組合肋 的英文怎麼說

中文拼音 [lèi]
組合肋 英文
built rib
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 肋構詞成分。
  • 組合 : 1 (組織成為整體) make up; compose; constitute 2 (組織起來的整體) association; combination3 [...
  1. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型墻體在不同連接構造和不同荷載效應作用下的受力形態和破壞模式進行研究;計算分析了復墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內柱配筋等諸多因素對密墻體承載力及剛度的影響,得出其變化規律。
  2. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓板與鋼梁的作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程中節點設計應當考慮這種作用;樓板內縱向鋼筋配筋率與柱腹板加勁對節點性能影響顯著,而連接端板厚度及剪力連接程度的影響則不是太顯著。
  3. In virtue of finite element program, this paper calculates the model of rc - masonry combination arch bridge in the stages of construction and use in this paper. based on these data, it analyzes the structure behavior of the reinforced concrete arch ribs and the masonry arch ribs using methods of inner force and stress

    本文藉助有限元程序對rc -石砌體拱橋的計算模型進行了施工階段和使用階段的計算,並採用應力疊加和內力疊加兩種方法對rc拱和石砌體拱板的受力特性進行分析。
  4. Thus it is necessary to study moment resistance, rotation stiffness and rotation capacity of the joints. in this paper, six specimens on end - plate composite beam - to - column joints and two specimens on end - plate composite beam - to - column joints were designed to subject to static load. the factors of m - characteristics about semi - rigid composite joints, including bolts, profiled steel sheeting, beam, column, stiffen rib and reinforcement, are studied

    本文設計了6個端板型鋼-混凝土樑柱節點與2個端板型純鋼樑柱節點,通過對這些試件的靜力荷載試驗,重點研究了端板型鋼-混凝土節點的彎矩-轉角性能的影響因素,包括高強螺栓、壓型鋼板、型鋼梁、型鋼柱、加勁,以及混凝土板內縱向鋼筋配筋率等。
  5. The research suggests that the failure process of the multi - ribbed composite walls under horizontal seismic loads is : the cracks of the infilled silicate bricks and the cracks of the inner rib beams and rib columns - the cracks of the outer frames ; and that the walls can release energy by stages, showing perfect capacities of energy dissipation and collapse resistance

    研究表明:復墻板在水平地震力作用下,其破壞過程按「填充砌塊?柱?外框架」的順序進行,分級釋放能量;試驗中墻板大部分發生剪切滑移破壞;墻板的平均抗剪承載力、延性指標、耗能及抗倒塌能力明顯優于磚墻。
  6. The wall was equaled to an elastic composite slab with silica bricks as main body and concrete rib beams, columns and outer frame as reinforcing fiber. ( 2 ) elastic - plastic stage. the wall was equaled to a rigid frame - oblique compression bar model in which concrete frame was equivalent to a rigid frame while silica brick was equivalent to a oblique compression bar

    ( 1 )彈性階段? ?將墻體視為一種以輕質砌塊為基體,混凝土梁、柱、外框為增強纖維的復材料等效彈性板; ( 2 )彈塑性階段? ?將墻體視為一個由鋼筋混凝土剛架和與之鉸接的砌塊等效斜壓桿成的剛架斜壓桿模型; ( 3 )破壞階段? ?將墻體視為梁嚴重破損的梁鉸框架模型。
  7. The operation contained resecting the back rib covering the cavity, separating the intercostal tissue, cutting the external wall of the cavity, cleaning the cavity thoroughly, scraping the cavity till exposing the fresh tissue, killing the tuberculosis germs with organic acid, filling the cavity with the intercostal muscle, fixing and suturing the muscles

    切除覆蓋在空洞外側的骨後段,游離相應部位的帶蒂織,剪除空洞外側壁,徹底清除空洞內容物,刮出新鮮創面,有機酸殺滅可能殘留的結核分支桿菌,將準備好的間肌瓣填充于空洞殘腔內,縫固定。
  8. A combined network which consists of four subnets is put forward. every subnet is trained using the data of one portion of arch - ring elements, and the outputs from all subnets give the whole damage information of the arch - ring

    構造了一個由四個子網成的網路,每個子網分別針對拱中的部分單元進行訓練,然後由各子網的輸出共同給出整個拱的損傷狀態。
  9. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離式雙主截面是由橋面板與邊主梁而成,由於其施工方便,在大跨度預應力混凝土斜拉橋中得到廣泛應用。
  10. Finite element analysis on flexural loading capacity of composite slim beam with deep deck in the hogging moment region

    負彎矩區深扁梁抗彎性能的有限元分析
  11. The test results indicated that the performance of the composite panels can be well displayed if the types of steel stiffeners were adequately selected, the goggle pins were rationally laid out and the thickness of concrete was apropriately determined

    試驗結果表明,通過適當地選擇型鋼加勁形式、理地布置栓釘和確定混凝土厚度,可以保證作用的發揮。
  12. By using the types of stiffeners, the thickness of the composite panels and the arrangement of the goggle pins as the parameters, mechanical performance tests were made on 9 composite panels

    以加勁形式、板厚度和栓釘布置為參數,進行了9塊板的力學性能試驗。
  13. A new type composite quay - wall panels of steel and concrete with profiled steel used as the stiffeners were proposed to meet special requirements

    摘要基於特殊需要,提出了帶型鋼加勁的鋼板混凝土板這一新型碼頭面板。
  14. The submarine structure is simplified to single or double infinite cylindrical shell stiffened with rings, bulkheads and stringers, focusing on underwater sound radiation from the single shell. the shell motion is described by donnell ' s theory including excitation forces and reactions of rings, bulkheads, stringers and fluid, which leads to the fluid - structure coupling vibration equation. expressing displacements by velocities, applying modal expansion circumferentially and fourier transformation longitudinally result in the shell ' s modal equations of motion

    殼體的運動方程採用較為簡單的donnell理論描述,運動方程中包括了激勵力、加筋結構(環、艙壁和縱骨)和流場對殼體的作用力,從而成流場-結構的耦振動方程,並進一步將方程中的位移用速度表示,然後沿軸線方向進行fourier變換,將速度和各項荷載沿圓周方向進行模態展開,得到了殼體振動的模態運動方程。
  15. The experimental method of the model test with 1 : 6 scale based on the work mechanism of bearing of steel y - pipe strengthened inside with crescent rib in combination with surrounding rock mass simulated by composite materials is adopted and the regularity of their participant capacity to bear inner water pressure is analyzed in this paper

    摘要本文結實際工程採用幾何比尺為1 : 6的物理模型試驗方法,用不同材料分層模擬圍巖,對水電站內加強月牙鋼岔管與圍巖聯承載的工作機理、圍巖分擔內水壓力的規律進行分析。
  16. Considering that the " soft rib " of risk administration of state - owned commercial banks lies in the poor condition of technology, the essay introduces and streams the administrative molds of capital and property formation of current world banks

    針對目前國有商業銀行風險管理的「軟」恰恰就在於技術平臺的薄弱,介紹了目前國際銀行界流行的資產管理模型,並進行了分類。
  17. But there is still a lot to be advancedresearch, complement in the development application process of new construction system. the paper, through the test of shear property and the factor analysis, studied rigdity and restoring force characteristic of multi - ribbied slab. finished work as following : though aseismic test of nine 1 / 2 - scaled model and one 1 / 4 - scaled model slabs, the paper studied breakage form, bearing capacity and energer consume, questioned stagnant speciality and contrast analyzed all kinds of factors influenting rigidity

    本文是在總結課題前期研究工作的基礎上,通過對墻板模型的抗剪性能試驗及因素分析,就密墻板的剛度及恢復力特徵進行了研究,完成的主要工作如下:通過對9塊1 2比例及一塊1 4比例墻板模型抗震性能試驗,研究了墻板的破壞形態、承載力、變形及耗能;探討了墻板的滯回特性;同時對影響剛度的各種因素進行了對比分析。
  18. In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision

    為了滿足大跨度鋼管混凝土拱橋施工的安全性與成橋預期的內力狀態和拱線形,本文結工程實例,分別對理成橋狀態和扣索索長調整的目標函數的確定進行了分析,將一多變量、多約束的最小化問題無約束化,從而建立起適於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機最優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。
  19. First, failure pattern, deformation character, carrying capacity and rigidity of multi - rib panel with outer lightweight frame under seismic loading are analyzed synthetically in the paper

    文中首先對帶邊框密墻板在地震作用下的破壞模式、變形特徵、承載能力及剛度進行了綜分析,並與磚墻的受力性能進行對比。
  20. Analysised the cross - experimental results and found the fittest way of various constructs to get the highest value of the thermal performance factor. gave the theorith analysis of the mechanism of enhancement of heat transfer. and point out the optimize way of the fin

    得到了叉排列三維內管在以上三個流態區間內,達到熱力性能系數最佳時的結構方式,並對強化傳熱的機理進行了理論分析。同時,指出了形結構進一步優化的方向。
分享友人