結合梁 的英文怎麼說

中文拼音 [jiēliáng]
結合梁 英文
bond beam
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 結合 : 1 (發生密切聯系; 聯合) combine; unite; integrate; link; binding; coalition; cohesion; connectio...
  1. They are jinfo mountain in nanchuan county ( natural protection section ), wuling mountain in qianjiang county ( national emphases forest demonstration county which forest cover rate is beyond 50 % ) and zhongliang mountain in beibei county ( artificial destruction is very grave ). some main land use patterns i. e. woodland, garden, infield, abandon infield, shrub and grassplot are selected in those three sample sites. four aspects on soil fertility index of karst environment under different land use patterns in these three sample sites, are revealed in this paper, by using the field test, indoor measure and analysis, outdoor experiment and field investigation, and the knowledge and technique of soil, ecology, physics and chemistry etc. they are physical characteristic ( effective soil thickness, organic layer thickness, soil texture, water - stable aggregate and soil water etc. ), chemical fertility ( organism, omni - n, omni - p, omni - k, alkali - nitrogen, available p, available k and rapid available k etc. ), soil animalcule ( bacteria, fungi, actinomyces and their grosses ) and soil - seed - pool ( plant community diversity index ) in karst ecosystem

    本研究以重慶市的南川金佛山(自然保護區) 、黔江武陵山(國家重點退耕還林示範縣,森林覆蓋率50以上)和北碚中山(遭人為破壞嚴重)典型巖溶區為對象,選擇了幾種重要的利用方式,包括林地、果園、耕地、棄耕地和灌草坡,採用野外巖溶生態調查和室內試驗測量分析相的方法,以不同土地利用方式巖溶土壤肥力為重點,對不同土地利用方式土壤肥力特徵進行量化分析,找出巖溶土壤肥力差異的主要方面及其根本原因,論文主要從土壤剖面物理退化指標(有效土層厚度、有機質層厚度、質地、團聚體、水分含量等) ,化學肥力退化指標(有機質、全n 、全p 、全k 、堿解n 、速效p和速效k等) ,樣地土壤微生物指標(細菌、真菌、放線菌數量及總量)以及樣地土壤種子庫植物群落多樣性等4個方面對重慶典型巖溶區的土壤肥力特徵進行了較為詳細的分析研究,為巖溶地區士壤資源的理利用及構的調控管理提供依據。
  2. Destabilization laws of an arcuated built - up system bridge are provided, nonconservative force of hanger rods and members " bearing force are integrated in order to consider influence of hanger rods towards arch stability

    提出了拱式組體系橋的失穩規律,將吊桿非保向力和構件受力起來考慮吊桿對拱穩定性的影響。
  3. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了高架軌道交通的景觀特點和空間組模式;通過討論景觀評價的標準,將景觀評價標準總為外顯、關系、內涵三個方面;然後杭州市地鐵一號線工程,從外顯、關系、內涵三個方面分析高架軌道交通可能產生的景觀影響問題;最後城市設計的角度,對橋的造型和色彩等方面提出部分改進意見。
  4. It is the key of ebfs, therefore, furthermore calculation about link are carried out in this thesis, introduced achieved research, summarized the affect of link on whole capability in the first, the second, numerical calculation are proceeded on link with ansys : with the purpose of discussing yielding mode critical length of link, established five different specimens ; with the purpose of discussing the influence of h / tw of web, b / tf of flange and h / b, established eighteen different specimens ; with the purpose of discussing the affect of stiffener, established four different specimens, and elaborated the affect of stiffener on link based on achieved test researches

    因此,本文對耗能段進行進一步計算分析,概述耗能段對整體性能的影響,並利用有限元程序ansys對耗能段進行數值計算:針對耗能段的屈服類型建立5種不同長度的模型,計算討論耗能段屈服類型的長度劃分;針對耗能段腹板高厚比、翼緣寬厚比以及段截面形狀等因素共建立了18種模型進行計算分析;針對加勁肋對耗能段的作用建立了4種模型,並已有的試驗闡述了加勁肋對耗能段的影響。
  5. Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results

    密肋復墻板的特殊構造,建立墻板的復材料二相體力學模型,按照混凝土與砌塊體積比不變原則對肋肋柱同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密肋復墻板的實用彈性剛度計算公式提供必要的參數。
  6. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪水特點,以往工程實際,對影響跨河橋設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日降雨量法。
  7. The paper studied tests on three epiboly profiled bar concrete beams, bearing capacity of normal section, stiffness and behavior of cracks, and put forward formulas as advise. based on extant nonlinear concrete theory, a fem model was built by ansys program. the results of fem analysis was verified by tests data. some parameters in fem model were changed to build different models and the analysis results were compared with the advised formulas

    本文通過三根外包型鋼混凝土試驗,研究了其正截面承載能力、剛度以及裂縫方面的性質,並提出了一些相關建議公式。同時在現有混凝土非線性分析理論的基礎上,採用ansys有限元分析程序建立了外包型鋼混凝土的有限元模型,試驗數據對模型進行了驗證,另外還改變了一些參數建立了有限元模型,並和建議公式的果進行了對比。
  8. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成工字型、壓型鋼板上現澆築混凝土組成組樓板並與一起構成組作為承重構件,以輕質節能保溫型墻體作為圍護構組成。
  9. Based on using elementary ideas of the latest theories with the combination of extensive achievements of bridge condition assessment and the other correlative domains, the assessment model was established using analytic hierarch process and variable weight synthesizing, which evaluated pc cable - stayed bridge ' s condition in service by grading items in bottom level of assessment model

    在吸收和採用已有成果的基本思想的基礎上,國內外橋評估領域和其他相關領域的研究成果,建立了以層次分析法變權綜原理為基礎,通過打分方式對pc斜拉橋的狀態進行評估的架構與模式。
  10. The field observation of the sediments of storm surge produced by no. 11 typhoon in 1997 shows that sedimentation rate of storm surge sediments are greater than that of normal astronomical tide sediments, and the grain size shows relative coarse with poor sorting. vertical sequences of the storm sediment show parallel bedding and overlapped by hummock bedding. these characteristics provide good basis for building the index of storm surge deposit

    通過對垛河閘9711號臺風的現場觀測並目前已有的風暴潮沉積的研究,分析了風暴潮沉積在構造和構上的特點,從而建立了正常潮灘沉積中風暴潮沉積的識別標志,同時在野外觀測中還發現即使在風暴潮期間,高潮灘上部仍存在只有淤積沒有侵蝕的地帶。
  11. Being lacking of understanding of behaviors of circular working shaft, the paper proposed theory about ring - beam ' s load - distribution calculations and analyzed the structural behavior of circular working shaft ( cws ) by the numbers from the standpoint of properties of structural style and stress incorporated with thoughts of shared load introduced to research of cws. first, regarding cws as structure of series of hypothetic horizontal circular rings and vertical beams, and considering cws ' s formation and development, the paper proposed load - distribution thoughts to solve cws ' s calculations. ring - beam calculation theory was put up and software cbtlmp1. 0 was worked out based on the conditions of external applied load shared by rings and beams, and of deformation conformity

    首先,本文提出用分載思想解決圓形工作井構的計算分析問題,將圓形工作井構看成是由一系列的假想的水平圓環和豎直組成的構,考慮工作井形成過程及形成階段與項進階段的連續性,根據某一時刻相對于上一時刻外載增量由環與分擔、環與在交叉處變位增量一致的條件將環計算理論與計算理論起來,據此建立了環?分載計算理論並研製了環?分載計算分析軟體cbtlmpv1 . 0 。
  12. 5 ) a new type of superposed beam used in wutaizha terminal market, with notch at each end of the prefabricated member, is analysed, and design method of it is also regard as the representative of the superposed beam with notchs

    5 )針對武泰閘農副產品市場工程中使用的帶槽預制構件疊,根據前面提出的計算方法,總了這類形式的疊式受彎構件的設計計算原則以及計算方法。
  13. Spatial analysis on continuous plate - truss compositesteel truss bridge across the wuhu changjiang river

    蕪湖長江大橋連續板桁結合梁的空間構分析
  14. Some key issues in the modeling of a long span composite cable - stayed bridge are discussed such as cable tension, dead load, large deflection, concrete deck stiffness, concrete deck - steel girder connection, and boundary condition. some conclusion can drawn from the thesis : 1. the initial equilibrium configuration of the bridge is clarified in the thesis

    本文深入討論大跨度結合梁斜拉橋"基準"有限元模型建立過程中的幾個關鍵問題並得到一些有意義的論: 1 .明確斜拉橋在索初應力和恆載作用下的初始平衡構型? ?處于初始平衡狀態時的幾何位置,給出了其計算方法。
  15. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大橋主航道斜拉橋鋼混凝土箱形結合梁的鋼構部分、混凝土橋面板、鋼混凝土部位在海洋環境下耐久性設計特點及採用方案。
  16. The construction technology of steel combination wigh concrete beam

    鋼混結合梁施工技術
  17. An analysis of the tilting causes and the adjustment of the steel - concrete composite beams for the jin - bin light railway

    津濱輕軌鋼混結合梁傾斜原因分析與調整
  18. Owing to the extensive applications of the beam bridges with high - piers and long - spans in engineering, so it has the important and realistic significance to make the buckling analysis and present a design that is satisfying to the using function and dependable safety construction and at the same time convenient to construction of the beam bridges consulting to the following factors, such as the actual circumstance of the beam bridges and every kinds of problems met when the design is presented. it offers an experienced instruction to whom will encounter the same circumstance during the practical work in the future

    因而,鑒于高墩大跨橋在工程中應用的廣泛性,那麼對其進行穩定分析以及如何結合梁橋的實際情況,妥善解決設計中的各種具體問題,做出一個既滿足橋使用功能,構安全可靠,同時又方便施工的設計就具有重要的現實意義,並為今後在實際工作中遇到類似情況時提供一種有意義的、經驗性的指導。
  19. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜力試驗和環境振動試驗果對初始有限元模型進行校正,通過參數的調整使模型靜、動力計算果與實測值吻
  20. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導解決大跨度鋼箱混凝土結合梁橋的鋼箱架設技術難題,重點闡述了施工方案,龍門吊、導設計,工藝要點等。
分享友人