  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、模板程、混凝土程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等施環節組成。文中介紹的採用胎具製作和鋼筋,分底腹板和頂板分別並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
分享友人