結構應力 的英文怎麼說

中文拼音 [jiēgòuyīng]
結構應力 英文
structural stress
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的計算和其理論計算果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索檢測和溫度監測的方法。
  2. This paper introduces the calculation of the loads of different waves and the combination of sine wave and cosine wave. furthermore, stressing on discussing the corresponding problems of the fem of the whole structure and putting forward the basic principles of building a fleet. taking a fleet for example, the paper discusses the whole response of the fleet and the local response of it according to different load cases

    本文介紹了船舶的波浪載荷計算及按動態載荷法進行載荷分量組合,而且研究了有限元模型的有關問題,給出了的模型化原則;本文以一條051艦為例,討論了不同的工況下整船艦艇結構應力的響以及局部的響
  3. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室,就兩種襯砌型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌選型角度分析對比了兩種襯砌型式在圍巖及襯砌結構應力與變形、襯砌鋼筋混凝土開裂、圍巖與襯砌聯合承載、安全儲備、經濟等方面的優劣。
  4. Intensity analysis of 1. 5mpa high - pressure gas quenching vacuum furnace

    真空高壓氣淬爐快開結構應力計算
  5. For a project instance, it computes and analyzes the structure of madian radial gate with fem, which achieves the result of gate ' s structural stress, stiffness and surpport - bar ' s stability and gives comparative analysis

    作為工程實例,對馬甸弧形閘門的進行了有限元計算和分析,得到了閘門的結構應力、剛度以及支臂穩定的計算果,並給予了比較分析。
  6. The effects of r / h ratio, l / r ratio and cone angle on the dynamic response of the conical shells are discussed in this section

    分析了圓錐殼的徑厚比、長徑比及錐角變化對結構應力的影響。
  7. Comparison of stiffness, strength and obturating performance of the initial obturator of the breech mechanism with those of the optimized one is made, which indicates that the stress concentration that leads to fatigue failure in the optimized structure is eliminated. the flexibility of the optimized obturator of the breech mechanism is considerably increased and its obturating performance is substantially improved

    對優化前後炮閂閉氣剛強度和閉氣性能進行了對比,優化后的結構應力集中問題得到了有效控制,消除了潛在的疲勞源,的柔性得到很大程度的提高,閉氣性能有了明顯改善,實現了優化的目的。
  8. Moreover, the time - dependent stress in ribs due to the creep also has been measured for about one year since the static experiment case was over

    在完成靜加載工況后,對模型進行了一年的持荷觀測,實測鋼管混凝土徐變對結構應力重分佈的影響。
  9. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預的發展歷史及現狀作了綜述和總,指出當前預工程實踐中存在的主要問題;闡述了預的受機理,並指出預的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預優化設計模型;提出多次預優化設計方法和步驟,採用線性規劃和滿約束準則相合的優化方法,可優化設計出施加的每一級預的大小,並得到各部分的優化截面;對多次預最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預的方案進行比較,對于局部布索,預只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  10. There are two equally important contents - structure line shape and structure stress in construction monitoring and controlling. they must be controlled all - round in order to making trouble - free construction and reaching the design point

    橋梁的施工監控包括線形和結構應力兩方面的內容,具有同等的重要性,必須全面控制才能使施工順利進行,才能達到設計狀態。
  11. It is important, then, that the new heart has a similar tissue makeup to the heart patient ' s

    移植心臟與受體心臟的組織結構應力求一致。
  12. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受特性,考慮地下初始和開挖荷載對襯砌內的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受特徵、和位移變化規律。
  13. Methods for stress relaxation tests for materials and structures

    材料和結構應力鬆弛測試方法
  14. Stress test method for large structure of missile ground equipment

    導彈地面設備大型結構應力測試方法
  15. A visco - elastic - plastic analysis method for stress field of massive concrete structures

    大體積混凝土結構應力場的粘彈塑性分析方法
  16. The operation status of equipment keeps close relation with its inner structural stress

    設備的運行狀態與其內部結構應力之間存在著緊密的關系。
  17. Stress analysis on integral reinforced structure of cylindrical housing forging with openings under inner pressure

    內壓圓柱殼開孔整鍛件補強結構應力分佈研究
  18. Stress analysis for tangential bonded structure of pressure vessel and pipe based on finite element method

    容器與切向接管結構應力三維有限元分析及強度評定
  19. 3d numerical simulation of stress and strain properties of concrete shield tunnel lining and modeling experiments

    隧道襯砌結構應力與變形的三維數值模擬與模型試驗研究
  20. This model offers a new and simple method for measuring s - n curve and fatigue limit of a material or a machine part

    該模型提供一種新的測定材料和結構應力(載荷)壽命曲線的簡易方法。
分享友人