線路分隔 的英文怎麼說

中文拼音 [xiànfēn]
線路分隔 英文
line splitting
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : partitionseparate
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. Adsl splitterless asymmetric digital subscriber line transceivers

    不對稱數字用戶
  2. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場基樁橋面施工的雙程雙接駁斜道,以連接高架引道至落馬洲控制站的現有
  3. The section of hiram s highway between nam wai and ho chung was realigned and widened to a dual 2 - lane road in 2002

    介乎南圍與蠔涌之間的西貢公已重新定,並且擴闊為雙程雙
  4. Lai chi kok viaduct - a 1. 4 - kilometre dual three lane elevated carriageway from lai wan interchange to butterfly valley

    築建荔枝角高架道築建一條長1 . 4公里由荔灣交匯處至蝴蝶谷的雙程三高架車道。
  5. Because the traffic volume in beijing city incessantly rises in recent years, and will continue to rise in future, in order to solve the travel difficulty and to reduce trip time, many loop roads and expressways are built. it is convenient for long - distance traffic, but it is a disadvantage to block - to - block traffic. due to expressway ' s separation from arterial roads, considerable traffic bypass into the grade - crossing intersection under the flyover, and lead to the traffic jam

    由於北京的交通量在近幾年持續增長,並在今後一段期繼續保持增長態勢,為了解決行車難,旅行時間長的問題,北京在修建了大量的環和快速了次幹道和支與主的便捷聯系,使得很多其他繞行交通走行在跨橋下形成的環輔道與主要幹道相交的平面交叉口,也使得此類交叉口交通壓力非常大,從交通構成來看,進口轉彎交通量比例也很大。
  6. Long single two - lane road between pak kung au and cheung sha, including elevated highway structures of a total length of 750 m, with a footpath of a minimum width of 1. 6 m

    長的雙,沿辟設最少1 . 6米闊的行人當中包括總長750米的高架公結構
  7. Realignment and widening of a 500 - metre section of victoria road at the north of its junction with the link road leading to lower baguio villa into a single two - lane carriageway 7. 3 metres wide on the straight section and 7. 9 metres wide on bends

    在與通往下碧瑤灣的連接的交通處以北的一段500米長域多利道,進行重新定及擴闊工程,使之成為一條雙行車道,直的段闊7 . 3米,彎角部闊7 . 9米
  8. Realignment and widening of a 1. 4 - kilometre section of victoria road at the south of its junction with the link road leading to upper baguio villa, into a single two - lane carriageway 7. 3 metres wide on straight sections and 7. 9 metres wide on bends

    在與通往上碧瑤灣的連接的交通處以南的一段1 . 4公里長域多利道,進行重新定及擴闊工程,使之成為一條雙行車道,直的段闊7 . 3米,彎角部闊7 . 9米
  9. Construction of a single two - lane road of about 250 m between castle peak road and san sham road

    在青山公與新深之間興建長約250米的雙
  10. Widening and realignment of a 3. 6 km section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1. 6 m, and construction of a 2. 6 km long single two - lane road between pak kung au and cheung sha, including elevated highway structures of a total length of 750 m, with a footpath of a minimum width of 1. 6 m ; provision of 21 passing bays bus - bays along the road and a roundabout at cheung sha ; and

    在井頭至伯公坳一段長3 . 6公里的東涌道進行擴闊工程,把這段單雙程道改為雙,以供雙程行車,並為這段重新定,另沿設置最少闊1 . 6米的行人,和在伯公坳與長沙之間築建一條長2 . 6公里的雙,包括總長度為750米的高架道構築物,另沿設置最少闊1 . 6米的行人
  11. The contract includes widening of a 1. 1 - kilometre section of castle peak road between ka loon tsuen and tai lam kok from a single three - lane carriageway to a dual two - lane carriageway with a three - metre wide footpath on both sides ; construction of a one - kilometre section of new castle peak road between tai lam kok and siu lam, including a 800 - metre long dual two - lane viaduct ; reconstruction of a 1. 2 - kilometre section of the existing castle peak road between tai lam kok and siu lam ; and implementation of associated landscaping works

    該份合約包括將介乎嘉村和小欖的一千一百米的青山公,由三車道擴闊至雙程雙車道,並在車道兩旁各建一條三米闊的行人。合約亦包括興建一段一千米長的青山公連接大欖角和小欖,其中八百米面是雙程雙車道的高架
  12. Construction of a single two - lane road of 850 m in length for the eastbound traffic from san tin highway to the vha in lok ma chau including 450 m of elevated highway structures

    在新田公至落馬洲車輛輪候區之間興建一條長850米的雙,供東行車輛使用,其中包括興建450米的高架道構築物
  13. Construction of a single two - lane road of 1. 5 - kilometre in length for the westbound traffic from fanling highway to the vehicle holding area in lok ma chau including 800 m of elevated highway structures

    在粉嶺公至落馬洲車輛輪候區之間興建一條長1 . 5公里的雙,供西行車輛使用,其中包括興建800米的高架道構築物
  14. Widening and realignment of a 3. 7km long section of castle peak road between sham tseng and ka loon tsuen, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides

    把深井與嘉村之間一段3 . 7公里長雙車道的青山公擴闊和重新定,由雙車道改為雙程雙車道連兩旁3米闊行人
  15. Widening and realignment of a 3. 7km long section of castle peak road between sham tseng and ka loon tsuen, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides ; construction of five covered footbridges

    1 .把深井與嘉村之間一段3 . 7公里長雙車道的青山公擴闊和重新定,由雙車道改為雙程雙車道連兩旁3米闊行人
  16. Construction of a single two - lane road of 50 m in length connecting kwu tung road to the road mentioned in paragraph above

    興建長50米的雙,把古洞與上文a段所述的道連接起來
  17. Section of tung chung road between lung tseng tau and pak kung au from a single - lane road for two - way traffic to a single two - lane road for two - way traffic with a footpath having a minimum width of 1. 6 m ; construction of a

    長的東涌道進行擴闊工程,由單雙程道改為雙,沿辟設最少1 . 6米闊的行人,並為這段道重新定
  18. Modification of the junction of sth cpr tun yu road including signalisation of the junction of cpr and slip roads from sth, and widening of a 300 - m section of cpr from a single two - lane to a dual two - lane road

    修建新田公青山公淳裕交界處,包括在青山公與新田公的交界處設置燈號控制設施,以及把青山公一個長300米的段由雙車道擴闊為雙程雙
  19. Widening and realignment of a 4. 6km long section of castle peak road between area 2 and sham tseng, tsuen wan to dual two - lane carriageway with 3m wide footpath on both sides ; construction of a 300 - metre long single lane flyover in ting kau and six covered footbridges

    把荃灣第2區與深井之間一段4 . 6公里長的青山公擴闊和重新定,由雙車道改為雙程雙車道連兩旁3米闊行人
  20. Widening and realignment of a 4. 6km long section of castle peak road between area 2 and sham tseng, tsuen wan to a dual two - lane carriageway with 3m wide footpath on both sides ; construction of a 300 - metre long single lane flyover in ting kau and six covered footbridges

    把荃灣第2區與深井之間一段4 . 6公里長的青山公擴闊和重新定,由雙車道改為雙程雙車道連兩旁3米闊行人
分享友人