給水溫度 的英文怎麼說

中文拼音 [gěishuǐwēn]
給水溫度 英文
feed temperature
  • : 給Ⅰ動詞1 (送對方某物; 使對方得到) give; grant 2 (用在動詞后 表示交與 付出) pass; pay 3 (叫; ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 給水 : [機械工程] feedwater; water supply給水泵 feed pump; 給水量 confluent; 給水能力 capacity of water ...
  • 溫度 : [物理學] temperature
  1. Heat convected, a mode of motion developed by such combustion, was constantly and increasingly conveyed from the source of calorification to the liquid contained in the vessel, being radiated through the uneven unpolished dark surface of the metal iron, in part reflected, in part absorbed, in part transmitted, gradually raising the temperature of the water from normal to boiling point, a rise in temperature expressible as the result of an expenditure of 72 thermal units needed to raise i pound of water from 50 to 212 fahrenheit

    燃燒所引起的運動形式之一-熱對流傳熱,不斷地加速地從熱源體傳導容器中的液體,由那凹凸不平未經打磨的黑色鑄鐵面把熱向周圍發散出去一部分反射回來,一部分被吸收,另一部分被傳導,使從常逐漸升到沸點。這種的上升可作為消費結果標志如下:將一磅從華氏五十加熱到二百十二,需耗七十二熱量單位。
  2. Based on analysis of geologic foundation record about pingzhuang basin, a lot of sino - foreign geothermal geology record and investigation of field geology, measuring of ground temperature in person and geo - chemical analysis of ascension spring, gushing water of fault, the fact that the anomaly of geothermal gradient of pingzhuang basin, which is in region of low geothermal gradient, is caused by redistribution of conduction - oriented geothermal heat flow which is result from upheaval and depression of basin foundation bed is pointed out. after the field of ground temperature is simulated under the background of conduction - oriented geothermal heat flow by means of ansys, the characteristic of ground temperature distribution of top surface of basin foundation bed ( yixian team ) is revealed. the sound condition of transmissibility fault and feeding water source, which are imperative in formation of the low - medium temperature geothermal system of convective type, is possessed in pingzhuang basin

    通過對平莊盆地基礎地質資料、國內外大量地熱地質資料的分析和野外地質調查、礦井實測地以及上升泉、斷層涌的地球化學分析等工作基礎上,指出地處低地背景區的平莊盆地地異常是由於盆地基底隆起和坳陷引起傳導型大地熱流再分配所致;運用州sys數值模擬了大地熱流向地表傳導背景下的盆地地場,從而揭示了盆地基底(義縣組)頂界面地分佈特徵;闡明了盆地具有形成中低對流型地熱系統所必需的導斷裂、補源等的良好條件,中低對流型地熱系統是地熱勘查的主要對象;圈定了平莊盆地北部朝陽溝?駱駝營子地熱勘查遠景區。
  3. A heating unit in the basement of a house burns gas to heat air or water, which is then forced through the house or building to raise it ' s temperature

    居於樓房地下室的一個供熱裝置通過燃燒氣體釋放熱量來和空氣加熱,加熱的或空氣則靠壓力運送到樓房或大樓來提高它的
  4. By means of analyzing the measured data of deformation and temperature inside the structure, the laws of deformation and temperature of the sfrc structure under the influences of early hydration heat and outside temperature were found

    通過實測結構內部及其變形,出了鋼纖維混凝土在早期化熱及外界影響下的及變形規律。
  5. This thesis investigated and researched on non - loaded crack, especially those caused by thermal - shrink, and analyzed the thermal - shrink stress of beam, slab and continuous - wall, found that according data of civil and overseas offered thermal - shrink calculating formula without considering effect of factors, such as the cement quantity, using of aruhuesiru, aggregate size and quantity of sand, which made the result data smaller. in addition, there are not enough construct measure in code

    本文對非荷載裂縫,特別是?收縮裂縫進行了調查研究,並對兩端或四周約束的梁、板和底部約束的地下連續墻進行了收縮應力分析,發現國內外有關文獻出的收縮計算公式沒有考慮泵送商品混凝土的泥用量、外加劑使用、骨料粒徑和砂用量等因素的影響,計算出的混凝土收縮量往往偏小;另外, 《規范》中針對?收縮裂縫的構造措施不足。
  6. It is appropriate for measuring end temperature of bearing liner or other works, e. g., push bearing liner of steamer, supporting bearing liner or push bearing liner of electromotor main axis, bearing liner of coal pulverizer, bearing liner of high efficient feed water pump, bearing liner of compression machine and kinds of other objects inpetrochemical plant

    適用於測量軸瓦或其它機件的端面,如:汽輪機推力軸瓦,電機主軸支持瓦推力瓦,磨煤機大瓦和高效泵軸瓦石油化工廠壓縮機軸瓦和各種機件物體的表面測量。
  7. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口電站工程實際資料,對m方案和n方案場進行了施工期和運行期全過程模擬計算分析,出了拱冠梁剖面和壩體中心縱剖面準穩定場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定場等值線圖,提供了施工期逐月和運行期每年最高、最低等成果,分析了壩體分佈規律以及高區形成的原因,並探討了預埋冷卻管的效果和可行性以及預埋冷卻管的區域。
  8. In the view o6f micro mechanics and fracture mechanics, the mechanism of crack generation of mass concrete is expatiated, thermal stress on the interface between aggregate and cement paste of concrete and crack forming and developing is analyzed and the disciplinarian crack developing with temperature is given

    本文從微觀力學和斷裂力學的角,探討了混凝土結構開裂機理,分析了變過程中混凝土骨料與泥砂漿界面上的應力以及界面裂紋的萌生和擴展,出了裂縫隨變化的擴展規律。
  9. And the report has passed the analysis to ionic membrane caustic soda salt refining handicraft, has suggested that controlling a scheme comparatively rationally, calculation and driving force having carried out the ability choosing a type, circulating to the regulating valve on various appearance ( the temperature, pressure, rate of flow, liquid place, component ) supply a problem waiting for aspect to have done one by one also expound

    本報告通過對離子膜燒堿一次鹽精製工藝的分析,提出了較為合理的控制方案,並對各種儀表(、壓力、流量、液位、成分)進行了選型,對調節閥流通能力計算及動力供問題等方面也都一一作了闡述。
  10. This program can work out some changes made by the operation of wet compression, such as the maximal mass of water spray, the temperature in the outlet of supercharger, and the consumed energy by the supercharger. in addition, this thesis gives the definition of efficiency of wet compression when the entropy of compressed air keeps constant, and it can be the standard for the study of wet compression

    本文首先對增壓柴油機濕壓縮研究的主要部分? ?壓氣機,建立濕壓縮的數學模型,從理論上分析濕壓縮的最大噴量,壓氣機出口,壓氣機耗功等變化情況,並出了等熵濕壓縮的定義,為濕壓縮研究建立了比較標準。
  11. Rubber seals - joint rings for pipelines for hot water supply, drainage and sewerage pipelines up to 110 c - specifications for the material

    橡膠密封件.為110及以下的熱和污管道用連接環.材料規范
  12. This program can predict the wall temperature 、 internal wall heat tranfer coefficient 、 fluid temperature and entropy profile along the water wall. all of these provide an important foundation for designing this type of water wall structure to ensure the safety of the boiler operation. this hydrodynamic calculation program and the results can be used to analyze operation reliability and structure design of water wall system

    利用所開發的程序對設計的超臨界cfb進行了計算,出不同負荷下,冷壁出口工質分佈,冷壁受熱面不同位置處的金屬壁、內壁放熱系數、流體焓值分佈,以及不同管子的流動壓降等結果,為分析鍋爐工作可靠性及冷壁系統的結構設計提供了重要依據。
  13. The iterative algorithm of the 3d unstable temperature field which takes the effect of water pipe cooling into account has been studied, and some skills about determining the nodes and elements of water pipes are also given

    研究了考慮管冷卻效果的不穩定場的迭代演算法,出了確定管結點、單元信息的沿程搜索技巧。
  14. Two conclusions about the tube will be drawn : l ) being used in the heater of 300mw unit, it will cause 57 % decrease of the heater ' s volume and make the workshop ' s area much more smaller, which is gained from the reasonable device of the heater itself ; 2 ) when used in 100mw unit, higher capability lower temperature difference higher feed temperature of the heater will be available and better economic efficiency of the unit will be gained

    應用雙側微肋強化換熱管后體積可以減小為原來的43 ,大大減小了加熱器佔用廠房的面積。 ( 2 )雙側微肋強化換熱管應用於100mw機組熱電廠加熱器時,進行改造中,由於原加熱器存在很多缺陷,使加熱器傳熱性能降低,此時使用雙側微肋強化換熱管對加熱器進行改造時,可以提高加熱器傳熱性能,減少加熱器端差,提高加熱器給水溫度,提高機組的經濟效益。
  15. Through analysis of test data in the field, it shows that the main causes leading to said phenomenon for are : adding water - cooling panel in the furnace ; rising of the feed - water temperature ; and somewhat smaller air flow rate in operation

    通過對其現場測試數據的分析表明,爐內增加冷屏、給水溫度升高以及運行風量偏小是造成其主蒸汽偏低的主要原因。
  16. In this task, a test _ bed for engineering vehicles was developed based on virtual instrument. the whole system comprised 5 parts : the checking of running velocity, which was gotten on the test bed through the vehicles simulating real road running ; the temperature checking of the important points on the transmission system ; the temperature checking of the circling cooling water on the exit port of dynamometers ; the control of the loading power. which was given to vehicles by the power measuring machine ; the control of the total test - run time

    本課題開發的基於虛擬儀器的工程機械跑合試驗臺,其測量和控制參數有:行駛速檢測(車輛在跑合試驗臺上模擬路面的行駛速) ;傳動系檢測(試驗車輛傳動系主要部位多點) ;冷卻檢測(測功機循環冷卻出口) :加載功率控制(測功機施加車輛的載荷) ;跑合時間控制(試驗車輛在試驗臺上加載跑合的總時間) 。
  17. On the other hand, in the new system the heater is set up directly in front of the accelerating tube so that stable cooling water can be supplied, because temperature can be roughly uniform as the lowest portions of the unstable temperature through heating

    ?來冷卻冷卻測定熱交換器冷量三方弁調節。當社加速管直前設不安定谷間加熱安定冷卻可能。
  18. Under the influences of random variabilities, during both construction period and operation period, the temperature field within a gravity dam body could be regarded as a random one. in this paper, stochastic finite element methods are suggested to deal with the random temperature field. by use of the suggested methods, the influences of random environmental and random hydration heat of concrete and the initial temperature of concrete as well as the thermal parameters of both concrete and rock foundation are all taken into account. according to a scheduled time table of construction, random temperature fields of a typical concrete gravity dam within both the construction period and the operation period are calculated by emulation the layer constructing of the dam. some useful conclusions are obtained from the computational results

    由於施工期和運行期各種隨機因素的影響,使重力壩場成為隨機.本文綜合考慮了環境(包括氣和庫) 、混凝土絕熱升、入倉以及混凝土和基巖的熱學參數隨機性的影響,基於隨機有限元法,出了重力壩隨機場的計算方法,對一典型重力壩按定的施工進模擬分層澆築施工過程,對施工期及運行期前期的隨機場進行了計算,並得出了一些有益的結論
  19. Through static emulating calculation of the high - pressure heater, the influence of high - pressure heater leakage upon its operation paeameters, such as outlet temperature of the feed - water, pressure loss of the steam extraction pipeline, and temperature of the drain, has been analysed

    摘要通過對高壓加熱器的靜態模擬計算,分析了高壓加熱器?漏對其運行參數,如出口、抽汽管道壓損、疏的影響。
  20. The model assimilates the latest results in the research and is solved by numerical approach which is called finite - difference equation 。 combined with experimental system, this model simulates the temperature of the water which comes from ground heat exchangers and the round temperature field

    結合實驗系統和傳熱模型,我們對製冷運行中地下換熱器的出及周圍場分佈進行了模擬分析,並出了鉆孔的平均傳熱系數的公式。
分享友人