang pump station possessed by liaohe oil field, which is located at liaohe delta alluvial plain. this engineering filed is featured with complicated topography. the oil tank foundation soil is horizontally - layered, including four layers : medium dense - dense clay, interbedding of find sand and clay, fine sand sandwiching clay and fine sand

    位於遼河三角洲沖積平原的遼河油田曙光泵站計劃增建5座2 10 ~ 4m ~ 3浮頂式儲油罐,場區地形復雜,油罐地基分佈均勻水平,從上之下主要由中密粉、粉細砂與、粉細砂和細砂等4組成。
  4. According to the situation on back - salinity at clay interlayer in gansu shule river irrigation area, the improvement technology on drainage salinity through stand - hole was suggested to adopt in shule river irrigation area

    摘要針對甘肅省疏勒河灌區粘土夾層壤的阻水滯鹽作用,提出了豎孔排鹽改良技術。
  5. The papers and technical reports about the oil tank foundation treatment shows that in our country abundant experiences have been built up in dealing with the soft clay foundation, while there were few cases for sand foundation. analyzing the geological condition, the author proposed that the foundation soils at shuguang pump station belong to high - permeability sand layers

    根據曙光泵站地區的地質條件,論文認為該區主要是一套以高透水性的砂類為主的地較薄且富粉細砂,地基的水平向與垂直向排水條件良好。
  6. The bridge is located on the alluvial plain in the front of pearl river sloping field. its piles pass through weak soil layer, sandy clay and gravel stratum ; piles " sustaining layer sits in weak - weathering or faint - weathering mudstone

    該橋位於珠江三角洲坡前沖積平原,採用樁基穿越軟、亞、砂和礫砂,持力置於弱風化和微風化的泥質砂巖和泥灰巖泥巖中。
分享友人