系泊部件 的英文怎麼說

中文拼音 [jiàn]
系泊部件 英文
mooring component
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 泊名詞(湖) lake
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 部件 : component; unit; parts; assembly; subsystem; secundina (pl. secundinae)
  1. Rotation - cavitation mechanism was outlined based on the experiment results and the essential conditions for the occurrence of auxetic properties in polyolefin blends were concluded as followed : firstly there must be at least two phases, the matrix can be soft materials which were able to be networks when being stretched, as well as suitable consistence must be provided between two phases. fracture stress work measurement was optioned to characterize the force between two phases. finally, the auxtic property repeatability of the blends was measured and the fact that the auxetic property could only occur in the elastic range was certificated by the result that only the specimens which were stretched for 5s, 10s had repeatability after being retained for 1 months

    實驗工作的最後一分研究了體松比效應的可重復性,選取穩定的負松比共混體在測試數據採集時間為55 、 105 、 155 、 205條下進行測試,將樣條放置l天、 10天、 30天進行測試,測試結果表明,在5s 、 105條下測試的試樣在放置一個月後松比測試結果具有可重復性,證實了體的負松比現象發生在材料的彈性形變范圍內。
  2. Although the accuracy in meterological forecast of tropical cyclones has been distinctly improved, it is still a difficult problem confronting masters and anti - typhoon team leaders of the companies how to steer clear of typhoon reasonably and safely in case that the actual resistance to typhoon is strong enough, the sea area wide enough, and the time permitting ; to avoid unreasonable deviation, anchoring for shelter, blindly rushing onto her path, being involved in storm area, even into the the center of typhoon ; under the limitation of the condition of the sea area and time. how to take correct meassures to escape, such as navigating with wind or windward in bias angle, slowing down, anchoring, berthing alongside the warf, mooring to buoy, etc. as early as possible

    盡管氣象門對熱帶氣旋監測預報的準確率已經比過去有了明顯的提高,然而船舶在海上如何避離臺風,如何做到在本船實際抗風能力允許、海域條允許、時間也充裕的前提下合理避臺,安全避臺,避免不合理的繞航、 「扎風」 ,避免盲目冒進「搶風頭」 ,更避免被捲入強風區甚至臺風中心;在海域條受限、時間尷尬的情況下又如何正確採取偏順航、偏頂航、滯航、錨岸、浮等抗臺措施和技術,盡快擺脫臺風的影響,仍然是擺在船長和公司防抗臺領導小組面前的一個實實在在的難題。
  3. The first part. task analyse of handling technology design. is explain the place, basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design. the second part, project study out. is discuss the design contents the choice of the leading and the assistant engine, the form of the handling mechanisation system, project study out. the third part, size design, is count the berth pass capacity, the amount of handling engine, the area and capacity of yard, road and gate, the worker amount. the fourth part. technology and economy argumentation, commendable project confirm, is confirm the commendable project by technology and economy argumentation. in the end, considering the technology, economy and use. discourse commend the project of rubber - tyred gantry crane. at present. centre government is studying yangshan project, but in handling technology part of container terminal, the design is simply. so this discourse has important consult value. and has important value of economy and community too

    第一分的裝卸工藝設計任務分析主要就洋山港區的地理位置、基礎設施、自然環境,設計前提條,設計原則以及設計主要技術參數進行說明;第二分的裝卸工藝方案擬定主要就工藝設計的主要內容,主要機械及輔助機械選擇,裝卸機械化統組成以及工藝設計方案擬定進行論述;第三分的裝卸工藝方案規模設計主要就位通過能力,裝卸機械臺數,堆場面積及堆存能力,道路及大門,司機及工人人數,工藝流程進行計算分析;第四分的技術經濟論證及推薦方案確定主要就技術、經濟指標進行對比論證,並在此基礎上確定推薦方案。
  4. Then the paper dissertates theory of parts measurement and its exercise in measurement and repair of waterway fixed assets, bases the measurement of the fixed assets on the parts, and distributes value of the vessel to hull, shafting and screw propeller, telecom facility, air - conditioning system, electric system, main - engine and subsidiary engine system, and so on. the following expenditure should be capitalized : ( 1 ) adding new components ; ( 2 ) replacing the current components, and all other expenditure be expensed

    集中闡述了船舶應按照船體、靠統、主輔機統、螺旋槳與軸、空調統、電氣設備、電信設備、起貨統、救生統等主要進行計價;在修理支出中,應將符合下面兩個條的支出項目予以資本化: ( 1 )增置新的, ( 2 )現有的重置。
分享友人